Grant Fact-Finding Mission Undertaken/Scheduled: 11-29 Sep 2000
|
|
Grant Approval Date
28 August 2001
|
Estimated Completion Date
|
- Cost and Financing Plan (in US$)
-
| Source |
Amount |
|
DEN |
300,000.00 |
| Total |
300,000.00 |
|
- Description
-
Structural engineering measures alone cannot completely overcome floods: no matter how high the design standards are, there is always the possibility of higher floods exceeding the standard. Flood forecasting and early warning is the most effective non-structural measure to reduce the loss of life and property in vulnerable areas, especially in the inner floodplains.
The present data collection and processing system of Yellow River Conservancy Commission (YRCC) is advanced. A combination of technologies and modelling tools are used to forecast rainfall and other hydrometeorological factors. Mathematical models used by YRCC for planning purposes are not adapted to real time flood forecasting using an updating procedure, which is an essential element of a model based forecasting system.
A well proven modelling system is required to make reliable forecasts of flows and flood levels along the Lower Yellow River and its floodplain. In order to make the warnings effective for wide dissemination, the forecasts have to be translated to readily understandable forms, and related to the population and infrastructure by linking the model output to Geographic Information System (GIS).
|
|
-
-
|
-
-
|
- Thematic Classification
-
|
-
-
|
- Objectives and Scope
-
The Government of Denmark will finance a part of the engineering study who will assist Yellow River Conservancy Commission in the areas of flood forecasting and early warning system in the lower reaches of the Yellow River.
- Policy Dialogue
-
- Environment Category:
To be determined.
- Environment Impact and Mitigation
-
- Social Aspects and Remedies
-
- Benefits and Beneficiaries
-
- Beneficiary Participation in Formulation
-
- Beneficiary Participation in Implementation
-
- Consulting Services
-
10 person-months of an international consulting services. To be recruited folowing ADB guidelines.
- Procurement
-
- Contacts
- Bank
|
Yoshiaki Kobayashi
|
|
Water Resources Management Specialist
|
|
EAAE
|
|
Tel. No.:
|
(632) 632-6255
|
|
E-mail:
|
yoshikobayashi@adb.org
|
- Executing Agency
- Ministry of Water Resources
|
Contact Person
|
:
|
Zhang Ximing, Deputy Division Chief
|
|
Tel. No.
|
:
|
(86-10) 63202704
|
|
Fax. No.
|
:
|
(86-10) 63548037
|
|
E-mail
|
:
|
xmchang@MWR.gov.cn
|
|
Contact Person
|
:
|
|
|
Tel. No.
|
:
|
|
|
Fax. No.
|
:
|
|
|
E-mail
|
:
|
|
- Remarks
-
|