Results from ADB-Supported Operations in Maldives, 2004-2012
As of 31 December 2012 Download Excel file
|
Sector/Output |
Outputs Delivered |
|
Education |
|
Classrooms built or upgraded (number) |
2 |
|
Teachers trained (number) |
2,570 |
|
Students benefiting from school improvement programs or direct support (number) |
28,605 |
|
Energy |
|
Installed energy generation capacity (megawatt equivalent) |
26 |
|
Distribution lines installed or updgraded (kilometers) |
20 |
|
New households connected to electricity (number) |
930 |
|
Transport |
|
National highways and provincial, district, and rural roads built or upgraded (kilometers) |
14 |
|
Beneficiaries from road projects (number) |
40,000 |
|
Water |
|
New households served with sanitation (number) |
60 |
|
The table includes projects completed during the period, and funded by ADB's ordinary capital resources and/or the Asian Development Fund, cofinanciers, and the government. The outputs presented are limited to ADB's core sectors, as defined under Strategy 2020 and tracked through indicators in the ADB Results Framework. ADB monitors progress on these outputs in the annual Development Effectiveness Review. The numbers represent the sum of outputs and beneficiaries of individual projects. Therefore, the beneficiary numbers reported under education—teachers trained, and students benefitting from school improvement programs or direct support—include those who benefited from more than one project.
Source: ADB project completion reports
|
Classrooms built or upgraded between 2004-2012: 2
Classrooms cover (i) classrooms; (ii) laboratory rooms, including those for science, computers, and languages; (iii) lecture halls; (iv) libraries and workshop facilities; (v) auditoriums; and (vi) sports facilities, which may include gyms, and basketball and volleyball courts.
Contributing ADB Projects
|
Project Name |
Type of Assistance |
Approval Number |
Approval Date |
Closing Date |
Success Rating at Completion* |
Contribution to Output |
|
28161-013: Postsecondary Education Development Project |
Loan |
1637 |
30-Sep-98 |
14-May-09 |
Successful |
2 |
*The above table reflects project ratings from project completion reports. These ratings are updated with those from the project completion report validation reports and/or project/program performance evaluation reports when these reports become available.
NOTE: Links open in a new window. |
Teachers trained between 2004-2012: 2,570
The number of teachers or professors trained over the duration of the project as a result of the project, both pre-service in order to become teachers; and in-service, for teachers to acquire or improve their teaching capacity. Teachers refer to those employed in formal primary, secondary, and tertiary education.
Contributing ADB Projects
|
Project Name |
Type of Assistance |
Approval Number |
Approval Date |
Closing Date |
Success Rating at Completion* |
Contribution to Output |
|
28161-013: Postsecondary Education Development Project |
Loan |
1637 |
30-Sep-98 |
14-May-09 |
Successful |
2,478 |
|
33217-013: Employment Skills Training Project |
Loan |
2028 |
2-Dec-03 |
29-Feb-12 |
Successful |
92 |
*The above table reflects project ratings from project completion reports. These ratings are updated with those from the project completion report validation reports and/or project/program performance evaluation reports when these reports become available.
NOTE: Links open in a new window. |
Students benefiting from school improvement programs or direct support between 2004-2012: 28,605
Students benefiting from (i) school improvement programs (at the end of the project); or (ii) having received direct support through scholarships, feeding, or similar programs (total number over the duration of the project). School improvement programs include civil works and provision of equipment or furniture.
Contributing ADB Projects
|
Project Name |
Type of Assistance |
Approval Number |
Approval Date |
Closing Date |
Success Rating at Completion* |
Contribution to Output |
|
28161-013: Postsecondary Education Development Project |
Loan |
1637 |
30-Sep-98 |
14-May-09 |
Successful |
22,776 |
|
33217-013: Employment Skills Training Project |
Loan |
2028 |
2-Dec-03 |
29-Feb-12 |
Successful |
5,829 |
*The above table reflects project ratings from project completion reports. These ratings are updated with those from the project completion report validation reports and/or project/program performance evaluation reports when these reports become available.
NOTE: Links open in a new window. |
Installed energy generation capacity between 2004-2012: 26 megawatt equivalent
The indicator, given in megawatt (MW) equivalent is the total incremental generating capacity of a generation project. This may be power sourced from renewable technology or from conventional sources e.g., oil, coal, or large hydro. A project may involve construction of a new power plant or simply acquisition of an asset, e.g., the private sector acquiring a government-owned coal plant. This includes the MW-equivalent capacity of additional heating supply as well as hydrocarbon-based energy added through production or additional import capacity. Energy export is excluded from Level 2 measurement as it does not add to the energy resources of a country.
Contributing ADB Projects
|
Project Name |
Type of Assistance |
Approval Number |
Approval Date |
Closing Date |
Success Rating at Completion* |
Contribution to Output |
|
39099-013: Tsunami Emergency Assistance |
Loan |
2160 |
31-Mar-05 |
31-Aug-08 |
Less Successful |
8 |
|
32036-013: Outer Islands Electrification (Sector) Project |
Loan |
1887 |
18-Dec-01 |
31-Dec-09 |
Partly successful |
6 |
|
26305: Third Power System Development Project |
Loan |
1532 |
09-Sep-97 |
09-Jan-04 |
Highly successful / successful |
12 |
*The above table reflects project ratings from project completion reports. These ratings are updated with those from the project completion report validation reports and/or project/program performance evaluation reports when these reports become available.
NOTE: Links open in a new window. |
Distribution lines installed or updgraded between 2004-2012: 20 kilometers
"Distribution lines installed or upgraded" is the aggregate of the following three sub-indicators: (i) km of power distribution lines installed or upgraded, generally at 110 kv or lower); (ii) km of district heating network pipes installed or upgraded; and (iii) km of urban gas supply network pipes installed or upgraded.
Contributing ADB Projects
|
Project Name |
Type of Assistance |
Approval Number |
Approval Date |
Closing Date |
Success Rating at Completion* |
Contribution to Output |
|
39099-013: Tsunami Emergency Assistance |
Loan |
2160 |
31-Mar-05 |
31-Aug-08 |
Less Successful |
20 |
*The above table reflects project ratings from project completion reports. These ratings are updated with those from the project completion report validation reports and/or project/program performance evaluation reports when these reports become available.
NOTE: Links open in a new window. |
New households connected to electricity between 2004-2012: 930
The indicator is the number of new households connected to the grid. Only new household connections resulting from a project are counted; households already connected to the grid and receiving improved services through a project are not counted. The number of new household connections resulting from a project is counted in total and not proportional to the ADB funding component only. The guiding principle is that ADB assistance is integral to the completion of the entire project; without the ADB assistance, the total target household connections would not be attained.
Contributing ADB Projects
|
Project Name |
Type of Assistance |
Approval Number |
Approval Date |
Closing Date |
Success Rating at Completion* |
Contribution to Output |
|
39099-013: Tsunami Emergency Assistance |
Loan |
2160 |
31-Mar-05 |
31-Aug-08 |
Less Successful |
930 |
*The above table reflects project ratings from project completion reports. These ratings are updated with those from the project completion report validation reports and/or project/program performance evaluation reports when these reports become available.
NOTE: Links open in a new window. |
National highways and provincial, district, and rural roads built or upgraded between 2004-2012: 14 kilometers
Length of open access road networks built or upgraded in km (without full access control). "Upgrading" includes all activity to restore a degraded road to originally intended design capacity (repair/rehabilitation) and to improve on its design capacity (e.g. by widening). Upgrading does not cover road signage (only).
Contributing ADB Projects
|
Project Name |
Type of Assistance |
Approval Number |
Approval Date |
Closing Date |
Success Rating at Completion* |
Contribution to Output |
|
28321-013: Regional Development Project |
Loan |
1695 |
02-Sep-99 |
31-Dec-05 |
Partly successful |
14 |
*The above table reflects project ratings from project completion reports. These ratings are updated with those from the project completion report validation reports and/or project/program performance evaluation reports when these reports become available.
NOTE: Links open in a new window. |
Beneficiaries from road projects between 2004-2012: 40,000
Includes all beneficiaries defined by reports and recommendations of the President or project completion reports as beneficiaries of roads constructed or upgraded; generally those in the vicinity of the road or in the project area. Beneficiaries of railway projects are not included.
Contributing ADB Projects
|
Project Name |
Type of Assistance |
Approval Number |
Approval Date |
Closing Date |
Success Rating at Completion* |
Contribution to Output |
|
28321-013: Regional Development Project |
Loan |
1695 |
02-Sep-99 |
31-Dec-05 |
Partly successful |
40,000 |
*The above table reflects project ratings from project completion reports. These ratings are updated with those from the project completion report validation reports and/or project/program performance evaluation reports when these reports become available.
NOTE: Links open in a new window. |
New households served with sanitation between 2004-2012: 60
This refers to all additional households that benefit from projects offering a variety of sanitation systems to households that either did not benefit from sanitation systems before, or benefited from systems of lesser order. The situation at the end of the project is to be reflected.
Contributing ADB Projects
|
Project Name |
Type of Assistance |
Approval Number |
Approval Date |
Closing Date |
Success Rating at Completion* |
Contribution to Output |
|
28321-013: Regional Development Project |
Loan |
1695 |
02-Sep-99 |
31-Dec-05 |
Partly successful |
60 |
*The above table reflects project ratings from project completion reports. These ratings are updated with those from the project completion report validation reports and/or project/program performance evaluation reports when these reports become available.