|
Aftermath of the 8 October Earthquake in Muzaffarabad, Pakistan

Up to US$3.5 billion may be needed to rebuild schools, health facilities and other vital public infrastructure.
These photos are downloadable and have been optimized for the screen/web. Right click each image and select "Save Picture As" to download/save these images. Any use should include copyright to the Asian Development Bank.
|