Mongolia
- Review of preliminary country experience with REGA technologies: the draft country report was submitted in December 2004. The report, endorsed by the National Counterpart Agency on 10 May 2005 is available at draft final Country
Report - Mongolia.
- REGA project development to pre-feasibility/feasibility stage:
Phase 1: The following pre-feasibility study reports have been prepared, and finalized:
- Liquefied Petroleum Gas Boiler, and
- Wind Energy Supply for Off-Grid Small Towns (Wind-Diesel)
Phase 2: The reports of the following project pre-feasibility studies are were prepared/revised:
- Policies and strategies for developing and promoting REGA technologies: draft report has been prepared and being reviewed by ADB.
- Technical studies: The following tentative studies were undertaken in Phase 2:
- Capacity building and outreach
 |
 |