Asian Development Bank - Fighting Poverty in Asia and the Pacific
What's New  |   e-Notification  |   Sitemap  |   Contact Us  |   Help

Greater Mekong Subregion

Home : Regions and Countries : Regional Cooperation : Regional Cooperation Initiatives : Greater Mekong Subregion : Publications : Proceedings of Ministerial, Forum, and Working Group Meetings : Appendix 4 -Revised Composition of Priority Telecommunications Projects for Phases One and Two

Table of Contents
p. 96 of 176 BACK | NEXT
Thirteenth Ministerial Conference on Subregional Economic Cooperation Program
Twelfth Ministerial Conference on Subregional Cooperation
Eleventh Ministerial Conference on Subregional Economic Cooperation
Ninth Ministerial Conference on Subregional Cooperation
Eighth Ministerial Conference on Subregional Cooperation
Sixth Meeting of the Subregional Transport Forum
Seventh Meeting of the Subregional Transport Forum
Fifth Meeting of the Subregional Transport Forum
Fourth Meeting of the Subregional Transport Forum
Eleventh Meeting of the Subregional Electric Power Forum
Tenth Meeting of the Subregional Electric Power Forum
Ninth Meeting of the Subregional Electric Power Forum
Eighth Meeting of the Subregional Electric Power Forum
Seventh Meeting of the Subregional Electric Power Forum
Sixth Meeting of the Subregional Electric Power Forum
Fifth Meeting of the Subregional Electric Power Forum
Fourth Meeting of the Regional Power Trade Coordination Committee
Second Meeting of the Regional Power Trade Coordination Committee
First Focal Group Meeting of Regional Power Trade Coordination Committee
Ninth Meeting of the Experts Group on Power Interconnection and Trade
Eighth Meeting of the Experts Group on Power Interconnection and Trade
Seventh Meeting of the Experts Group on Power Interconnection and Trade
Sixth Meeting of the Experts Group on Power Interconnection and Trade
Fifth Meeting of the Experts Group on Power Interconnection and Trade
Fourth Meeting of the Experts Group on Power Interconnection and Trade
Third Meeting of the Experts Group on Power Interconnection and Trade
Second Meeting of the Experts Group on Power Interconnection and Trade
Sixth Meeting of the Subregional Telecommunications Forum
Fifth Meeting of the Subregional Telecommunications Forum
Steering Committee Meeting for the Regional Technical Assistance on the Establishment of the Backbone Telecommunications Project for the Greater Mekong Subregion - Phase 1 (RETA 5915)
Fourth Meeting of the Subregional Telecommunications Forum
Appendix 1
Appendix 2
>> Appendix 3
Eleventh Meeting of the Working Group on Environment
Tenth Meeting of the Subregional Working Group on Environment
Ninth Meeting of the Working Group on Environment
Seventh Meeting of the Working Group on Environment
Sixth Meeting of the Working Group on Environment
Fifth Meeting of the Working Group on Environment
Fourth Meeting of the Working Group on Environment
Workshop on Drug Control Initiatives in the Greater Mekong Subregion
Sixth Meeting of the Working Group on Human Resource Development
Fourth Meeting of the Working Group on Human Resource Development
Third Meeting of the Working Group on Human Resource Development
Second Meeting of the Working Group on Human Resource Development
16th Meeting of the Working Group on the Greater Mekong Subregion Tourism Sector
15th Meeting of the Working Group on the Greater Mekong Subregion Tourism Sector
14th Meeting of the Working Group on the Greater Mekong Subregion Tourism Sector
Twelfth Meeting of the Subregional Working Group on Tourism
Eleventh Meeting of the Subregional Working Group on Tourism
Tenth Meeting of the Subregional Working Group on Tourism
Ninth Meeting of the Subregional Working Group on Tourism
Eighth Meeting of the Subregional Working Group on Tourism
Special Meeting of the Trade Facilitation Working Group
Fourth Meeting of the Trade Facilitation Working Group
Third Meeting of the Trade Facilitation Working Group
Second Meeting of the Trade Facilitation Working Group
Workshop on Customs Facilitation in the GMS
Inception Meeting of Trade Facilitation Working Group
Fourth Meeting of the Subregional Investment Working Group
Third Meeting of the Subregional Investment Working Group
Second Meeting of the Subregional Investment Working Group
GMS Mid-Term Review cum Senior Officials Meeting
Workshop on the Preinvestment Study for the Greater Mekong Subregion: East-West Economic Corridor
Quadripartite Meeting on the Chiang Rai-Kunming via Lao PDR Road Improvement Project

Revised Composition of Priority Telecommunications Projects for Phases One and Two

Summary of Two-Phased Projects

Phase I Project (2000-2003)

Phase II Project (2002-2005)

Two-Phased Projects by Country

Regrouping of Original Loop-based Projects (km)

Summary of Two-Phased Projects

  Phase I
Phase II
Total
New Transmission      
      Length (km) 1,855 4,128 5,983
      Cost ($m) 34.8 97.4 132.2
Upgrade and Improvements ($m) 8.5 5.8 14.4
TAs ($m) 12.1
4.4
16.5
Project Total      
      Length (km) 1,855 4,128 5,983
      Cost ($m) 55.5

107.6

163.1

Project Period 2000-2003 2002-2005 2000-2005

*Costs are indicative and expressed in 1998 prices.

 | up | Top

Phase I Project (2000-2003)

  Code
Project
Total Length (kms)
Cost ($m)1
Transmission Network        
   New Transmission TC10 Myanmar (Tachilek)-Thailand border 15 0.4
  TC9 Lao PDR (Luang Namtha)-Yunnan (Mengla) 120 3.0
  TC8 Thonnami (LAO)-Phnom Penh (CAM) 920 16.3
  TC13 Vientiane-Luang Prabang-Luang Namtha 420 9.6
  New Phnom Penh-Kampong Chaam-Siem Reap 380
5.6
Total
    1,855 34.8
   Upgrade & Improvements   Poipet-Phnom Penh-Phum Bavet (CAM)   0.8
    Hanoi-Da Nang-HCM City (VIE)   0.2
    Hanoi-Vinh, additional cable2   6.5
    Lao PDR   0.5
    Cambodia   0.6
Total
      8.5
   Total Transmission
   Network
      43.4
Technical Assistance        
   Implementation Issues   Tariff Options Study   1.0
    United Numbering Plan and Imp. Study   2.0
    Total   3.0
   Inst'l. Strengthening   Telecommunications Sector Policy Study   5.0
    Capacity Building (Human Resources)   1.0
    Accounting & Billing Training Needs Study   1.1
    Call Event Recording Study   2.0
    Total   9.1
   Total TA       12.1
Total Project Cost       55.5

1The costs are indicative and expressed in 1998 prices.
2If the capacity of existing lines is not sufficient.

 | up | Top

Phase II Project (2002-2005)

  Code
Project
Total Length (kms)
Cost ($m)1
Transmission Network        
    New Transmission TC4 MYA, Yangon-Moulmein-THA border 390 8.2
  TC5 MYA, Yangon-Meiktila-Keng Tung-THA border 1,320 30.3
  TC9 LAO (Luang Namtha)-THA border 203 5.1
  TC6 LAO (Pakse)-VIE (Da Nang) 450 11.4
  TC7 LAO (Savannakhet)-VIE (Dong Ha) 329 7.2
  TC10 MYA, Keng Tung-Yunnan, Jinghong 386 10.9
  TC11 VIE (Hanoi)-Yunnan (Hekou) 360 6.3
  TC12 MYA, Meiktila-Yunnan, Ruili 690
17.9
Total     4,128 97.4
   Upgrade & Improvements       5.8
   Total Transmission
   Network
      103.2
Technical Assistance        
   Implementation Issues   Telecommunications Management Network Study   1.3
    Subregional Network Synchronization and Implementation Study   1.2
    CCS No. 7 Signalling System and Implementation   2.0
   Total TA       4.4
Total Project Cost       107.6

1Costs are indicative and expressed in 1998 prices.

 | up | Top

Two-Phased Projects by Country

  Cambodia
Lao PDR
Thailand
Viet Nam
Yunnan PRC
Myanmar
Total
Phase I:              
   New Transmission Lines              
       Distance (km) 930 850 - - 60 15 1,855
       Amount ($m) 15.2 17.8 - - 1.4 0.4 34.8
   Upgrade & Improvement 1.4 0.5 - 6.6 - - 8.5
   Technical Assistance  
 
 
 
 
 
12.1
   Total ($m) 16.6
18.3
-
6.6
1.4
0.4
55.5
Phase II:              
   New Transmission Lines              
       Distance (km) - 698 - 634 178 2,618 4,128
       Amount ($m) - 16.4 - 13.3 5.2 62.4 97.4
   Upgrade & Improvement - 1.0 - 0.8 0.3 3.7 5.8
   Technical Assistance  
 
 
 
 
 
4.4
   Total ($m) -
17.4
-
14.1
5.5
66.1
107.6
Total              
   New Transmission Lines              
       Distance (km) 930 1,548 - 634 238 2,633 5,983
       Amount ($m) 15.2 34.3 - 13.3 6.7 62.8 132.2
   Upgrade & Improvement 1.4 1.5 - 7.4 0.3 3.7 14.4
   Technical Assistance  
 
 
 
 
 
16.5
   Total ($m) 16.6

35.8

-

20.7

7.0

66.5

163.1

*Costs are indicative and expressed in 1998 prices.

 | up | Top

Regrouping of Original Loop-based Projects (km)

  Code
Sector Study
(1)
Financing Secured
(2)
Financing Required
(3)=(1)-(2)
Phase I
(4)
Phase II
(5)=(3)-(4)
East Loop TC1 515 515 -    
  TC2 240 240 -    
  TC3 628
628
-
 
 
    1,383 1,383 - - -
West Loop TC4 630 220 410   390
  TC5 1,380
60
1,320
 
1,320
    2,010 280 1,730 - 1,710
North Loop TC9 460 147 313 120 203
  TC11 348
 
348
 
360
    808 147 661 120 563
Improved Connectivity TC6 490 40 450   450
  TC7 569 240 329   329
  TC8 1,150   920 920 -
  TC10 401   401 15 386
  TC12 690   690   690
  TC13 420
 
420
420
-
    3,720
280
3,210
1,355
1,855
New Transmission Total   7,921

2,090

5,601

1,855

4,128