- About ADB
-
Organization
- Overview
- Key Facts
- Members
- Board of Governors
- Board of Directors
- Management
- Departments and Offices
- Policies and Strategies
- Partners
- Annual Meetings
- FAQs
- Independent Evaluation
-
- News & Events
- Data & Research
-
Research at ADB
- Publications
- Statistics and Databases
- Seminars and Lectures
- Links
- Contacts
-
- Publications
- Sectors & Themes
- Projects
- Countries
-
Subregional Programs
- Brunei Darussalam-Indonesia-Malaysia-Philippines East ASEAN Growth Area (BIMP-EAGA)
- Central Asia Regional Economic Cooperation (CAREC)
- Greater Mekong Subregion (GMS)
- Indonesia-Malaysia-Thailand Growth Triangle (IMT-GT)
-
Other Offices
- European Representative Office
- Japanese Representative Office
- North American Representative Office
- Pacific Liaison and Coordination Office
- South Pacific Subregional Office
-
Countries with Operations
- Afghanistan
- Armenia
- Azerbaijan
- Bangladesh
- Bhutan
- Cambodia
- China, People's Republic of
- Cook Islands
- Fiji
- Georgia
- India
- Indonesia
- Kazakhstan
- Kiribati
-
Invitation for Bids
| Date | : | 27 August 2009 |
| Loan No. & Title | : | 2438-PAK: Power Distribution Enhancement Investment Program |
| Contract No. | : | ADB-HESCO-07-2009 for Procurement of Hardware Material |
| Deadline for Bids | : | 12:00 A.M on 15 October 2009 |
1. The Islamic Republic of Pakistan has received a loan from the Asian Development Bank (ADB) toward the cost of Power Distribution Enhancement Investment Project, and it intends to apply part of the proceeds of this loan to payments under the contract for Procurement of Hardware Material.
2. The Hyderabad Electricity Supply Company Limited, HESCO (the Employer) invites sealed bids from eligible bidders for supply of Hardware Material.
| Lot No. | Item | Description of Material | Quantity (Nos) |
|---|---|---|---|
| I | |||
| Hardware Items / Accessories (Per Pole / Per Structure For Elr Works) | |||
| Pre-Insulated Joint Sleeves | |||
| 01 | i. Pre-Insulated Joint Sleeves for 95mm2 | 2,750 | |
| 02 | ii Pre-Insulated Joint Sleeves for 70mm2 | 2,750 | |
| 03 | iii Pre-Insulated Joint Sleeves for 50mm2 | 440 | |
| 04 | iv. Pre-Insulated Joint Sleeves for 25mm2 | 5,380 | |
| 05 | v. Pre-Insulated Joint Sleeves for 16mm2 | 440 | |
| End Caps For Cables | |||
| 06 | i. End Caps for 95mm2 Cables | 2,740 | |
| 07 | ii. End Caps for 70mm2 Cables | 4,100 | |
| 08 | iii. End Caps for 50mm2 Cables | 440 | |
| 09 | iv. End Caps for 25mm2 Cables | 7,170 | |
| 10 | v. End Caps for 16mm2 Cables | 440 | |
| 11 | Insulated suspension clamp (Brackets and Clamp) | 19,050 | |
| 12 | Dead End Clamp Assembly for ABC (Bracket and retention clamp) |
9,020 | |
| 13 | Bracket for clamping sets on post piller and pipes for use of service connections | 309,980 | |
| Bi-Metalic (Al-Cu) Insulated Lugs | |||
| 14 | i. Bi-metalic (Al-Cu) Insulated Lugs for 95mm2 | 2,230 | |
| 15 | ii. Bi-metalic (Al-Cu) Insulated Lugs for 70mm2 | 2,230 | |
| 16 | Insulated support | 2,720 | |
| 17 | Adjustable retention clamp | 915 | |
| 18 | Stain less strap, width = 20mm, thickens 0.7mm | 35,030 | |
| 19 | Bukle for stain less steel strap | 150,050 | |
| 20 | Plastic Binding strap 350mm | 627,040 | |
| II | |||
| Circuit Breakers For Distribution Transformers (ELR Works) | |||
| 01 | Circuit Breakers for Distribution Transformers (ELR Works) | 1,160 | |
| 02 | Piercing connectors for connection with Main to Sub Main | 25,950 | |
| 03 | Connector for Fuse Holder Switch | 3,480 | |
| 04 | Piercing connectors for consumers | 396,300 | |
3. International competitive bidding will be conducted in accordance with ADB's Single-Stage: One-Envelope Bidding Procedure and is open to all Bidders from eligible source countries of ADB.
4. To obtain further information and inspect the Bidding Documents, bidders should contact:
Manager Procurement (PMU), HESCO
Bunglow No/ A-1, HESCO Power Wing Colony, Hussainabd
Hyderabad Pakistan
Tel. No.: +92-22-9260070, 3868690
Fax No.: +92-22-3812299
Email: mmmhesco@yahoo.com
5. To purchase the bidding documents in English, bidders should:
- visit the office of HESCO at the address indicated above and pay a non-refundable fee of PRs.8,000 or US$ 100 by Bank Draft from any Scheduled Bank of Pakistan in favor of HESCO, Bunglow No/A-1, HESCO Power Wing Coloby, Hussainabd, Hyderabad (Pakistan),
or
- request for delivery by sending a written application to HESCO at the address indicated above, requesting for Bidding Document No. ADB-HESCO-07-2009, for Procurement of Hardware Material. The method of payment will be by Bank Draft from any Scheduled Bank of Pakistan in favor of HESCO, Bunglow No/ A-1, HESCO Power Wing Colony, Hussainabd, Hyderabad (Pakistan), for the amount of PKR 10,000 (local delivery) or $200 (overseas delivery). The document will be sent by courier service. No liability will be accepted for loss or late delivery.
7. Deliver your bid:
- to the address above;
- on or before 12:00 A.M on 15 October 2009.
- together with a Bid Security as follows:
LOT - I = 2% of total bid prices mentioned in US$ or Pak Rupees
LOT - II = 2% of total bid prices mentioned in US$ or Pak Rupees.
8. Bids will be opened immediately after the deadline in the presence of bidders' representatives who choose to attend.
9. When comparing Bids, ADB's Domestic Preference Scheme will be applied.
10. HESCO will not be responsible for any costs or expenses incurred by Bidders in connection with the preparation or delivery of Bids.
Specific Notice