China, People's Republic of
- Review of country experience with REGA technologies: the report is available on draft final Country Report - People's Republic of China.
- REGA project development to pre-feasibility/feasibility stage:
Phase 1: The following draft project pre-feasibility studies were prepared and are being updated:
- Debancheng No. 1 Wind Farm - Technical improvement and Capacity Expansion
- Kiln Fuel Substitution Project from Coal Gas to Natural Gas
- Renovation Project of Blower Motor of the #7 Boiler of Mudanjiang 2nd Power Plant
- Calcium Carbide Furnace Waste Heat Recovery Project
- Fuel Switching from Coal to Natural Gas for Residential Space Heating
Phase 2: The following project feasibility study/ CDM Project Design Document (PDD) has been prepared and revised:
- Policies and strategies for developing and promoting REGA technologies: being integrated with Phase 1 country report.
- Capacity building and outreach:
 |
 |