- About ADB
-
Organization
- Overview
- Key Facts
- Members
- Board of Governors
- Board of Directors
- Management
- Departments and Offices
- Policies and Strategies
- Partners
- Annual Meetings
- FAQs
- Independent Evaluation
-
- News & Events
- Data & Research
-
Research at ADB
- Publications
- Statistics and Databases
- Seminars and Lectures
- Links
- Contacts
-
- Publications
- Sectors & Themes
- Projects
- Countries
-
Subregional Programs
- Brunei Darussalam-Indonesia-Malaysia-Philippines East ASEAN Growth Area (BIMP-EAGA)
- Central Asia Regional Economic Cooperation (CAREC)
- Greater Mekong Subregion (GMS)
- Indonesia-Malaysia-Thailand Growth Triangle (IMT-GT)
-
Other Offices
- European Representative Office
- Japanese Representative Office
- North American Representative Office
- Pacific Liaison and Coordination Office
- South Pacific Subregional Office
-
Countries with Operations
- Afghanistan
- Armenia
- Azerbaijan
- Bangladesh
- Bhutan
- Cambodia
- China, People's Republic of
- Cook Islands
- Fiji
- Georgia
- India
- Indonesia
- Kazakhstan
- Kiribati
-
Advance Action on Procurement, Recruitment of Consultants and Retroactive Financing
Country/Borrower: People's Republic of China
Title of Proposed Project: Jilin Urban Environmental Improvement Project
Name and Address of Executing Agency:
Jilin Province Construction DepartmentBrief Description of the Project:
Mr. Chu Minhua, Deputy Director General, Jilin Province Construction Department
Mr. Wang Yuxin, Director, PMO
Fax No.: 86431 8275253
Email: jilinpmo@126.com
Address: Construction Mansion, 287 Guiyang St., Kuancheng District
Changchun, Jilin, PRC 130051
The Project is designed to enhance the urban environment and improve public health and quality of life for urban residents in the cities of Changchun and Yanji, by increasing wastewater coverage, enhancing solid waste management, improving the supply of potable water and reducing air pollution. The Project has 3 components and related capacity development which include improved and expanded water supply, wastewater services and solid waste management in Changchun, improved and expanded water supply and wastewater facilities in Yanji, improved air quality in Yanji through more efficient central heating system, and institutional capacity development for effective and efficient project implementation and management. The Project will:
- construct No. 5 WTP with a capacity of 300,000 m3/day, 25.5 km of water transmission pipelines, 58.15 km of distribution network and two pumping stations;
- construct of the Dongnan WWTP with a treatment capacity of 100,000 m3/day, 53.46 km of sewer network, 34.2 km of stormwater pipelines, and 23.5 km of wastewater interceptors;
- construct of a sanitary landfill facility with a capacity of 2,600 tons per day with a 10 year service life, and an additional expected life of 12 years after expansion;
- construct of a WWTP with a capacity of 60,000 m3/day, 10.5 km of raw water transmission pipelines, 9 km of distribution mains, and 35.7 km of water distribution pipelines;
- construct of a effluent reuse WWTP with a capacity of 50,000 m3/day, 15.1 km of water reuse transmission mains, and 40 km of sewer network;
- provide central heating to an area of 6.97 million m2 south of the Buerhatong River, and includes 42.52 km of heating pipelines, 6.2 km of steam pipelines, 35 heat exchange stations, and one booster pumping station; and
- provide central heating to an area of 9.3 million m2 north of the Buerhatong River, and includes 77.6 km of heating pipelines, and 64 heat exchange stations.