Asian Development Bank - Fighting Poverty in Asia and the Pacific
What's New  |   e-Notification  |   Sitemap  |   Contact Us  |   Help

Catalog

Home : Publications : Catalog : Online Publications : Document

Table of Contents
p. 63 of 68 BACK | NEXT
Foreword
1. Introduction
2. ADB Policies and Procedures
3. Project Stages
4. Project Scheduling and Resource Planning
5. Project Implementation
6. Project Manager
7. ADB and EA/IA Interaction
8. ADB Performance Review and Monitoring
9. Tutorials and Templates
9.1 Tutorial
- 9.1.1 Installing OpenProj
- 9.1.2 The Critical Path Method (CPM) on OpenProj
- 9.1.3 Entering Tasks and Task Durations
- 9.1.4 Creating Dependencies
- 9.1.5 Viewing the Critical Path on the Gantt Chart
>> - 9.1.6 The Sample Project Implementation File
- 9.1.7 Reviewing the Project Plan
9.2 Templates
10. Reference Material
Appendixes
FAQ
e-Handbook on Project Implementation : 9. Tutorials and Templates

9.1 Software Tool Kit for a Tutorial

9.1.6 Sample Project Implementation Template

The Sample Project Implementation file is provided as a template to use as an exercise for the stages of project implementation as described in section 5 of this e-Handbook. Understanding these stages and tasks is required for implementing the first fours steps of the Critical Path Method (CPM) described in subsection 4.2 and in the CPM tutorial.

Two versions are provided for download, depending on which software you want to use. For this tutorial, download the OpenProj version of the file. Note: Other template files are also available for download.

  1. Microsoft Project Version
  2. OpenProj Version

Download the Sample Project Implementation File through the following links:

  1. Microsoft Project version—download file
  2. OpenProj Version—download file

Once you have downloaded the Sample Project Implementation file, tailor it to your specific project by doing the following steps.

  1. Open the "Sample Project Implementation" file under OpenProj.
  2. Click on "Project->Edit properties" from the top menu bar.
  3. Enter the project name.
  4. Change the start date.
  5. Click on "File->Save as" from the top menu bar and provide an appropriate name for this project plan.