Publications

Home : Publications : Online Publications : Document


Table of Contents
p. 6 of 68 BACK | NEXT
Foreword
1. Introduction
2. ADB Policies and Procedures
2.1 Project Administration Instructions
2.2 Project Administration Manual
>> 2.3 Guidelines for Preparing a Design and Monitoring Framework
2.4 Procurement Guidelines
2.5 Consulting Services Guidelines
2.6 Loan Disbursement Handbook
2.7 Loan Financial Information System
2.8 Financial Management
2.9 Operations Manual
2.10 Policy on Gender and Development
2.11 Environment (Safeguard Policy Statement)
2.12 Indigenous Peoples (Safeguard Policy Statement)
2.13 Involuntary Resettlement (Safeguard Policy Statement)
2.14 Handbook on Social Analysis
2.15 Anticorruption Policy
2.16 Public Communication Policy
3. Project Stages
4. Project Scheduling and Resource Planning
5. Project Implementation
6. Project Manager
7. ADB and EA/IA Interaction
8. ADB Performance Review and Monitoring
9. Tutorials and Templates
10. Reference Material
Appendixes
FAQ
e-Handbook on Project Implementation : 2. ADB Policies and Procedures

2.3 Guidelines for Preparing a Design and Monitoring Framework

The ADB's Guidelines for Preparing a Design and Monitoring Framework (DMF) provide a step-by-step description of the participatory process for developing a results framework that strengthens country ownership of projects and enhances the likelihood of achieving the desired outcomes. The Project Performance Management System (PPMS) outlines a systematic way of designing and implementing projects. The design and monitoring framework, the key element of the PPMS, is a results-based tool for analyzing, conceptualizing, designing, implementing, monitoring, and evaluating projects. It structures the project planning process and helps communicate essential information about the project to stakeholders in an efficient, easy-to-read format.


Guidelines for Preparing a Design and Monitoring Framework

Contents

  1. Introduction
  2. Design and Monitoring Framework Approach
  3. Design and Monitoring Framework