Results of ADB-Supported Operations: India

ADB operations in India began in 1986. Assistance has focused mainly on transport, energy, and urban development. In recent years, ADB has also been providing support for improving water resource management, promoting financial inclusion, and facilitating public-private partnerships in infrastructure.

ADB operations cover 22 Indian states, and the country has been one of the top three borrowers of ADB's ordinary capital resources loans since 2007. ADB is guided by the principles of the 3Rs (relevance, responsiveness, and results) as it designs and implements its program in India. ADB remains committed to supporting the government's efforts toward making India's growth inclusive and environmentally sustainable.

The country brief summarizes how the partnership between the Government of India and ADB has contributed to the development of the country.

  Download

Development Results of ADB-Supported Operations in India, 2010-2013

Energy

Greenhouse gas emission reduction between 2010-2013: 837,000 tCO2-equivalent per year

The avoided CO2 equivalent emission as a result of a clean energy project or component of a project. Projects with CO2 emission reduction include renewable energy generation, energy efficiency projects in supply and demand side, and use of cleaner fuels such as natural gas in place of coal or oil.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
42902-014: Gujarat Paguthan Wind Energy Financing Facility
Investment/Loan 7277/2417 4/17/2008 6/10/2009 Successful 69,000
42902-024: CLP WIND FARMS PRIVATE LIMITED (CWFPL
Investment/Loan 7277/2434 4/17/2008 3/31/2011 Successful 183,000
41900-014: Tata Power Wind Energy Financing Facility
Loan 7253/2326 4/17/2007 5/7/2007 Successful 105,000
36318: Assam Power Sector Development Program
SDP 2036/2037 12/10/2003 6/28/2005 Successful 480,000

*Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12 -24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

New households connected to electricity between 2010-2013: 606,174

Number of new households given electricity connection.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
39114-013: Tsunami Emergency Assistance (Sector)
Sector Project 2166 4/14/2005 2/9/2010 Successful 6,174
36318: Assam Power Sector Development Program
SDP 2036/2037 12/10/2003 6/28/2005 Successful 600,000

*Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12 -24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

New households connected to electricity, Rural between 2010-2013: 606,174

Number of new rural households given electricity connection.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
39114-013: Tsunami Emergency Assistance (Sector)
Sector Project 2166 4/14/2005 2/9/2010 Successful 6,174
36318: Assam Power Sector Development Program
SDP 2036/2037 12/10/2003 6/28/2005 Successful 600,000

*Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12 -24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Installed energy generation capacity between 2010-2013: 8,814 megawatts

Aggregated additional capacity in megawatts (MW) resulting from generation projects using conventional and renewable energy sources.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
42902-014: Gujarat Paguthan Wind Energy Financing Facility
Investment/Loan 7277/2417 4/17/2008 6/10/2009 Successful 50
42902-024: CLP WIND FARMS PRIVATE LIMITED (CWFPL
Investment/Loan 7277/2434 4/17/2008 3/31/2011 Successful 122
41900-014: Tata Power Wind Energy Financing Facility
Loan 7253/2326 4/17/2007 5/7/2007 Successful 79
39921-014: Dahej Liquefied Natural Gas Terminal Expansion Project
Investment/Loan 7245/2256 8/30/2006 7/27/2007 Highly successful 4,083
39916-014: NTPC Capacity Expansion Financing Facility
Loan 7242/2249 6/28/2005 not available Successful 4,480

*Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12 -24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Installed energy generation capacity between 2010-2013: 176 Renewable, megawatts

Aggregated additional capacity in megawatts (MW) resulting from generation projects using renewable energy sources.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
42902-014: Gujarat Paguthan Wind Energy Financing Facility
Investment/Loan 7277/2417 4/17/2008 6/10/2009 Successful 173
41900-014: Tata Power Wind Energy Financing Facility
Loan 7253/2326 4/17/2007 5/7/2007 Successful 3

*Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12 -24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Transmission lines installed or upgraded between 2010-2013: 2,019 kilometers

Length of power, gas, and oil transmission lines (ground distance in kilometers). For power transmission lines, this should be the simple distance from tower A to tower B and not the circuit-kilometer.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
32298-023: Madhya Pradesh Power Sector Investment Program (Tranche 1)
MFF/program 2323 2007 6/30/2012 Successful 1,437
39913-014: Urban Clean Fuels Project (CUGL)
Equity Investment 7227 1/17/2006 not available Successful 227
36318: Assam Power Sector Development Program
SDP 2036/2037 12/10/2003 6/28/2005 Successful 355

*Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12 -24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Distribution lines installed or updgraded between 2010-2013: 13,155 kilometers

Length of the distribution network of lines or pipes installed and/or upgraded in kilometers, aggregating: (i) power distribution lines installed or upgraded, generally at 110 kilovolts or lower; (ii) district heating network pipes installed or upgraded; and (iii) urban gas supply network pipes installed or upgraded.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
39114-013: Tsunami Emergency Assistance (Sector)
Sector Project 2166 4/14/2005 2/9/2010 Successful 2,371
36318: Assam Power Sector Development Program
SDP 2036/2037 12/10/2003 6/28/2005 Successful 10,784

*Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12 -24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Transport

Use of roads built or upgraded between 2010-2013: 9,320,775 average daily vehicle-kilometers in the first full year of operation

Traffic benefiting from built or upgraded roads in the year after project completion. Vehicles are buses, trucks, minivans, cars, motorcycles, and other motorized means of conveyance, depending on the country and location. Daily vehicle-kilometers is to be calculated by adding all distances in kilometers traveled by all types of vehicles in a day on roads built or upgraded.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
37066-033: Rural Roads Sector II Investment Program (Project 2)- State of Orissa
MFF 2414 3/17/2008 4/7/2011 Highly successful 105,429
37066-023: Rural Road Sector II Investment Program-Tranche 1
MFF 2248 7/31/2006 10/9/2009 Successful 516,763
36320: Rural Roads Sector I Project
Project 2018 11/20/2003 6/30/2009 Successful 2,281,975
34263: Madhya Pradesh State Roads Sector Development Program (Program)
Program 1958 12/5/2002 3/29/2006 Successful 3,743,594
32253-013: East-West Corridor Project
Project 1944 11/26/2002 8/24/2009 Successful 1,946,073
32203-013: West Bengal Corridor Development Project
Project 1870 12/11/2001 6/23/2011 Successful 482,934
30303-013: Karnataka Urban Development and Coastal Environmental Management Project
Project 1704 10/26/1999 11/25/2009 Successful 244,007

*Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12 -24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Roads built or upgraded between 2010-2013: 17,217 kilometers

Length of expressways and national highways (i.e., fully access-controlled roadways) and provincial, district, and rural road networks (i.e., roads without full access control) built or upgraded, expressed in kilometers.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
37066-033: Rural Roads Sector II Investment Program (Project 2)- State of Orissa
MFF 2414 3/17/2008 4/7/2011 Highly successful 1,014
37066-023: Rural Road Sector II Investment Program-Tranche 1
MFF 2248 7/31/2006 10/9/2009 Successful 2,927
39114-013: Tsunami Emergency Assistance (Sector)
Sector Project 2166 4/14/2005 2/9/2010 Successful 1,096
36320: Rural Roads Sector I Project
Project 2018 11/20/2003 6/30/2009 Successful 9,575
34263: Madhya Pradesh State Roads Sector Development Program (Project)
Project 1959 12/5/2002 3/29/2006 Successful 1,603
32253-013: East-West Corridor Project
Project 1944 11/26/2002 8/24/2009 Successful 503
32203-013: West Bengal Corridor Development Project
Project 1870 12/11/2001 6/23/2011 Successful 231
30303-013: Karnataka Urban Development and Coastal Environmental Management Project
Project 1704 10/26/1999 11/25/2009 Successful 172
29120: Rajasthan Urban Infrastructure Development Project
Project 1647 12/3/1998 6/11/2009 Successful 96

*Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12 -24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Expressways and national highways built or updgraded between 2010-2013: 738 kilometers

Expressways and national highways built or updgraded (kilometers)

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
39114-013: Tsunami Emergency Assistance (Sector)
Sector Project 2166 4/14/2005 2/9/2010 Successful 86
32253-013: East-West Corridor Project
Project 1944 11/26/2002 8/24/2009 Successful 503
32203-013: West Bengal Corridor Development Project
Project 1870 12/11/2001 6/23/2011 Successful 149

*Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12 -24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Provincial, district, and rural roads built or upgraded between 2010-2013: 16,479 kilometers

Length of expressways and national highways (i.e., fully access-controlled roadways) and provincial, district, and rural road networks (i.e., roads without full access control) built or upgraded, expressed in kilometers.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
37066-033: Rural Roads Sector II Investment Program (Project 2)- State of Orissa
MFF 2414 3/17/2008 4/7/2011 Highly successful 1,014
37066-023: Rural Road Sector II Investment Program-Tranche 1
MFF 2248 7/31/2006 10/9/2009 Successful 2,927
39114-013: Tsunami Emergency Assistance (Sector)
Sector Project 2166 4/14/2005 2/9/2010 Successful 1,010
36320: Rural Roads Sector I Project
Project 2018 11/20/2003 6/30/2009 Successful 9,575
34263: Madhya Pradesh State Roads Sector Development Program (Project)
Project 1959 12/5/2002 3/29/2006 Successful 1,603
32203-013: West Bengal Corridor Development Project
Project 1870 12/11/2001 6/23/2011 Successful 82
30303-013: Karnataka Urban Development and Coastal Environmental Management Project
Project 1704 10/26/1999 11/25/2009 Successful 172
29120: Rajasthan Urban Infrastructure Development Project
Project 1647 12/3/1998 6/11/2009 Successful 96

*Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12 -24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Roads built or upgraded, Rural between 2010-2013: 15,346 kilometers

Length of expressways and national highways (i.e., fully access-controlled roadways) and provincial, district, and rural road networks (i.e., roads without full access control) built or upgraded, expressed in kilometers.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
37066-033: Rural Roads Sector II Investment Program (Project 2)- State of Orissa
MFF 2414 3/17/2008 4/7/2011 Highly successful 1,014
37066-023: Rural Road Sector II Investment Program-Tranche 1
MFF 2248 7/31/2006 10/9/2009 Successful 2,927
39114-013: Tsunami Emergency Assistance (Sector)
Sector Project 2166 4/14/2005 2/9/2010 Successful 1,096
36320: Rural Roads Sector I Project
Project 2018 11/20/2003 6/30/2009 Successful 9,575
32253-013: East-West Corridor Project
Project 1944 11/26/2002 8/24/2009 Successful 503
32203-013: West Bengal Corridor Development Project
Project 1870 12/11/2001 6/23/2011 Successful 231

*Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12 -24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Roads built or upgraded, Urban between 2010-2013: 1,871 kilometers

Length of expressways and national highways (i.e., fully access-controlled roadways) and provincial, district, and rural road networks (i.e., roads without full access control) built or upgraded, expressed in kilometers.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
34263: Madhya Pradesh State Roads Sector Development Program (Project)
Project 1959 12/5/2002 3/29/2006 Successful 1,603
30303-013: Karnataka Urban Development and Coastal Environmental Management Project
Project 1704 10/26/1999 11/25/2009 Successful 172
29120: Rajasthan Urban Infrastructure Development Project
Project 1647 12/3/1998 6/11/2009 Successful 96

*Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12 -24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Water

Households with new or improved water supply between 2010-2013: 1,912,981

All additional households that benefit from projects offering piped or non-piped water supply systems that are of a higher order than the system that the households used before (non-piped supply may include standpipes), and households that are already connected to a piped system but are provided with improved service, e.g., longer hours of service and/or increased pressure.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
39114-013: Tsunami Emergency Assistance (Sector)
Sector Project 2166 4/14/2005 2/9/2010 Successful 415,807
30303-013: Karnataka Urban Development and Coastal Environmental Management Project
Project 1704 10/26/1999 11/25/2009 Successful 212,770
29120: Rajasthan Urban Infrastructure Development Project
Project 1647 12/3/1998 6/11/2009 Successful 1,284,404

*Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12 -24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Households with new or improved water supply, Rural between 2010-2013: 415,807

All additional households that benefit from projects offering piped or non-piped water supply systems that are of a higher order than the system that the households used before (non-piped supply may include standpipes), and households that are already connected to a piped system but are provided with improved service, e.g., longer hours of service and/or increased pressure.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
39114-013: Tsunami Emergency Assistance (Sector)
Sector Project 2166 4/14/2005 2/9/2010 Successful 415,807

*Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12 -24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Households with new or improved water supply, Urban between 2010-2013: 1,497,174

All additional households that benefit from projects offering piped or non-piped water supply systems that are of a higher order than the system that the households used before (non-piped supply may include standpipes), and households that are already connected to a piped system but are provided with improved service, e.g., longer hours of service and/or increased pressure.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
30303-013: Karnataka Urban Development and Coastal Environmental Management Project
Project 1704 10/26/1999 11/25/2009 Successful 212,770
29120: Rajasthan Urban Infrastructure Development Project
Project 1647 12/3/1998 6/11/2009 Successful 1,284,404

*Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12 -24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Households with new or improved sanitation between 2010-2013: 737,582

All additional households that benefit from projects offering a variety of sanitation systems to households that either did not benefit from sanitation systems before or benefit from systems of lesser order, and households that are already benefiting from sanitation services but are provided with improved service, e.g., sewer connection, septic tank, pour-flush, simple pit latrine, or ventilated improved pit latrine.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
39114-013: Tsunami Emergency Assistance (Sector)
Sector Project 2166 4/14/2005 2/9/2010 Successful 1,680
30303-013: Karnataka Urban Development and Coastal Environmental Management Project
Project 1704 10/26/1999 11/25/2009 Successful 93,700
29120: Rajasthan Urban Infrastructure Development Project
Project 1647 12/3/1998 6/11/2009 Successful 642,202

*Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12 -24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Waste water treatment capacity added or improved between 2010-2013: 130,670 cubic meters per day

Maximum cubic meters of wastewater intake per day at the new or improved treatment plant, excluding waste treatment capacity of septic tanks and the removal of the waste.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
30303-013: Karnataka Urban Development and Coastal Environmental Management Project
Project 1704 10/26/1999 11/25/2009 Successful 130,500
29120: Rajasthan Urban Infrastructure Development Project
Project 1647 12/3/1998 6/11/2009 Successful 170

*Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12 -24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Water supply pipes installed or upgraded between 2010-2013: 4,913 length of network in kilometers

All sizes of new and repaired or upgraded pipes intended to transport water for urban water use for domestic and nonagricultural business purposes, expressed as their aggregate length in the network, irrespective of pipe diameter, comprising mains as well as reticulation pipes.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
39114-013: Tsunami Emergency Assistance (Sector)
Sector Project 2166 4/14/2005 2/9/2010 Successful 1,150
30303-013: Karnataka Urban Development and Coastal Environmental Management Project
Project 1704 10/26/1999 11/25/2009 Successful 2,000
29120: Rajasthan Urban Infrastructure Development Project
Project 1647 12/3/1998 6/11/2009 Successful 1,763

*Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12 -24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Land improved through irrigation, drainage and/or flood management between 2010-2013: 50 hectares

Rural land area improved through any new or improved: (i) irrigation, (ii) drainage services, and (iii) flood management works.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
30303-013: Karnataka Urban Development and Coastal Environmental Management Project
Project 1704 10/26/1999 11/25/2009 Successful 50

*Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12 -24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Households with reduced flood risk between 2010-2013: 170,000

Rural land area improved through any new or improved: (i) irrigation, (ii) drainage services, and (iii) flood management works.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
30303-013: Karnataka Urban Development and Coastal Environmental Management Project
Project 1704 10/26/1999 11/25/2009 Successful 170,000

*Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12 -24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Finance

Microfinance loan accounts opened / end borrowers reached between 2010-2013: 491,312

The number of end borrowers; or, if not available, the number or estimate of microfinance loan accounts opened (regardless of amount in currency) over the course of the project. All those reached by microfinance lending or saving group activities of the project are counted, including participants in self-help groups. The definition of microfinance follows country conventions.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
39114-013: Tsunami Emergency Assistance (Sector)
Sector Project 2166 4/14/2005 2/9/2010 Successful 491,312

*Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12 -24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Microfinance loan accounts opened / end borrowers reached between 2010-2013: 442,181 Female, number

The number of end borrowers; or, if not available, the number or estimate of microfinance loan accounts opened (regardless of amount in currency) over the course of the project. All those reached by microfinance lending or saving group activities of the project are counted, including participants in self-help groups. The definition of microfinance follows country conventions.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
39114-013: Tsunami Emergency Assistance (Sector)
Sector Project 2166 4/14/2005 2/9/2010 Successful 442,181

*Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12 -24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Microfinance loan accounts opened / end borrowers reached between 2010-2013: 49,131 Male, number

The number of end borrowers; or, if not available, the number or estimate of microfinance loan accounts opened (regardless of amount in currency) over the course of the project. All those reached by microfinance lending or saving group activities of the project are counted, including participants in self-help groups. The definition of microfinance follows country conventions.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
39114-013: Tsunami Emergency Assistance (Sector)
Sector Project 2166 4/14/2005 2/9/2010 Successful 49,131

*Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12 -24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Regional Cooperation and Integration

Cross-border cargo volume facilitated between 2010-2013: 9,279,000 tons per year

Volume of cargo that crossed borders that are facilitated by ADB operations contributing to regional connectivity. Such operations may include regional road construction and rehabilitation, and border infrastructure and systems improvement.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
32203-013: West Bengal Corridor Development Project
Project 1870 12/11/2001 6/23/2011 Successful 9,279,000

*Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12 -24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

The table includes projects completed during the period, and funded by ADB's ordinary capital resources and/or the Asian Development Fund, cofinanciers, and the government. The outputs presented are limited to ADB's core sectors, as defined under Strategy 2020 and tracked through indicators in the ADB Results Framework. ADB monitors progress on these outputs in the annual Development Effectiveness Review. The numbers represent the sum of outputs and beneficiaries of individual projects. Therefore, the beneficiary numbers reported under education—teachers trained, and students benefitting from school improvement programs or direct support—include those who benefited from more than one project.

Source: ADB project completion reports