Home
Regions and Countries
Regional Cooperation
Regional Cooperation Initiatives
Greater Mekong Subregion
Cross-Border Transport Agreement
Main Agreement
Part VII: Infrastructure
|
Part VII: InfrastructureArticle 25: Road and Bridge Design Standards
Article 26: Road Signs and Signals The Contracting Parties undertake to gradually bring the traffic signs and signals on their territory in line with the standards set in Annex 7. Article 27: Border Crossing Facilities The Contracting Parties undertake to build or upgrade the required infrastructure at the border crossing points and to staff them so as to assure speedy and efficient completion of frontier crossing formalities as specified in Annex 12.
|
||||||||||||||||||||||||||||