Results of ADB-Supported Operations: Indonesia

Beginning in 1966, early ADB assistance to Indonesia focused on agriculture but rapidly diversified in the 1980s to include energy, infrastructure, and education. In the years following the 1998 Asian Financial Crisis, ADB provided significant and sustained support to the government's ambitious program of reform and poverty reduction, particularly through program loans that encompassed development policy, infrastructure sector reform, capital market development, governance reform, and achievement of the Millennium Development Goals.

The country partnership strategy for 2012-2014 is closely attuned to the needs of Indonesia as a large middle-income country. Guided by the government’s commitment to “pro-poor, pro-job, pro-growth, and pro-environment” development, the two strategic CPS pillars are inclusive growth and environmental sustainability, including climate change mitigation and adaptation.

The country brief summarizes how the partnership between the Government of Indonesia and ADB has contributed to the development of the country.

  Download

Development Results of ADB-Supported Operations in Indonesia, 2010-2013

Energy

New households connected to electricity between 2010-2013: 1,294

Number of new households given electricity connection.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
39127: Earthquake and Tsunami Emergency Support Project
Project 0002 4/7/2005 12/30/2010 Successful 1,294

*Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12 -24 months after project completion, the figures may include information from projects completed earlier than 2010.

New households connected to electricity, Rural between 2010-2013: 851

Number of new rural households given electricity connection.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
39127: Earthquake and Tsunami Emergency Support Project
Project 0002 4/7/2005 12/30/2010 Successful 851

*Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12 -24 months after project completion, the figures may include information from projects completed earlier than 2010.

New households connected to electricity, Urban between 2010-2013: 443

Number of new urban households given electricity connection.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
39127: Earthquake and Tsunami Emergency Support Project
Project 0002 4/7/2005 12/30/2010 Successful 443

*Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12 -24 months after project completion, the figures may include information from projects completed earlier than 2010.

Transmission lines installed or upgraded between 2010-2013: 71 kilometers

Length of power, gas, and oil transmission lines (ground distance in kilometers). For power transmission lines, this should be the simple distance from tower A to tower B and not the circuit-kilometer.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
38919-014: Tangguh Liquefied Natural Gas Project
Loan 7224/2214 12/14/2005 11/15/2010 Highly successful 40
39127: Earthquake and Tsunami Emergency Support Project
Project 0002 4/7/2005 12/30/2010 Successful 31

*Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12 -24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Transport

Use of roads built or upgraded between 2010-2013: 4,674,202 average daily vehicle-kilometers in the first full year of operation

Traffic benefiting from built or upgraded roads in the year after project completion. Vehicles are buses, trucks, minivans, cars, motorcycles, and other motorized means of conveyance, depending on the country and location. Daily vehicle-kilometers is to be calculated by adding all distances in kilometers traveled by all types of vehicles in a day on roads built or upgraded.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
34159: Road Rehabilitation-2 Project
Project 2184 9/29/2005 4/19/2011 Successful 4,674,202

*Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12 -24 months after project completion, the figures may include information from projects completed earlier than 2010.

Roads built or upgraded between 2010-2013: 19,942 kilometers

Length of expressways and national highways (i.e., fully access-controlled roadways) and provincial, district, and rural road networks (i.e., roads without full access control) built or upgraded, expressed in kilometers.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
40247-013: Rural Infrastructure Support to the PNPM Mandiri Project
Project 2449 9/29/2008 9/9/2011 Successful 1,636
39597: Rural Infrastructure Support Project
Project 2221 12/19/2005 8/11/2009 Successful 3,849
34159: Road Rehabilitation-2 Project
Project 2184 9/29/2005 4/19/2011 Successful 1,145
39127: Earthquake and Tsunami Emergency Support Project
Project 0002 4/7/2005 12/30/2010 Successful 75
35143: Neighborhood Upgrading and Shelter Sector Project
Project 2072 12/19/2003 5/31/2011 Successful 1,600
32176-013: Coral Reef Rehabilitation and Management Project Phase II
Project 1962 12/6/2002 8/1/2012 Successful 7
34112: Poor Farmers' Income Improvement Through Innovation Project
Project 1909 8/15/2002 8/15/2002 Successful 11,630

*Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12 -24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Expressways and national highways built or updgraded between 2010-2013: 1,393 kilometers

Expressways and national highways built or updgraded (kilometers)

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
39597: Rural Infrastructure Support Project
Project 2221 12/19/2005 8/11/2009 Successful 176
34159: Road Rehabilitation-2 Project
Project 2184 9/29/2005 4/19/2011 Successful 1,145
39127: Earthquake and Tsunami Emergency Support Project
Project 0002 4/7/2005 12/30/2010 Successful 72

*Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12 -24 months after project completion, the figures may include information from projects completed earlier than 2010.

Provincial, district, and rural roads built or upgraded between 2010-2013: 18,549 kilometers

Length of expressways and national highways (i.e., fully access-controlled roadways) and provincial, district, and rural road networks (i.e., roads without full access control) built or upgraded, expressed in kilometers.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
40247-013: Rural Infrastructure Support to the PNPM Mandiri Project
Project 2449 9/29/2008 9/9/2011 Successful 1,636
39597: Rural Infrastructure Support Project
Project 2221 12/19/2005 8/11/2009 Successful 3,673
39127: Earthquake and Tsunami Emergency Support Project
Project 0002 4/7/2005 12/30/2010 Successful 3
35143: Neighborhood Upgrading and Shelter Sector Project
Project 2072 12/19/2003 5/31/2011 Successful 1,600
32176-013: Coral Reef Rehabilitation and Management Project Phase II
Project 1962 12/6/2002 8/1/2012 Successful 7
34112: Poor Farmers' Income Improvement Through Innovation Project
Project 1909 8/15/2002 8/15/2002 Successful 11,630

*Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12 -24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Roads built or upgraded, Rural between 2010-2013: 17,924 kilometers

Length of expressways and national highways (i.e., fully access-controlled roadways) and provincial, district, and rural road networks (i.e., roads without full access control) built or upgraded, expressed in kilometers.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
40247-013: Rural Infrastructure Support to the PNPM Mandiri Project
Project 2449 9/29/2008 9/9/2011 Successful 1,636
39597: Rural Infrastructure Support Project
Project 2221 12/19/2005 8/11/2009 Successful 3,849
34159: Road Rehabilitation-2 Project
Project 2184 9/29/2005 4/19/2011 Successful 753
39127: Earthquake and Tsunami Emergency Support Project
Project 0002 4/7/2005 12/30/2010 Successful 49
32176-013: Coral Reef Rehabilitation and Management Project Phase II
Project 1962 12/6/2002 8/1/2012 Successful 7
34112: Poor Farmers' Income Improvement Through Innovation Project
Project 1909 8/15/2002 8/15/2002 Successful 11,630

*Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12 -24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Roads built or upgraded, Urban between 2010-2013: 2,018 kilometers

Length of expressways and national highways (i.e., fully access-controlled roadways) and provincial, district, and rural road networks (i.e., roads without full access control) built or upgraded, expressed in kilometers.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
34159: Road Rehabilitation-2 Project
Project 2184 9/29/2005 4/19/2011 Successful 392
39127: Earthquake and Tsunami Emergency Support Project
Project 0002 4/7/2005 12/30/2010 Successful 26
35143: Neighborhood Upgrading and Shelter Sector Project
Project 2072 12/19/2003 5/31/2011 Successful 1,600

*Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12 -24 months after project completion, the figures may include information from projects completed earlier than 2010.

Water

Households with new or improved water supply between 2010-2013: 786,123

All additional households that benefit from projects offering piped or non-piped water supply systems that are of a higher order than the system that the households used before (non-piped supply may include standpipes), and households that are already connected to a piped system but are provided with improved service, e.g., longer hours of service and/or increased pressure.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
40247-013: Rural Infrastructure Support to the PNPM Mandiri Project
Project 2449 9/29/2008 9/9/2011 Successful 48,110
39597: Rural Infrastructure Support Project
Project 2221 12/19/2005 8/11/2009 Successful 423,200
41913-014: PT Pam Lyonnaise Jaya (West Jakarta Water Supply)
Loan 7262/2349 6/29/2005 3/18/2012 Successful 70,329
39127: Earthquake and Tsunami Emergency Support Project
Project 0002 4/7/2005 12/30/2010 Successful 31,273
34152-013: Community Water Services and Health Project
Project 2163/2164 2005 7/5/2013 Partly successful 202,711
35143: Neighborhood Upgrading and Shelter Sector Project
Project 2072 12/19/2003 5/31/2011 Successful 6,500
32176-013: Coral Reef Rehabilitation and Management Project Phase II
Project 1962 12/6/2002 8/1/2012 Successful 4,000

*Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12 -24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Households with new or improved water supply, Rural between 2010-2013: 698,599

All additional households that benefit from projects offering piped or non-piped water supply systems that are of a higher order than the system that the households used before (non-piped supply may include standpipes), and households that are already connected to a piped system but are provided with improved service, e.g., longer hours of service and/or increased pressure.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
40247-013: Rural Infrastructure Support to the PNPM Mandiri Project
Project 2449 9/29/2008 9/9/2011 Successful 48,110
39597: Rural Infrastructure Support Project
Project 2221 12/19/2005 8/11/2009 Successful 423,200
39127: Earthquake and Tsunami Emergency Support Project
Project 0002 4/7/2005 12/30/2010 Successful 20,578
34152-013: Community Water Services and Health Project
Project 2163/2164 2005 7/5/2013 Partly successful 202,711
32176-013: Coral Reef Rehabilitation and Management Project Phase II
Project 1962 12/6/2002 8/1/2012 Successful 4,000

*Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12 -24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Households with new or improved water supply, Urban between 2010-2013: 87,524

All additional households that benefit from projects offering piped or non-piped water supply systems that are of a higher order than the system that the households used before (non-piped supply may include standpipes), and households that are already connected to a piped system but are provided with improved service, e.g., longer hours of service and/or increased pressure.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
41913-014: PT Pam Lyonnaise Jaya (West Jakarta Water Supply)
Loan 7262/2349 6/29/2005 3/18/2012 Successful 70,329
39127: Earthquake and Tsunami Emergency Support Project
Project 0002 4/7/2005 12/30/2010 Successful 10,695
35143: Neighborhood Upgrading and Shelter Sector Project
Project 2072 12/19/2003 5/31/2011 Successful 6,500

*Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12 -24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Households with new or improved sanitation between 2010-2013: 140,817

All additional households that benefit from projects offering a variety of sanitation systems to households that either did not benefit from sanitation systems before or benefit from systems of lesser order, and households that are already benefiting from sanitation services but are provided with improved service, e.g., sewer connection, septic tank, pour-flush, simple pit latrine, or ventilated improved pit latrine.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
40247-013: Rural Infrastructure Support to the PNPM Mandiri Project
Project 2449 9/29/2008 9/9/2011 Successful 5,300
39597: Rural Infrastructure Support Project
Project 2221 12/19/2005 8/11/2009 Successful 15,870
34152-013: Community Water Services and Health Project
Project 2163/2164 2005 7/5/2013 Partly successful 85,280
35143: Neighborhood Upgrading and Shelter Sector Project
Project 2072 12/19/2003 5/31/2011 Successful 26,200
32176-013: Coral Reef Rehabilitation and Management Project Phase II
Project 1962 12/6/2002 8/1/2012 Successful 8,167

*Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12 -24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Water supply pipes installed or upgraded between 2010-2013: 10,275 length of network in kilometers

All sizes of new and repaired or upgraded pipes intended to transport water for urban water use for domestic and nonagricultural business purposes, expressed as their aggregate length in the network, irrespective of pipe diameter, comprising mains as well as reticulation pipes.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
40247-013: Rural Infrastructure Support to the PNPM Mandiri Project
Project 2449 9/29/2008 9/9/2011 Successful 50
39597: Rural Infrastructure Support Project
Project 2221 12/19/2005 8/11/2009 Successful 657
41913-014: PT Pam Lyonnaise Jaya (West Jakarta Water Supply)
Loan 7262/2349 6/29/2005 3/18/2012 Successful 1,940
34152-013: Community Water Services and Health Project
Project 2163/2164 2005 7/5/2013 Partly successful 7,600
35143: Neighborhood Upgrading and Shelter Sector Project
Project 2072 12/19/2003 5/31/2011 Successful 28

*Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12 -24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Land improved through irrigation, drainage and/or flood management between 2010-2013: 61,494 hectares

Rural land area improved through any new or improved: (i) irrigation, (ii) drainage services, and (iii) flood management works.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
40247-013: Rural Infrastructure Support to the PNPM Mandiri Project
Project 2449 9/29/2008 9/9/2011 Successful 1,540
39127: Earthquake and Tsunami Emergency Support Project
Project 0002 4/7/2005 12/30/2010 Successful 56,400
34112: Poor Farmers' Income Improvement Through Innovation Project
Project 1909 8/15/2002 8/15/2002 Successful 3,554

*Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12 -24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Finance

Microfinance loan accounts opened / end borrowers reached between 2010-2013: 13,164

The number of end borrowers; or, if not available, the number or estimate of microfinance loan accounts opened (regardless of amount in currency) over the course of the project. All those reached by microfinance lending or saving group activities of the project are counted, including participants in self-help groups. The definition of microfinance follows country conventions.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
39127: Earthquake and Tsunami Emergency Support Project
Project 0002 4/7/2005 12/30/2010 Successful 11,000
35143: Neighborhood Upgrading and Shelter Sector Project
Project 2072 12/19/2003 5/31/2011 Successful 2,164

*Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12 -24 months after project completion, the figures may include information from projects completed earlier than 2010.

Microfinance loan accounts opened / end borrowers reached between 2010-2013: 7,647 Female, number

The number of end borrowers; or, if not available, the number or estimate of microfinance loan accounts opened (regardless of amount in currency) over the course of the project. All those reached by microfinance lending or saving group activities of the project are counted, including participants in self-help groups. The definition of microfinance follows country conventions.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
39127: Earthquake and Tsunami Emergency Support Project
Project 0002 4/7/2005 12/30/2010 Successful 6,500
35143: Neighborhood Upgrading and Shelter Sector Project
Project 2072 12/19/2003 5/31/2011 Successful 1,147

*Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12 -24 months after project completion, the figures may include information from projects completed earlier than 2010.

Microfinance loan accounts opened / end borrowers reached between 2010-2013: 5,517 Male, number

The number of end borrowers; or, if not available, the number or estimate of microfinance loan accounts opened (regardless of amount in currency) over the course of the project. All those reached by microfinance lending or saving group activities of the project are counted, including participants in self-help groups. The definition of microfinance follows country conventions.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
39127: Earthquake and Tsunami Emergency Support Project
Project 0002 4/7/2005 12/30/2010 Successful 4,500
35143: Neighborhood Upgrading and Shelter Sector Project
Project 2072 12/19/2003 5/31/2011 Successful 1,017

*Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12 -24 months after project completion, the figures may include information from projects completed earlier than 2010.

Education

Students benefiting from new or improved educational facilities between 2010-2013: 1,573,540

Total number of students benefiting from new or upgraded physical educational facilities.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
31137-013: Decentralized Basic Education Project (L)
Project 1863 11/29/2001 6/30/2009 Successful 1,573,540

*Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12 -24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Female students benefiting from new or improved educational facilities between 2010-2013: 807,226

Total number of female students benefiting from new or upgraded physical educational facilities.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
31137-013: Decentralized Basic Education Project (L)
Project 1863 11/29/2001 6/30/2009 Successful 807,226

*Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12 -24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Male students benefiting from new or improved educational facilities between 2010-2013: 766,314

Total number of male students benefiting from new or upgraded physical educational facilities.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
31137-013: Decentralized Basic Education Project (L)
Project 1863 11/29/2001 6/30/2009 Successful 766,314

*Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12 -24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

The table includes projects completed during the period, and funded by ADB's ordinary capital resources and/or the Asian Development Fund, cofinanciers, and the government. The outputs presented are limited to ADB's core sectors, as defined under Strategy 2020 and tracked through indicators in the ADB Results Framework. ADB monitors progress on these outputs in the annual Development Effectiveness Review. The numbers represent the sum of outputs and beneficiaries of individual projects. Therefore, the beneficiary numbers reported under education—teachers trained, and students benefitting from school improvement programs or direct support—include those who benefited from more than one project.

Source: ADB project completion reports