Sri Lanka
- REGA project development to pre-feasibility/feasibility stage:
Phase 1: The following pre-feasibility study report has been prepared and finalized.
- 5 MW Biomass Power Project
Phase 2: Project feasibility study/ CDM Project Design Document (PDD) developed:
- 5 MW Biomass Power Project
- Capacity building and outreach:
 |
 |