- About ADB
-
Organization
- Overview
- Key Facts
- Members
- Board of Governors
- Board of Directors
- Management
- Departments and Offices
- Policies and Strategies
- Partners
- Annual Meetings
- FAQs
- Independent Evaluation
-
- News & Events
- Data & Research
-
Research at ADB
- Publications
- Statistics and Databases
- Seminars and Lectures
- Links
- Contacts
-
- Publications
- Sectors & Themes
- Projects
- Countries
-
Subregional Programs
- Brunei Darussalam-Indonesia-Malaysia-Philippines East ASEAN Growth Area (BIMP-EAGA)
- Central Asia Regional Economic Cooperation (CAREC)
- Greater Mekong Subregion (GMS)
- Indonesia-Malaysia-Thailand Growth Triangle (IMT-GT)
-
Other Offices
- European Representative Office
- Japanese Representative Office
- North American Representative Office
- Pacific Liaison and Coordination Office
- South Pacific Subregional Office
-
Countries with Operations
- Afghanistan
- Armenia
- Azerbaijan
- Bangladesh
- Bhutan
- Cambodia
- China, People's Republic of
- Cook Islands
- Fiji
- Georgia
- India
- Indonesia
- Kazakhstan
- Kiribati
-
Advance Action on Recruitment of Consultants
Invitation for Submission of Expression of Interest (EOI) Consulting Services for Project Implementation (Detailed Design and Construction Supervision)Country/Borrower: Socialist Republic of Viet Nam
Project: VIE: Greater Mekong Subregion Southern Coastal Corridor Project - Viet Nam Component
1. The Government of Viet Nam has applied for a loan from the Asian Development Bank (ADB) and a grant from the Government of Australia (AusAID) toward the cost of part of the GMS-Southern Coastal Corridor Project - Vietnam Component (The Project). The work to be funded by ADB and AusAID is hereinafter referred to as the ADB/AusAID sub-component. Part of these funds will be applied for payment for Consulting Services for which this Invitation for Expressions of Interest is issued. 2. The Executing Agency for the Project will be the Viet Nam Road Administration (VRA) (under the Ministry of Transport (MOT) and the Project Implementing Unit (PIU) will be the My Thuan Projects Management Unit (PMU-My Thuan). Under the ADB/AusAID sub-component of the Project VRA intends to rehabilitate and improve about 60.1 km of the Southern Coastal Corridor that will include:- Xa Xia-Ha Tien bypass and border facilities (about 4.3km),
- An Minh bypass-Nga Bac canal (about 14.3km), and
- Nga Bac canal-Ca Mau (about 41.5km).
- assisting PMU-MT to confirm the scope of improvements;
- to prepare detailed engineering designs, cost estimates and bid documents suitable for international competitive bidding (ICB), (for the cross border facilities at Xa Xia this work will include architectural designs, as appropriate, and bid documents will be prepared using National Competitive Bidding (NCB) procedures);
- to assist PMU-MT in the finalization of Resettlement Plans of all road sections in the Project;
- to carry out feasibility studies of constructing a new road parallel to QL63 between Minh Luong and Thu Bay and parallel TL7 between Thu Bay and the Nga Bac Canal instead of widening these roads;
- to assist PMU-MT in the prequalification and bidding process and bid evaluations of the civil works contracts;
- to function as 'the Engineer' in administering all civil works contracts in ADB/AusAID sub-component and ensuring completion of construction in accordance with the contract provisions;
- to assist PMU-MT and Kien Giang and Ca Mau provinces in the implementation of resettlement plans for all contracts,
- to assist PMU-MT in the implementation of an HIV/AIDS/STDs Awareness and Prevention Program and a Human Trafficking Prevention Program;
- to assist PMU-MT in ensuring compliance with the ADB Environmental Guidelines and environmental mitigation plans in contracts in the ADB/AusAID sub-component; and
- to provide on-job-training training to PMU-MT staff in civil works construction administration, implementation of resettlement plans and monitoring of environmental management plans.
The PMU- My Thuan
127 B Dinh Tien Hoang Str.
Ward 3
Binh Thanh District
Ho Chi Minh City
Viet Nam Attn: Mr. Duong Tuan Minh,
General Director of PMU-My Thuan Telephone: + 08 841 0088
Facsimile: + 08 841 1872
E-mail: qldaxa@vnn.vn