- About ADB
-
Organization
- Overview
- Key Facts
- Members
- Board of Governors
- Board of Directors
- Management
- Departments and Offices
- Policies and Strategies
- Partners
- Annual Meetings
- FAQs
- Independent Evaluation
-
- News & Events
- Data & Research
-
Research at ADB
- Publications
- Statistics and Databases
- Seminars and Lectures
- Links
- Contacts
-
- Publications
- Sectors & Themes
- Projects
- Countries
-
Subregional Programs
- Brunei Darussalam-Indonesia-Malaysia-Philippines East ASEAN Growth Area (BIMP-EAGA)
- Central Asia Regional Economic Cooperation (CAREC)
- Greater Mekong Subregion (GMS)
- Indonesia-Malaysia-Thailand Growth Triangle (IMT-GT)
-
Other Offices
- European Representative Office
- Japanese Representative Office
- North American Representative Office
- Pacific Liaison and Coordination Office
- South Pacific Subregional Office
-
Countries with Operations
- Afghanistan
- Armenia
- Azerbaijan
- Bangladesh
- Bhutan
- Cambodia
- China, People's Republic of
- Cook Islands
- Fiji
- Georgia
- India
- Indonesia
- Kazakhstan
- Kiribati
-
Advance Action on Recruitment of Consultants
Request for Expression of Interest for the Management, Design, Supervision, Feasibility Study and Architecture ConsultantsCountry/Borrower: Pakistan
Title of Proposed Project: Renewable Energy Development Sector Investment Project
Brief Description of Project:The Government of Pakistan has applied for a loan from the Asian Development Bank (ADB) and intends to spend a portion of the loan for payments under the contract for Management, Design and Supervision Consultants to provide Consultancy Services for the Renewable Energy Development (Projects) in North-West Frontier Province (NWFP) of Pakistan. The scope of the services under the project consists of the following packages:
- Management, Design and Supervision Consultant for 36 MW Daral Khwar HPP (for EPC Contract);
- Management, Design and Supervision Consultant for 11.5 MW Ranolia Khwar HPP (for EPC Contract);
- Management, Design and Supervision Consultant for 2.6 MW Machai Canal HPP (for EPC Contract);
- Consultant for Feasibility studies of three hydropower projects (raw sites) i.e. 18 MW Koto HPP, Distt. Dir, 8 MW Jabori HPP, Distt. Mansehra and 7.5 MW Karora (New) HPP, Distt. Shangla; and
- Architect/Consultant for Design & Construction Supervision of Office Building in Phase V Hayatabad, Peshawar "SHYDO House."
- Construction of hydropower projects;
- Feasibility studies of new hydropower projects;
- Capacity building of Sarhad Hydel Development Organization (SHYDO).
- the background, organization and experience of the firm, including works done and at hand during the last ten years
- detail resume of each of the proposed professional staff to be assigned to carry out the services etc.
- Financial resources
- Annual turnover (at least last five years)
- Audit Report (at least last three years),
- Registration with Pakistan Engineering Council if the consultant is short listed.
Managing Director
Sarhad Hydel Development Organization (SHYDO)
372-WAPDA House, Shami Road, Peshawar - NWFP, Pakistan
Ph. + 92-91-9212034, 9212026 Fax. +92-91-9211988