- About ADB
-
Organization
- Overview
- Key Facts
- Members
- Board of Governors
- Board of Directors
- Management
- Departments and Offices
- Policies and Strategies
- Partners
- Annual Meetings
- FAQs
- Independent Evaluation
-
- News & Events
- Data & Research
-
Research at ADB
- Publications
- Statistics and Databases
- Seminars and Lectures
- Links
- Contacts
-
- Publications
- Sectors & Themes
- Projects
- Countries
-
Subregional Programs
- Brunei Darussalam-Indonesia-Malaysia-Philippines East ASEAN Growth Area (BIMP-EAGA)
- Central Asia Regional Economic Cooperation (CAREC)
- Greater Mekong Subregion (GMS)
- Indonesia-Malaysia-Thailand Growth Triangle (IMT-GT)
-
Other Offices
- European Representative Office
- Japanese Representative Office
- North American Representative Office
- Pacific Liaison and Coordination Office
- South Pacific Subregional Office
-
Countries with Operations
- Afghanistan
- Armenia
- Azerbaijan
- Bangladesh
- Bhutan
- Cambodia
- China, People's Republic of
- Cook Islands
- Fiji
- Georgia
- India
- Indonesia
- Kazakhstan
- Kiribati
-
Invitation for Bids
| Date | : | 1 September 2006 |
| Loan Nos. | : | 2060-PAK(SF)/2061-PAK: Southern Punjab Basic Urban Services |
| Contract No. | : | ICB-SWD-EM-MUL-01 |
| Deadline for Bids: | : | 13 October 2006 |
- Replacement of existing pumping machinery which includes dismantling/de-fitting of existing machinery=8 Jobs, Making foundation of pumping machinery, Providing and Fixing of Pumping Machinery of 1530 Cu.M/Hour capacity16 Meter head Revolution Per Minute less than 1000 = 9 Sets
- Providing & Fixing of sump pump capacity 14 Litre/Sec = 3 Sets
- Chain pull block, Cast Iron. Specials = 53,200Kg. Providing & Laying of Cast-Iron. pipe inner diameter 800mm, Excavation = 775 Cu.M., cement pointing, Providing & Laying of topping, re-conditioning of 500 KVA Diesel Generator Set and 250 KVA Diesel Generator Set
- Minimum average annual turnover from construction business over the last five years of US$1.5 million
- Carried out at least 2 similar projects with a value of at least US$1.0 million each The contract completion period will be twelve (12) months.
Project Coordination Office,5. To purchase the bidding documents in English, eligible bidders should:
47-L Gulberg III, Lahore, Pakistan
Tel. No: +92 42 5843268 & 5843272
Fax No: +92 42 5843267
Email address: mailto:pcospbusp@yahoo.com
- write to address above requesting the bidding documents for Contract No. ICB-SWD-EM-MUL-01 ( Rehabilitation of Wastewater Disposal Station Suraj Miani (Part-1), Multan)
- pay a non-refundable fee of Rs 18,000 or US$300 by Bank draft or Pay Order issued by a scheduled Bank in favor of Project Coordinator, SPBUSP
- to the address above
- on or before the deadline: 11:00 am on 13 October 2006
- together with a Bid Security of 2% of the Total Bid Price.
Specific Notice