| Sector | Project | Participating Countries | Estimated Cost in US$ Million | Financing in US$ Million | Status | Implementation Schedule | Flagship | Contact Information |
| Agriculture | AGR027: Technology Transfer in Field Crops (maize, soy bean, and castor bean) Production Improvement PROFILE
The project focuses on the improvement of production with emphasis on usage of quality seed. The project also addresses the need to improve service delivery systems as well as the establishment of farmers' cooperatives.
Proposed as a bilateral project between Cambodia and Thailand as part of ACMECS Initiative | Cambodia, Thailand | 0.43 | NA | Proposed | Short-term, 2003-2004 (to be confirmed) | Southern Economic Corridor | Mr. Srun Sokhom, Deputy Director, Department of Agronomy and Agricultural Land Improvement (DAALI), Cambodia
|
| Agriculture | AGR028: Study for Identification of Suitable Sites for Eucalyptus Farming PROFILE
The project aims to develop a study to identify suitable sites for eucalyptus farming. Returns to investment from eucalyptus has been proven in many cases to be higher than a number of commercial upland crops as well as fast growing trees. Nonetheless, there have been many controversies around this crop. Some of the reservations over the external effects from eucalyptus that may result in negative impact on the immediate environment of the plantation should be taken into consideration in so far as these contribute to the development of better or improved management practices . Eucalyptus production is advocated only in forest areas already converted for alternative uses, particularly areas converted for agricultural purposes.
Proposed as a bilateral project between Cambodia and Thailand as part of ACMECS Initiative | Cambodia, Thailand | 0.12 | NA | Proposed | 2002-2005 (to be confirmed) | Southern Economic Corridor | Royal Forestry Department, Ministry of Agriculture and Cooperatives, Cambodia |
| Agriculture | AGR029: Feasibility Study of Contract Farming of Tropical Fruits PROFILE
The project aims to develop a national fruit tree network and strategic management for sustainable production, processing supplies and marketing, including better management of input supplies, and technology transfer thereby resulting in assured market outlet for the producers and stable source of supplies for the processing plants.
Proposed as a bilateral project between Cambodia and Thailand as part of ACMECS Initiative | Cambodia, Thailand | 0.48 | NA | Proposed | 2004-2005 (to be confirmed) | Southern Economic Corridor | Mr. Srun Sokhom, Deputy Director, Department of Agronomy and Agricultural Land Improvement (DAALI), Cambodia.
|
| Agriculture | AGR030: Post Harvest in Fisheries of Catch and Culture PROFILE
The project aims to provide training courses and study tours for farmers to learn methodology on post harvest of catch and culture. Budget will be allocated for training arrangement within one month (four trainees on inland aquaculture and four trainees on fish processing training). It is proposed that Thailand would share experience and provide in house training on Post harvest technology and practice. Specific areas are to be defined for some pilot study and projects.
Proposed as a bilateral project between Cambodia and Thailand as part of ACMECS Initiative | Cambodia, Thailand | 0.02 | NA | Proposed | 2004 (to be confirmed) | Southern Economic Corridor | Mr. Sam Nuov, Ministry of Agriculture, Forestry and Fishery, Cambodia |
| Agriculture | AGR031: In-house Training in Sanitary and Phytosanitary Measures PROFILE
The project aims to provide (i) training courses on sanitary and phyto-sanitary measures; (ii) training courses in meat processing, handling, hygiene, HACCP and necessary procedures required for export; (iii) study visits and exchange learning experiences at appropriate field sites on slaughterhouse and meat processing for stakeholders in Thailand.
Proposed as a bilateral project between Cambodia and Thailand as part of ACMECS Initiative | Cambodia, Thailand | 0.21 | NA | Proposed | Short term 2004-2005 (to be confirmed) | Southern Economic Corridor | Mr. Kao Phal, Ministry of Agriculture, Forestry and Fishery, Cambodia
|
| Agriculture | AGR032: Target area for agriculture cultivation at the border areas in Koh Kong, Pursat, Kampot, Battambang for joint investment in cash crops (soybean, sesame, maize, castor bean, potato) PROFILE
The project will focus on the improvement of production with emphasis on usage of qualified seeds and also address the need to improve service delivery systems. Apart from increasing supplies to meet demands for food crops consumption in Cambodia, there is also the medium and long-term expectation of surplus production of commercial crops for export to Thailand. It is proposed that Thailand share experiences and provide in house training for improvement of agricultural productivities in the selected provinces in Cambodia.
Proposed as a bilateral project between Cambodia and Thailand as part of ACMECS Initiative | Cambodia, Thailand | 0.7 | NA | Proposed | 2002-2005 (to be confirmed) | Southern Economic Corridor | Mr. Chuop Paris, Deputy Director, Department of Agro- Industry , Ministry of Agriculture, Forestry, and fisheries, Cambodia. Tel: (855)JI6 835 859, Fax: (855) 23213 145; Email: dai-maff-p@camnet.com.kh
Thailand: Ministry of Agriculture and Cooperatives |
| Agriculture | AGR033: Introducing and Applying Some Appropriate Technologies of Pre- and Post-Harvest Losses, Improve the Quality of Agricultural Commodities and Income of Farmers in Viet Nam, Lao PDR and Cambodia PROFILE
The project aims towards the (i) application of pre- and post-harvest technologies for different types of agro-products in selected areas to reduce post-harvest losses, enhance quality of raw material for export and increase agro-produce value and quality; (ii) dissemination of knowledge and increase in income for farmers in the areas covered; (iii) creation of conditions to enhance effects of other projects in post-harvest field; (iv) enhancing the quality of raw material for exported rice processing.
| Cambodia, Lao PDR, Viet Nam | 0.8 | NA | Proposed | 2005-2007 (to be confirmed) | Southern Economic Corridor | Mr. Nguyen Duy Duc, Acting Director, Southern Sub-Institute of Agricultural Engineering and Post-harvest Technology (SIAEP), Ministry of Agriculture and Rural Development, 54 Tran Khanh Du St., Dist. 1 Ho Chi Minh City ? Vietnam
Tel: (848) 8483947 / 84811 |
| Energy | ENE028: Cambodia -Viet Nam Power Interconnection
The project aims to construct a 115 kV transmission from Tay Ninh (VIE) to Kampong Cham/ Kratie (CAM) to allow Cambodia to import low-cost power from Viet Nam and electrify villages along route.
World Bank appraisal to follow release of FS results. | Cambodia, Viet Nam | 55 | 55 | Proposed | | Southern Economic Corridor | Mr. Yim Nolson, Elec. Du Cambodge Tel: 85512 808801; Email: yim.nolson@online.com.kh |
| Energy | ENE029: Construction Stung Meteuk I Hydropower Project PROFILE
The project aims to carry out the construction of the Stung Meteuk I HPP, considering the least-cost hydropower plant to meet the local and sub-regional electricity demand, and generation and transmission expansion plans. Project preparation includes conduct of field investigations, economic and financial analysis, socio environmental impacts assessment, public consultations and HRD. D36
Need to clarify which parties are involved in the envisioned public-private sector partnership. Proposed for inclusion in Initiative for ASEAN Integration (2005-2007) but currently excluded. | Cambodia, Thailand | 318.5 | NA | Proposed | 2005-2007 | Southern Economic Corridor | Mr. Yim Nolson, Elec. Du Cambodge Tel: 85512 808801; Email: yim.nolson@online.com.kh |
| Energy | ENE030: Ayuthaya -Sakeo-Poipet Gas Pipeline PROFILE
The project aims to develop a connecting network from Maptaphut to Saraburi via Ayuthaya passing through Nakhon Nayok, Prachinburi, Sakaeo and Poipet, covering approximate distance of 240 km.
Bilateral project between Cambodia and Thailand under the ACMECS Initiative. EGAT will be implementing agency. | Cambodia, Thailand | 56 | NA | Proposed | 2010-2020 | Southern Economic Corridor | Mr. Prutichai Chonglertvanichkul, EGAT Thailand Tel: 662-436-3500 |
| Energy | ENE031: Maptaphut Chantaburi - Koh Kong Gas Pipeline PROFILE
The project aims to link the networks of gas pipelines from Yanada to Ratchaburi, Bangkok, Map Ta Phut, Trat and Koh Kong, covering approximate distance of 290 km. In the longer term, it may also be feasible to extend the pipeline distribution further east to Vietnam and west to Myanmar.
Bilateral project between Cambodia and Thailand under the ACMECS Initiative. EGAT will be implementing agency. | Cambodia, Thailand | 65 | NA | Proposed | 2010-2021 | Southern Economic Corridor | Mr. Prutichai Chonglertvanichkul, EGAT Thailand Tel: 662-436-3500 |
| Energy | ENE032: Construction of 180MW Combined Cycle Power Plant in Sihanoukville PROFILE
The project aims to construct a 180 MW combined cycle gas power plant, the FS of which was completed by JICA in 2002. It will utilize gas drawn from Cambodia's offshore gas fields, and will feed power into transmission lines financed by ADB and KfW.
While gas could be landed in Sihanoukville in 2007, Government projects 180 MW from combined cycle plant to come onstream in 2015. | Cambodia | 200 | NA | Proposed | Preparation of feasibility studies and project implementation to span 5 years | Southern Economic Corridor | Mr. Heng Kunleang, Deputy Director, Energy Devt. Dept., MIME Tel: 85512 829778; Email: kunleang@hotmail.com |
| Energy | ENE033: Feasibility Study and Construction of 140 km Gas Pipeline Link between Block A, Offshore Cambodia and Sihanoukville PROFILE
The project will undertake a feasibility study and construction of the 140 Km gas pipeline link between Block A, Offshore Cambodia and Sihanoukville, with minimum capacity of 100mmscf/pd to support 600MW gas combined-circle Power Plant by successive phases of market demand in Sihanoukville.
Potential public-private sector project | Cambodia | 150 | NA | Proposed | Preparation of pre-feasibility and feasibility studies and bidding documents and project implementation will span 5 years. | Southern Economic Corridor | Cambodian National Petroleum Authority (CNPA ) |
| Energy | ENE034: Feasibility study and construction of the Transmission Line 230 kV Double Circuits Link Between Kampot and Sihanoukville PROFILE
The project will undertake a feasibility study and construction of transmission line 230 kV, double circuit of 90 km from Kampot to Sihanoukville, including the substation in Sihanoukville.
Need to determine potential financing. Note that ADB, World Bank and Nordic Development Fund (NDF) are financing Phnom Penh to VIE broder via Takeo; KfW (Germany) financing the Takeo- Kampot line. Developing the Kampot- Sihanoukville portion is critical f | Cambodia | 35 | NA | Proposed | Preparation of pre-feasibility and feasibility studies and bidding documents and project implementation will span 5 years. | Southern Economic Corridor | Mr. Heng Kunleang, Deputy Director, Energy Devt. Dept., MIME Tel: 85512 829778; Email: kunleang@hotmail.com |
| Energy | ENE035: Feasibility study and construction of Lower Sre Pok 2 Hydropower Project in Cambodia PROFILE
The project will carry out the feasibility study of the LSP2 HPP, which includes, among others, developing a least-cost hydropower plant to meet the local and sub-regional electricity demand, updating demand forecasts, conduct EIA and build staff capacity.
TBD; Potential public-private sector projects | Cambodia, Viet Nam | 353 | NA | Proposed | 2004-2006 for feasibility study 2005 ? 2008 for construction | Southern Economic Corridor | |
| Energy | ENE036: Feasibility study and construction of Lower Se San 2 Hydropower Project in Cambodia PROFILE
To carry out the Feasibility Study of the LSS2 HPP, which includes, among others, developing a least-cost hydropower plant to meet the local and sub-regional electricity demand, updating demand forecasts, conduct EIA and build staff capacity.
Project seeks grant financing | Cambodia, Viet Nam | 393 | NA | Proposed | 2004-2006 for feasibility study 2005 ? 2008 for construction | Southern Economic Corridor | |
| Energy | ENE037: Feasibility Study and construction of Thuong Kom Tum Hydropower Project in Viet Nam
| Viet Nam | NA | NA | Proposed | | Southern Economic Corridor | |
| Energy | ENE038: Feasibility study and construction of Se San 4 Hydropower Project
| Viet Nam | NA | NA | Proposed | | Southern Economic Corridor | |
| Energy | ENE039: Feasibility study and construction of An Khe Kra Nac Hydropower Project
| Viet Nam | NA | NA | Proposed | | Southern Economic Corridor | |
| Energy | ENE040: Feasibility study and construction of Sre Pok 3 Hydropower Project
| Viet Nam | NA | NA | Proposed | | Southern Economic Corridor | |
| Energy | ENE041: Feasibility study and construction of Sre Pok 4 Hydropower Project
| Viet Nam | NA | NA | Proposed | | Southern Economic Corridor | |
| Energy | ENE042: Feasibility study and construction of O Mon 3 Oil/Gas Fired Power Plant Project (600 MW) PROFILE
The project will undertake feasibility study and construction of O Mon 3 Oil/Gas Fired Power Plant to supply electricity for Mekong Delta area covering 12 provinces and cities, 92 districts, 12 towns and 1124 communes. Thernal Power Plant, condenser technology, capacity: 600MW
Proposed by Electricity of Viet Nam (EVN). Being developed by EVN as a fast-track project to be commissioned by 2007 to meet urgent demand of the southwestern province of the Mekong Delta. | Viet Nam | 550 | 550 | Ongoing | 2005- 2007 (fast track) | Southern Economic Corridor | Mr. Lam Du Son, VP, EVN Tel: 844 9349725; Fax: 844 8249462 |
| Energy | ENE043: Feasibility study and construction of O Mon 4 Combined Cycle Power Plant Project (720 MW) PROFILE
The project will undertake feasibility study and construction of O Mon to supply electricity for Mekong Delta area covering 12 provinces and cities, 92 districts, 12 towns and 1124 communes. Combined Cycle Gas Turbine Power Plant, capacity: 720 MW
Proposed by Electricity of Viet Nam (EVN). Project is projected for commissioning by 2012. Financing may be through joint venture, IPP or BOT, with possible ADB assistance through public/ private sector windows. | Viet Nam | 500 | NA | Proposed | 2008- 2011 | Southern Economic Corridor | Mr. Lam Du Son, VP, EVN Tel: 844 9349725; Fax: 844 8249462 |
| Energy | ENE044: Construction of O Mon Thermal Power Plant (O Mon 1 and 2)
The project aims to construct the O Mon thermal power plant (O Mon TPP), a gas power generation complex, that will be developed in stages between 2007 and 2014. It will utilize available gas resources in the Malay Tho Chu basin to produce electricity to meet growing demand in southern Viet Nam from 2007 onwards. Capacities are: O Mon 1 (600 MW) and O Mon 2 (720 MW). The cost estimate of $600 million is only for O Mon 2.
JBIC is financing O Mon 1 while O Mon 2 is for development by the private sector as IPP or BOT or joint venture. O Mon 2 will cost US$600 million. ADB could provide assistance to review feasibility of O Mon 2 and 4. | Viet Nam | 600 | NA | Proposed | 2007- 2009 | Southern Economic Corridor | Mr. Lam Du Son, VP, EVN Tel: 844 9349725; Fax: 844 8249462 |
| Energy | ENE045: Feasibility study and construction of Nhon Trach 3 Combined Cycle Power Project (720 MW) PROFILE
The project will undertake feasibility study and construction of Nhon Trach 3 to supply electricity for Ho Chi Minh city and surrounding areas including industry zones. Combined cycled gas turbine power plant, capacity: 720MW
Proposed by Electricity of Viet Nam (EVN). | Viet Nam | 450 | NA | Proposed | 2008-2011 | Southern Economic Corridor | Mr. Phan Minh Tuan, ICD, EVN Tel: 84 4 9349725/9344371