- About ADB
-
Organization
- Overview
- Key Facts
- Members
- Board of Governors
- Board of Directors
- Management
- Departments and Offices
- Policies and Strategies
- Partners
- Annual Meetings
- FAQs
- Independent Evaluation
-
- News & Events
- Data & Research
-
Research at ADB
- Publications
- Statistics and Databases
- Seminars and Lectures
- Links
- Contacts
-
- Publications
- Sectors & Themes
- Projects
- Countries
-
Subregional Programs
- Brunei Darussalam-Indonesia-Malaysia-Philippines East ASEAN Growth Area (BIMP-EAGA)
- Central Asia Regional Economic Cooperation (CAREC)
- Greater Mekong Subregion (GMS)
- Indonesia-Malaysia-Thailand Growth Triangle (IMT-GT)
-
Other Offices
- European Representative Office
- Japanese Representative Office
- North American Representative Office
- Pacific Liaison and Coordination Office
- South Pacific Subregional Office
-
Countries with Operations
- Afghanistan
- Armenia
- Azerbaijan
- Bangladesh
- Bhutan
- Cambodia
- China, People's Republic of
- Cook Islands
- Fiji
- Georgia
- India
- Indonesia
- Kazakhstan
- Kiribati
-
Invitation for Bids (Rebidding)
| Date | : | 3 August 2007 |
| Loan No: | : | 2006-KAZ: Rural Area Water Supply and Sanitation Sector Project |
| Contract No. | : | ICB-RAWSSSP-01 |
| Deadline for Bids | : | 13 September 2007 |
- Replacement of 110 mm dia pipeline, about 3000 meters;
- Installation of about 10,000 meter of water distribution network in low pressure with Poly-Ethylene pipes of diameter 110 mm to 63 mm, installation of 50 public outlets and 51 fire fighting hydrants plus 6 individual supply connections to public service buildings, primarily in trenches of 3.0 meter depth;
- Rehabilitation of two concrete reservoir structures with 500 m3 capacity;
- Rehabilitation of a one pumping station, including supply and installation of 3 centrifugal pumping units, capacity 5-7kw, 200 m3/day, 380V power supply;
- Rehabilitation of a steel water tower with 18 meter height and a 50 m3 capacity tank made of welded steel panels; and
- Provision of all material for replacement of some 400m external power supply lines, 0.400 kV.
- Drilling of 2 No. deep wells of 50 m depth;
- Supply and installation of 2 No. submersible pumps, 17kW capacity;
- Connection between the two new deep wells by 6km long 160mm dia pipeline;
- Rehabilitation of existing ground reservoir structure (6 compartments) and air filters;
- Installation of 8 km water distribution network of low pressure Poly-Ethylene pipes of diameter 160 mm to 63mm, including installation of 53 public outlets and 73 fire fighting hydrants plus 5 individual supply connections to public service buildings, primarily in trenches of 3.0m depth;
- Rehabilitation of one existing service pumping station, including supply and installation of centrifugal pumping units, size 5.5 kVA, capacity 30m3/hr, 380V power supply, for delivery of water to the elevated tank and fire fighting and 2 pumps 1.5kW for drainage; and
- Rehabilitation of an existing steel water tower with 18m height and a 50 m3 capacity tank.
- Minimum average annual turnover from construction business over the last three years of US$2.8 million
- Carried out at least two similar projects with a value of at least US$1.4 million each. The contract completion period will be fifteen (15) months.
Deputy Chairman, Committee of Water Resources5. To purchase the bidding documents in English, eligible bidders should:
Central Project Coordination Unit, Office 4, 5
Bogenbya Street 46, Astana City, Kazakhstan
Tel/Fax: (3172) 32 38 87, 32 38 83
Email addresses: loan2006@mail.ru, mkalima@mail.ru
- write to address above requesting the bidding documents for Contract No. ICB-RAWSSSP-01 (Northern Kazakhstanskaya oblast)
- pay a non-refundable fee of KZT37,500 or US$ 300 by bank draft or pay order issued by a scheduled Bank in favor of the Central Project Coordination Unit, RAWSSP
- to the address above
- on or before the deadline: 16:00 p.m. on 13 September 2007.
- together with a Bid Security of 2% of the Total Bid Price
Specific Notice