Asian Development Bank - Fighting Poverty in Asia and the Pacific
What's New  |   e-Notification  |   Sitemap  |   Contact Us  |   Help

Water

Home : Topics : Water : Water Operations : Pilot and Demonstration Activities : Groundwater Aquifer Rejuvenation Demonstration Pilot Project for Balochistan

News and Events
ADB's Water Policy
Water Financing Program
Water Operations
Sanitation Agenda
Loans and Technical Assistance
Networks
Partnerships
Pilot and Demonstration Activities
Promotion and Awareness
Funding Facilities
Water Champions
Country Water Actions
Knowledge Center
Contact Us


Pilot and Demonstration Activity: Pakistan
Groundwater Aquifer Rejuvenation Demonstration Pilot Project for Balochistan

This PDA demonstrated successful technologies for enabling the water stored at existing delay action dams to be put into shallow aquifers in Balochistan.


Project site Balochistan, Pakistan
Cost US$ 49,850
Status Completed
Approval date April 2005
Completion date April 2007
Category Basin Management
ADB officer Safdar Parvez
Partner IUCN Pakistan


Pakistan's desert climate means temperature can be as high as 40° Celsius and annual rainfall is low, causing surface water bodies to evaporate rapidly. In the past, groundwater was tapped through the traditional “karez,” a system of wells that draw from the water table. Today, however, the country’s groundwater resources are fast depleting.

Initially, delay action dams (DADs), which allow deep percolation through the reservoirs’ beds, served as solutions to restoring groundwater resources. However, studies show that high content of fine clay brought by runoff gets deposited and rapidly seals the beds. Consequently, the dams now act as mere evaporation ponds with little to no recharge through the beds. The need to control the situation, at the same time ensure that investments in DADs do not go to waste, is now urgent.



  • Increased recharge in shallow aquifer system resulting in increased flow in “karezes” and water levels in open wells
  • Increased understanding of recharge mechanism and technology among policy makers, planners and engineering community



Completed in April 2007, this PDA
  • Installed recharge structures (boreholes and infiltration galleries) in two dams; downstream of the Murghi Kotal Dam and upstream of the Dargai Dam to increase recharge for increased flow in “karezes” and water levels in open wells
  • Constructed a leaky structure at the upstream side of Dargai dam to delay the flow of water and filter it before releasing it into the recharge systems.
  • Conducted meetings with villagers and other stakeholders to explain the interventions, the proposed technologies, and their needed collaboration for maintaining the project structures

Read the final report. [ PDF ]