Special Evaluation Study on Project Cost Estimates
ADB conducted a study to
- determine the major causes of cost underruns and overruns of ADB projects
- assess the contribution of each major factor to cost variations, particularly non-robust project cost estimations at loan appraisal
- recommend ways to improve the reliability of cost estimates, and to streamline guidelines to address and share the risk of unpredictable changes in project costs.
|
Executive Summary
- Introduction
- Objectives and Scope
- Study Objectives
- Scope
- Approach
- Limitations of the Study
- Literature Review
- Dam Projects
- Power Projects
- Health Projects
- Mineral Resource Projects
- Major Findings
- Study of Historical Data on Projects Cost Overruns and Underruns
- Study of 220 Projects Completed Between 1996 and 2002
- Survey of ADB Staff and Consultants
- Country-Level Reports and Case Studies
- Comparison with 2002 People's Republic of China Study Findings
- Study of Cost Underrun Impacts on Loan Cancellations
- Conclusion and Recommendations
- Summary Findings
- Conclusions
- Recommendations
Appendixes
- Analysis of Completed Projects with PCRs
- Analysis of a Sample of 30 PCRs Issued in 1980 and 1981
- Analysis of 220 PCRs Issued After 1998
- Analysis on Cost Escalation Factors, Exchange Rates, and Inflation
- Correlations Between Cost Variations and Some Project Characteristics
- Analysis of Cancellations of ADB Loans
Management Response
DEC Chair Summary
|
|