GMS Northern Power Transmission
Missions
TA Approval Date
Estimated Completion Date
Cost and Financing Plan
Description
Development Objectives
Thematic Classification
Target Classification
Objectives and Scope
Policy Dialogue
Environment Category
Env't Impact and Mitigation
Social Aspects and Remedies
Benefits and Beneficiaries
Beneficiary Participation in Formulation
Beneficiary Participation in Implementation
Consulting Services
Procurement
Contacts
Remarks
Location
Sector
Energy /Transmission & Distribution
Initial Listing
5 April 2006
Most Recent Update
17 July 2007
Executing Agency(ies)
  • Electricite du Laos

  • TA Fact-Finding Mission Undertaken/Scheduled: 23-31 Mar 2006
     
    TA Approval Date
    19 July 2006
    Estimated Completion Date
    Cost and Financing Plan (in US$)

    Source Amount
    JSF 800,000.00
    Total 800,000.00

    Description
    The project aims to support GMS members’ strategies for promoting regional power exchange and to electrify northern rural Lao PDR. The Project identifies 115 kV transmission lines extending across the northern provinces of Bokeo, Luangnamtha, Phongsaly, Oudomxay, Xayaburi, and Vientiane. The Project also includes five new substations (115kV/22kV), and medium- and low-voltage distribution facilities for rural electrification. The Project also upgrades the interconnection to Thailand from 22 kV to 115 kV transmission lines.
    Thematic Classification
    Economic Growth
    Target Classification
    General Intervention
    Objectives and Scope
    The PPTA activities will identify a project suitable for funding under an ADB loan. The PPTA scope will cover 115 kV transmission lines(731 km) in northern Lao PDR, comprising: (i) Houayxay(Lao-Thai border)- Luangnamtha(146 km), Namo – Boun Neua(96km); (ii) Kenthao (Lao-Thai border) - Paklay – Hongsa(219 km), Nonhai – Paklay(104 km); and (iii) Hongsa – Nam Beng – Houayxay(136 km)), five substations (Houayxay, Boun Neua, Namo, Hongsa, and Paklay), and erection of medium- (22kV) and low-voltage (400 V) distribution facilities. Activities will include (i) reviewing all studies relating to the power system development in the Lao PDR and Thailand; (ii) assessing electricity demand in northern Lao PDR; (iii) conducting the optimal power system expansion simulation, applying least-cost methods; (iv) carrying out engineering line surveys and undertaking load flow studies in Lao PDR and Thailand, (v) preparing preliminary design and technical specifications; (vi) conducting economic and financial analysis under ADB policies and guidelines; (vii) reviewing and updating of EdL’s financial management capacity; and (viii) ensuring safeguard compliance with relevant ADB environment, involuntary resettlement, and indigenous peoples policies and guidelines.

    Policy Dialogue

    Environment Category: B

    Environment Impact and Mitigation

    Social Aspects and Remedies

    Benefits and Beneficiaries

    Beneficiary Participation in Formulation

    Beneficiary Participation in Implementation

    Consulting Services
    The TA will require about 46 person-months of consulting services, including about 16 person-months of international and 30 person-months of national consulting services. The team will be composed of (i) Team Leader and Power System, Transmission, Distribution Line and Substation Engineers (3.5 person- months, Team leader, international; 3.0 person-months, Transmission, Substation, Distribution and Power System Engineer, international; 2.0 person-months, Power System Engineer, national; total 6.0 person-months, Two Transmission line and Substations, nationals; total 6.0 person-months, two distribution line engineers, national), (ii) Project Economists ( 2.5 person-months, international; 2.0 person-months, national), (iii) Financial Analyst ( 2.5 person-months, international; 2.0 person-month, national), (iv) Environmental Assessment Specialist ( 2.0 person-months, international; total 6.0 person-months, Two environmental assessment specialist, national) and (v) Resettlement and Ethnic Minority Specialists (2.5 person-months, international; total 6.0 person-months, two resettlement and ethnic minority specilaists, national).

    Procurement
    No civil works required.

    Contacts
    Bank
    Takaaki Kawano
    Energy Economist
    SEID
    Tel. No.: (632) 632-6494
    E-mail: tkawano@adb.org

    Executing Agency
    Electricite du Laos
    Contact Person : Mr. Sisavath Thiravong, Deputy General Manager
    Tel. No. : (856-21) 451 519
    Fax. No. : (856-21) 415 039
    E-mail :
    Contact Person : Mr. Kham Mingboupha, Manager
    Tel. No. : (856-21) 451 519
    Fax. No. : (856-21) 415 039
    E-mail :
    Remarks

    © 2008 Asian Development Bank

    Privacy | Terms of Use
     Top of page