Prequalified Contractors As of August 2009

Loan No./Project:2429-VIE: Song Bung 4 Hydropower Project
Package 1 (XL-01) and Package 2 (XL-02)
Contract:Civil Works

Prequalified ContractorsCountry
Package 1 (XL-01) - Preparation of Engineering and Construction Drawings and Civil Works Construction of Headworks
Estimated Cost US$ 64.7 million
 
1 -   Song Da CorporationVietnam
2 -   JV (a) Ozaltin and (b) Hindustan Construction Co. Ltd. (a)Turkey (b) India
3 -   Consortium (a) East China Investigation and Design Institute under CHECC and (b) China Gezhouba Group (a) PRC (b) PRC
4 -   Sinohydro CorporationPRC
Package 2 (XL-02) - Preparation of Engineering and Construction Drawings and Civil Works Construction of Waterways
Estimated Cost US$ 44.0 million
 
1 -   SK Engineering and Construction Korea
2 -   Hindustan Construction Co. Ltd. India
3 -   Consortium (a) East China Investigation and Design Institute under CHECC and (b) Gezhouba Group Company Limited(a) PRC (b) PRC
4 -   Sinohydro Corporation Ltd.PRC
5 -  Consortium (a) Mid-South Design and Research Institute (b) Guangdong No. 2 Hydropower Engineering Bureau (GHEB2) (a)PRC (b)PRC