Summary of Two-Phased Projects
Phase I Project (2000-2003)
Phase II Project (2002-2005)
Two-Phased Projects by Country
Regrouping of Original Loop-based Projects (km)
Summary of Two-Phased Projects
| |
Phase I
|
Phase II
|
Total
|
| New Transmission |
|
|
|
| Length (km) |
1,855 |
4,128 |
5,983 |
| Cost ($m) |
34.8 |
97.4 |
132.2 |
| Upgrade and Improvements ($m) |
8.5 |
5.8 |
14.4 |
| TAs ($m) |
12.1
|
4.4
|
16.5
|
| Project Total |
|
|
|
| Length (km) |
1,855 |
4,128 |
5,983 |
| Cost ($m) |
55.5
|
107.6
|
163.1
|
| Project Period |
2000-2003 |
2002-2005 |
2000-2005 |
*Costs are indicative and expressed in 1998 prices.
Top
Phase I Project (2000-2003)
| |
Code
|
Project
|
Total Length (kms)
|
Cost ($m)1
|
| Transmission Network |
|
|
|
|
| New Transmission |
TC10 |
Myanmar (Tachilek)-Thailand border |
15 |
0.4 |
| |
TC9 |
Lao PDR (Luang Namtha)-Yunnan (Mengla) |
120 |
3.0 |
| |
TC8 |
Thonnami (LAO)-Phnom Penh (CAM) |
920 |
16.3 |
| |
TC13 |
Vientiane-Luang Prabang-Luang Namtha |
420 |
9.6 |
| |
New |
Phnom Penh-Kampong Chaam-Siem Reap |
380
|
5.6
|
| Total |
|
|
1,855 |
34.8 |
| Upgrade & Improvements |
|
Poipet-Phnom Penh-Phum Bavet (CAM) |
|
0.8 |
| |
|
Hanoi-Da Nang-HCM City (VIE) |
|
0.2 |
| |
|
Hanoi-Vinh, additional cable2 |
|
6.5 |
| |
|
Lao PDR |
|
0.5 |
| |
|
Cambodia |
|
0.6
|
| Total |
|
|
|
8.5
|
Total Transmission Network |
|
|
|
43.4
|
| Technical Assistance |
|
|
|
|
| Implementation Issues |
|
Tariff Options Study |
|
1.0 |
| |
|
United Numbering Plan and Imp. Study |
|
2.0
|
| |
|
Total |
|
3.0 |
| Inst'l. Strengthening |
|
Telecommunications Sector Policy Study |
|
5.0 |
| |
|
Capacity Building (Human Resources) |
|
1.0 |
| |
|
Accounting & Billing Training Needs Study |
|
1.1 |
| |
|
Call Event Recording Study |
|
2.0
|
| |
|
Total |
|
9.1
|
| Total TA |
|
|
|
12.1
|
| Total Project Cost |
|
|
|
55.5
|
1The costs are indicative and expressed in 1998 prices.
2If the capacity of existing lines is not sufficient.
Top
Phase II Project (2002-2005)
| |
Code
|
Project
|
Total Length (kms)
|
Cost ($m)1
|
| Transmission Network |
|
|
|
|
| New Transmission |
TC4 |
MYA, Yangon-Moulmein-THA border |
390 |
8.2 |
| |
TC5 |
MYA, Yangon-Meiktila-Keng Tung-THA border |
1,320 |
30.3 |
| |
TC9 |
LAO (Luang Namtha)-THA border |
203 |
5.1 |
| |
TC6 |
LAO (Pakse)-VIE (Da Nang) |
450 |
11.4 |
| |
TC7 |
LAO (Savannakhet)-VIE (Dong Ha) |
329 |
7.2 |
| |
TC10 |
MYA, Keng Tung-Yunnan, Jinghong |
386 |
10.9 |
| |
TC11 |
VIE (Hanoi)-Yunnan (Hekou) |
360 |
6.3 |
| |
TC12 |
MYA, Meiktila-Yunnan, Ruili |
690
|
17.9
|
| Total |
|
|
4,128 |
97.4 |
| Upgrade & Improvements |
|
|
|
5.8
|
Total Transmission Network |
|
|
|
103.2
|
| Technical Assistance |
|
|
|
|
| Implementation Issues |
|
Telecommunications Management Network Study |
|
1.3 |
| |
|
Subregional Network Synchronization and Implementation Study |
|
1.2 |
| |
|
CCS No. 7 Signalling System and Implementation |
|
2.0
|
| Total TA |
|
|
|
4.4
|
| Total Project Cost |
|
|
|
107.6
|
1Costs are indicative and expressed in 1998 prices.
Top
Two-Phased Projects by Country
| |
Cambodia
|
Lao PDR
|
Thailand
|
Viet Nam
|
Yunnan PRC
|
Myanmar
|
Total
|
| Phase I: |
|
|
|
|
|
|
|
| New Transmission Lines |
|
|
|
|
|
|
|
| Distance (km) |
930 |
850 |
- |
- |
60 |
15 |
1,855 |
| Amount ($m) |
15.2 |
17.8 |
- |
- |
1.4 |
0.4 |
34.8 |
| Upgrade & Improvement |
1.4 |
0.5 |
- |
6.6 |
- |
- |
8.5 |
| Technical Assistance |
|
|
|
|
|
|
12.1
|
| Total ($m) |
16.6
|
18.3
|
-
|
6.6
|
1.4
|
0.4
|
55.5
|
| Phase II: |
|
|
|
|
|
|
|
| New Transmission Lines |
|
|
|
|
|
|
|
| Distance (km) |
- |
698 |
- |
634 |
178 |
2,618 |
4,128 |
| Amount ($m) |
- |
16.4 |
- |
13.3 |
5.2 |
62.4 |
97.4 |
| Upgrade & Improvement |
- |
1.0 |
- |
0.8 |
0.3 |
3.7 |
5.8 |
| Technical Assistance |
|
|
|
|
|
|
4.4
|
| Total ($m) |
-
|
17.4
|
-
|
14.1
|
5.5
|
66.1
|
107.6
|
| Total |
|
|
|
|
|
|
|
| New Transmission Lines |
|
|
|
|
|
|
|
| Distance (km) |
930 |
1,548 |
- |
634 |
238 |
2,633 |
5,983 |
| Amount ($m) |
15.2 |
34.3 |
- |
13.3 |
6.7 |
62.8 |
132.2 |
| Upgrade & Improvement |
1.4 |
1.5 |
- |
7.4 |
0.3 |
3.7 |
14.4 |
| Technical Assistance |
|
|
|
|
|
|
16.5
|
| Total ($m) |
16.6
|
35.8
|
-
|
20.7
|
7.0
|
66.5
|
163.1
|
*Costs are indicative and expressed in 1998 prices.
Top
Regrouping of Original Loop-based Projects (km)
| |
Code
|
Sector Study (1)
|
Financing Secured (2)
|
Financing Required (3)=(1)-(2)
|
Phase I (4)
|
Phase II (5)=(3)-(4)
|
| East Loop |
TC1 |
515 |
515 |
- |
|
|
| |
TC2 |
240 |
240 |
- |
|
|
| |
TC3 |
628
|
628
|
-
|
|
|
| |
|
1,383 |
1,383 |
- |
- |
- |
| West Loop |
TC4 |
630 |
220 |
410 |
|
390 |
| |
TC5 |
1,380
|
60
|
1,320
|
|
1,320
|
| |
|
2,010 |
280 |
1,730 |
- |
1,710 |
| North Loop |
TC9 |
460 |
147 |
313 |
120 |
203 |
| |
TC11 |
348
|
|
348
|
|
360
|
| |
|
808 |
147 |
661 |
120 |
563 |
| Improved Connectivity |
TC6 |
490 |
40 |
450 |
|
450 |
| |
TC7 |
569 |
240 |
329 |
|
329 |
| |
TC8 |
1,150 |
|
920 |
920 |
- |
| |
TC10 |
401 |
|
401 |
15 |
386 |
| |
TC12 |
690 |
|
690 |
|
690 |
| |
TC13 |
420
|
|
420
|
420
|
-
|
| |
|
3,720
|
280
|
3,210
|
1,355
|
1,855
|
| New Transmission Total |
|
7,921
|
2,090
|
5,601
|
1,855
|
4,128
|