Loan 2261: Second Power Transmission and Distribution Project

The Kingdom of Cambodia has received for a loan from the Asian Development Bank (ADB) toward the cost of Second Power Transmission and Distribution Project. The loan was approved 4 October 2006.

The Project will
  1. directly expand the 230 kV power transmission grid from Kampot to Sihanoukville to provide sustainable and reliable electricity supply at affordable prices to consumers in Sihanoukville and adjacent areas along the transmission corridor, and
  2. improved Electricite du Cambodge's operational efficiency and performance through institutional development and capacity building.

Procurement
Goods and services from the loan will be procured in accordance with ADB's Guidelines for Procurement. Through International Competitive Bidding:
  1. Turnkey contract for:
    • 230 kV transmission line (including spare parts and training)
    • Substations at Sihanoukville, Veal Renh, and Kampot extension
  2. Supply of materials and equipment, and installation of medium-voltage (22 kV) and low-voltage (400 v) distribution system
  3. Supply of hardware and software for (EDC) information system

Consulting Services
About 40 person-months of international and 45 person-months of national consultant inputs will be required. EDC will recruit the consultants through a firm, according to ADB's Guidelines on the Use of Consultants and other arrangements satisfactory to ADB for the selection and hiring of national consultants.

Interested bidders from ADB's member countries who wish obtain additional information may contact:
Electricite du Cambodge
Fax. No. : (855) 23 426 018
Tel. No. : (855)23 426 018
Address : St. 19 Wat Phnom
Daun Penh District
Phnom Penh, 12200
Cambodia
 

 


General Procurement Notice