- About ADB
-
Organization
- Overview
- Key Facts
- Members
- Board of Governors
- Board of Directors
- Management
- Departments and Offices
- Policies and Strategies
- Partners
- Annual Meetings
- FAQs
- Independent Evaluation
-
- News & Events
- Data & Research
-
Research at ADB
- Publications
- Statistics and Databases
- Seminars and Lectures
- Links
- Contacts
-
- Publications
- Sectors & Themes
- Projects
- Countries
-
Subregional Programs
- Brunei Darussalam-Indonesia-Malaysia-Philippines East ASEAN Growth Area (BIMP-EAGA)
- Central Asia Regional Economic Cooperation (CAREC)
- Greater Mekong Subregion (GMS)
- Indonesia-Malaysia-Thailand Growth Triangle (IMT-GT)
-
Other Offices
- European Representative Office
- Japanese Representative Office
- North American Representative Office
- Pacific Liaison and Coordination Office
- South Pacific Subregional Office
-
Countries with Operations
- Afghanistan
- Armenia
- Azerbaijan
- Bangladesh
- Bhutan
- Cambodia
- China, People's Republic of
- Cook Islands
- Fiji
- Georgia
- India
- Indonesia
- Kazakhstan
- Kiribati
-
Invitation for Bids
| Date | : | 26 July 2007 |
| Loan No. | : | 2308-IND: Uttarakhand State Road Investment Program - Project 1 |
| Contract Nos. | : | GIS-KSUDP-01; GIS-KUSDP-02 |
| Deadline for Bids | : | 16 August 2007 |
| Contract No | Districts | Road Details | Completion Period (in months) |
Amount of Bid Security (Rs in million) | |
|---|---|---|---|---|---|
| Name | Length (km) | ||||
| Contract 1 | Dehradun | Kalsi Chakrata | 12.00 | 18 | 2.4 |
| Contract 1A | Uttarkashi | Kuwa-Kafnol Rahri | 47.546 | 18 | 3.5 |
| Naugaon Purala | 17.888 | ||||
| Contract 3 | Chamoli and Rudraprayag | Nand Prayag Ghat motor road | 18.493 | 18 | 3.4 |
| Rudraprayag Pokhri Karanprayag | 14.512 | ||||
| Jakholi Guptkashi motor road | 14.375 | ||||
- Minimum average annual construction turnover (inclusive of escalation), calculated as total certified payment received for contracts in progress or completed, within the last five years (with base year as 2007-2008) of equal or more than the amount indicated in table below.
- General Construction Experience by participation as contractor, management contractor or subcontractor, in at least two contracts within the last five years, each with a value equal or more than the amount indicated in table below, that have been successfully or substantially completed and that are similar to the proposed works. The similarity shall be based on the physical size, complexity, method, technology, or other characteristics as described in Section VI of Bid Document.
- Specific Construction Experience in the key activities shown in the table below.
- Should be able to deploy key personnel and equipment to match his work program and complete the works within the time of completion of works and during the maintenance period subject to the minimum of two units each of computerized hot mix plant (minimum capacity of 45 tonnes per hour), sensor paver finisher 3.75 meter width, road rollers (80 KN-100KN) and excavator/JCB/Dozer, three unit of concrete mixers (150 liters capacity) and one unit each of road roller PTR and vibratory road roller.
- Should not have pending litigation more than 50 of the bidder's current net worth.
| Qualification Criteria | Contract Package | Minimum Requirement | ||||||
|---|---|---|---|---|---|---|---|---|
| Average Annual Construction Turnover | Contract 1 | INR 120 million | ||||||
| Contract 1A | INR 175 million | |||||||
| Contract 3 | INR 170 million | |||||||
| General Construction Experience | Contract 1 | INR 96 million | ||||||
| Contract 1A | INR 140 million | |||||||
| Contract 3 | INR 136 million | |||||||
| Specific Construction Experience | ||||||||
| (i) Bituminous works (PC. SDBC,& BM) | Contract 1 | (i)220 cu.m. per month | ||||||
| (ii)90 cu.m. per month | ||||||||
| (iii)390 cu.m. per month | ||||||||
| (ii) Water Bound Macadam | Contract 1A | (i)490 cu.m. per month | ||||||
| (ii)109 cu.m. per month | ||||||||
| (iii)650 cu.m. per month | ||||||||
| (iii) Structural Concrete | Contract 3 | (i)270 cu.m. per month | ||||||
| (ii)780 cu.m. per month | ||||||||
| (iii)590 cu.m. per month | ||||||||
Project Director8. Deliver your bid:
Project Management Unit (ADB)
Public Works Deparment
19 Siddharth Enclave,
G.M.S. Road,
Dehradun - 248001
Tel. No. 0135-6540169, 2722825
Fax No. 0135-2722911
E-mail: pmuadb@yahoo.co.in
Website:www.ua.nic.in
- to the address above
- on or before the deadline: 16 August 2007
- together with the Bid Security in the amount listed in the above table.
Specific Notice