Asian Development Bank - Fighting Poverty in Asia and the Pacific
What's New  |   e-Notification  |   Sitemap  |   Contact Us  |   Help

Catalog

Home : Publications : Catalog : Online Publications : Document

Cumulative Impact Analysis and Nam Theun 2 Contributions

View Document 

The Nam Theun 2 (NT2) Hydropower Project is the largest infrastructure development project in Lao People’s Democratic Republic (PDR). As a result of the potential impacts the project may have on the development of the area, international funding institutions have requested a Cumulative Impact Assessment (CIA) in order to analyse the combined impacts of a number of projects, either implemented together or in a sequence and of future developments and plans, in relation to NT2. The CIA includes:

  • Effects other (future) developments in the area have on the type and magnitude of the NT2 impacts. (Added impacts)
  • Impacts of development in other sectors that are induced by NT2 activities and its supplementary components. (Induced impacts)
See also: Khmer Translation
PDF View the entire document
[ PDF: 1,103kb | 142 pages ].
To read, you need Acrobat.
Get Acrobat

Contents

Executive Summary [ PDF: 57kb | 10 pages ]

Table of Contents, Abbreviations, Acknowledgements [ PDF: 37kb | 8 pages ]

  1. Background and Progress [ PDF: 57kb | 3 pages ]
  2. Analytic Process [ PDF: 16kb | 3 pages ]
  3. Administrative and Legal Framework [ PDF: 23kb | 5 pages ]
  4. Nam Theun 2 Hydropower Project and its Predicted Impacts [ PDF: 85kb | 7 pages ]
  5. Assumed Sector Developments [ PDF: 394kb | 39 pages ]
  6. Impact Zones [ PDF: 54kb | 3 pages ]
  7. Predictions of Cumulative Impacts [ PDF: 347kb | 57 pages ]
  8. Recommendations for Management Interventions [ PDF: 13kb | 2 pages ]
  9. References/Bibliography [ PDF: 15kb | 3 pages ]

Annexes

Annex I: Sector Plans and Development Trends

Table of Contents [ PDF: 271kb | 4 pages ]

  1. Introduction [ PDF: 320kb | 1 page ]
  2. Hydropower [ PDF: 361kb | 7 pages ]
  3. Transport [ PDF: 159kb | 5 pages ]
  4. Water Supply and Sanitation [ PDF: 130kb | 2 pages ]
  5. Urbanisation [ PDF: 269kb | 7 pages ]
  6. Forestry [ PDF: 213kb | 5 pages ]
  7. Industry [ PDF: 172kb | 4 pages ]
  8. Mining [ PDF: 135kb | 5 pages ]
  9. Conservation [ PDF: 196kb | 3 pages ]
  10. Poverty and Economic Development [ PDF: 136kb | 3 pages ]
  11. Education [ PDF: 138kb | 2 pages ]
  12. References [ PDF: 112kb | 2 pages ]

Annex II: Hydrology Report

Table of Contents [ PDF: 323kb | 4 pages ]

  1. Introduction [ PDF: 349kb | 1 page ]
  2. Hydrological Reference Series [ PDF: 198kb | 4 pages ]
  3. Water Balance Modelling [ PDF: 533kb | 5 pages ]
  4. Hydraulic Modelling
  5. 4.1 General Set-up [ PDF: 449kb | 1 page ]
    4.2 Input-Modelling [ PDF: 90kb | 1 page ]
    4.3 Calibration [ PDF: 435kb | 3 pages ]
    4.4 Baseline Simulations [ PDF: 619kb | 3 pages ]
    4.5 Scenario Simulations [ PDF: 421kb | 10 pages ]

  6. References [ PDF: 92kb | 1 page ]

Annex III: Hydropower Development

Table of Contents [ PDF: 315kb | 1 page ]

  1. Introduction [ PDF: 282kb | 2 pages ]
  2. Assumptions [ PDF: 131kb | 4 pages ]
  3. Reservoir and Hydropower Data [ PDF: 193kb | 7 pages ]
  4. Flooding [ PDF: 103kb | 2 pages ]

Annex IV: Fish Biodiversity and Fisheries [ PDF: 258kb | 16 pages ]

  1. Introduction
  2. Mekong Fish Biodiversity and Ecology
  3. Potential Impacts of Hydropower
  4. Fisheries
  5. NT2 Nakai Highland Reservoir
  6. Xe Bang Fai
  7. Nam Kading and Nam Hinboun
  8. Great Lake
  9. MRC Strategy for Fisheries Management
  10. Fish Passes and Fish Migrations in the Mekong Basin

Annex V: Rural Landuse with Emphasis on Irrigated Agriculture

Table of Contents [ PDF: 246kb | 3 pages ]

  1. Part 1: Geography & Landuse Mechanisms
  2. 1.1 Introduction [ PDF: 312kb | 2 pages ]
    1.2 Zonation of the Mekong Drainage Basin [ PDF: 258kb | 6 pages ]
    1.3 Rural Landuse and Livelihood Regimes [ PDF: 220kb | 8 pages ]
    1.4 Impacts of Landuse on Basin Hydrology [ PDF: 188kb | 5 pages ]
    1.5 Hydrologic Pathways [ PDF: 185kb | 3 pages ]
    1.6 Irrigation [ PDF: 1,047kb | 16 pages ]

  3. Part 2: Present Status of Landuse & Short-term
  4. 2.1 Introduction [ PDF: 135kb | 2 pages ]
    2.2 Basin-wide Perspectives [ PDF: 161kb | 4 pages ]
    2.3 Lao PDR Perspective [ PDF: 136kb | 2 pages ]
    2.4 Local Perspective - NT2-HPP Proximal Impact Zones [ PDF: 377kb | 23 pages ]

  5. Part 3: Recommendations
  6. 3.1 Policy & Legal Framework [ PDF: 134kb | 2 pages ]
    3.2 Institutional Strengthening and Capacity [ PDF: 110kb | 4 pages ]
    3.3 Technical Aspects and Best Practices Leading to Sustainable Rural Landuse Intensification [ PDF: 431kb | 6 pages ]

  7. Part 4: Predicted Landuse Scenarios
  8. 4.1 Basin-wide Perspective [ PDF: 156kb | 4 pages ]
    4.2 Lao PDR Perspective [ PDF: 134kb | 2 pages ]
    4.3 Local Perspective - NT2-HPP Proximal Impact Zones [ PDF: 108kb | 2 pages ]

Annex VI: Health and Population Growth

Table of Contents [ PDF: 198kb | 3 pages ]

  1. Introduction [ PDF: 225kb | 1 page ]
  2. The Current Health Situation [ PDF: 320kb | 6 pages ]
  3. Existing Health Services in the Project Intervention Area [ PDF: 538kb | 1 page ]
  4. External Economic Development Scenarios in the Khammuane Region [ PDF: 141kb | 4 pages ]
  5. Migration and Urbanization in the Savannakhet-Khammuane Region [ PDF: 318kb | 21 pages ]
  6. Prediction of the Cumulative Impact [ PDF: 457kb | 1 page ]
  7. Summary of "Business as Usual" and "Best Practice" Scenarios [ PDF: 283kb | 23 pages ]
  8. Conclusion [ PDF: 145kb | 3 pages ]

Annex VII: Drugs and Human Trafficking

Table of Contents [ PDF: 417kb | 2 pages ]

  1. Drug Abuse and Trafficking [ PDF: 173kb | 8 pages ]
  2. 1.1 Regional Perspective
    1.2 National Perspective
    1.3 Local Perspective
    1.4 Recommendations

  3. Migration and Human Trafficking [ PDF: 320kb | 12 pages ]
  4. 2.1 Introduction
    2.2 Regional Perspective
    2.3 National Perspective
    2.4 Local Perspective
    2.5 Future Developments
    2.6 Recommendations

References [ PDF: 92kb | 1 page ]

Annex VIII: Ethnic Minorities

Table of Contents [ PDF: 275kb | 3 pages ]

  1. Ethnic Minorities Status [ PDF: 476kb | 8 pages ]
  2. Ethnic Minorities in NT2 Project and Adjacent Areas [ PDF: 623kb | 7 pages ]
  3. Integration and Assimilation Trends [ PDF: 194kb | 10 pages ]
  4. Conclusions and Recommendations [ PDF: 143kb | 7 pages ]

References [ PDF: 104kb | 2 pages ]

Appendixes [ PDF: 18kb | 2 pages ]


© 2009 Asian Development Bank

Privacy | Terms of Use
 Top of page