- About ADB
-
Organization
- Overview
- Key Facts
- Members
- Board of Governors
- Board of Directors
- Management
- Departments and Offices
- Policies and Strategies
- Partners
- Annual Meetings
- FAQs
- Independent Evaluation
-
- News & Events
- Data & Research
-
Research at ADB
- Publications
- Statistics and Databases
- Seminars and Lectures
- Links
- Contacts
-
- Publications
- Sectors & Themes
- Projects
- Countries
-
Subregional Programs
- Brunei Darussalam-Indonesia-Malaysia-Philippines East ASEAN Growth Area (BIMP-EAGA)
- Central Asia Regional Economic Cooperation (CAREC)
- Greater Mekong Subregion (GMS)
- Indonesia-Malaysia-Thailand Growth Triangle (IMT-GT)
-
Other Offices
- European Representative Office
- Japanese Representative Office
- North American Representative Office
- Pacific Liaison and Coordination Office
- South Pacific Subregional Office
-
Countries with Operations
- Afghanistan
- Armenia
- Azerbaijan
- Bangladesh
- Bhutan
- Cambodia
- China, People's Republic of
- Cook Islands
- Fiji
- Georgia
- India
- Indonesia
- Kazakhstan
- Kiribati
-
Loan No. 1732(SF): Rural Electrification, Distribution, and Transmission Project
Invitation for Bids
Date: 14 September 2005Loan No. 1732: Rural Electrification, Distribution and Transmission Project
Contract: GSR 2005/06-01
Deadline for Bids: 14 November 2005
The Kingdom of Nepal has received a loan from the Asian Development Bank (ADB) towards the cost of the Rural Electrification, Distribution and Transmission Project. Part of this loan will be used for payments under the contract named above. Bidding is open to bidders from eligible source countries of the ADB. This Contract will be jointly financed by OPEC. The eligibility rules and procedures of the ADB will govern the bidding process. Nepal Electricity Authority (NEA) (the Employer) invites sealed bids from eligible bidders for the supply and construction/reinforcement of 132 kV grid substations ("the Works") consisting of design, supply, construction, erection, testing and commissioning of the following works on turnkey basis:
- Reinforcement of Anarmani substation by installing one unit of new 132/33 kV, 30 MVA, 3-phase power transformer with control and protection panels complete. The scope also includes the necessary bay extension at 132 kV and 33 kV voltage levels.
- Reinforcement of Pokhara substation by installing one unit of new 132/11 kV, 30 MVA, 3-phase power transformer with control and protection panels complete. The scope also includes the necessary bay extension at 132 kV voltage level and replacement of one section of existing 11 kV switchgear panels comprising of seven panels.
- Reinforcement of Siuchatar substation by installing one unit of new 132/66 kV, 3x12.6 MVA power transformers (bank of three single phase transformers) with control and protection panels, power cables complete. The scope also includes the necessary bay extension at 132 kV and 66 kV voltage levels.
Grid Substations Reinforcement ProjectTo purchase the bidding documents in English, eligible bidders should:
Transmission Line/Substation Construction Department
Nepal Electricity Authority
Durbarmarg, Kathmandu, Nepal
Tel: +977-1-4226889
Fax: +977-1-4243746
Email: tldept@wlink.com.np
NEA web page: www.nea.org.np
- write to address above
- pay a non-refundable fee of NRs25,000 or US$355 by depositing the money in Account No. 001-04270'C' at Everest Bank, New Baneshwor, Kathmandu, Nepal and the original bank voucher must be attached with the application.
- to the address above
- on or before the deadline: 12:00 hours, on 14 November 2005
- together with a Bid Security of US$57,000 or an equivalent amount in a freely convertible currency. The bid security must be included in the Technical Proposal.
Specific Notice