Results of ADB-Supported Operations: Sri Lanka

The partnership between Sri Lanka and ADB started in 1986. Since then, ADB has helped the country to improve its transport, education, power, and water supply and sanitation systems. Sustained and uninterrupted ADB engagement in these key sectors helped Sri Lanka to enhance service delivery to the country’s population.

In education, policy changes have been achieved and innovations introduced. The country’s road network has been upgraded and extended. In the water sector, two million people were provided access to safe water, institutional capacity was developed, and reforms were introduced. The country’s rural electrification grid and transmission and distribution systems have also been expanded. ADB’s post-conflict assistance has yielded tangible results.

The country brief summarizes how the partnership between the Government of Sri Lanka and ADB has contributed to the development of the country.

  Download

Results of ADB-Supported Operations in Sri Lanka, 2010-2013

Energy

New households connected to electricity between 2010-2013: 189,234

Number of new households given electricity connection.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
38111-023/36601-013: North East Community Restoration and Development Project
Project 2084/2168/2618 2004 2/9/2009 Successful 17,300
37245-013: Conflict-Affected Area Rehabilitation Project
Project 2043 12/11/2003 12/13/2011 Successful 27,000
30207: Power Sector Development Program
SDP 1929 10/31/2002 6/30/2006 Partly successful 72,467
30207: Power Sector Development Program
SDP 1930 10/31/2002 3/31/2010 Partly successful 72,467

* Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12-24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

New households connected to electricity, Rural between 2010-2013: 189,234

Number of new rural households given electricity connection.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
38111-023/36601-013: North East Community Restoration and Development Project
Project 2084/2168/2618 2004 2/9/2009 Successful 17,300
37245-013: Conflict-Affected Area Rehabilitation Project
Project 2043 12/11/2003 12/13/2011 Successful 27,000
30207: Power Sector Development Program
SDP 1929 10/31/2002 6/30/2006 Partly successful 72,467
30207: Power Sector Development Program
SDP 1930 10/31/2002 3/31/2010 Partly successful 72,467

* Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12-24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Installed energy generation capacity between 2010-2013: 163 megawatts

Aggregated additional capacity in megawatts (MW) resulting from generation projects using conventional and renewable energy sources.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
34912: AES Kelantissa Review Report
Loan/Guarantee 7167/1815 12/1/2000 6/15/2001 Less successful 163

* Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12-24 months after project completion, the figures may include information from projects completed earlier than 2010.

Transmission lines installed or upgraded between 2010-2013: 7,830 kilometers

Length of power, gas, and oil transmission lines (ground distance in kilometers). For power transmission lines, this should be the simple distance from tower A to tower B and not the circuit-kilometer.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
30207: Power Sector Development Program
SDP 1929 10/31/2002 6/30/2006 Partly successful 3,915
30207: Power Sector Development Program
SDP 1930 10/31/2002 3/31/2010 Partly successful 3,915

* Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12-24 months after project completion, the figures may include information from projects completed earlier than 2010.

Distribution lines installed or updgraded between 2010-2013: 380 kilometers

Length of the distribution network of lines or pipes installed and/or upgraded in kilometers, aggregating: (i) power distribution lines installed or upgraded, generally at 110 kilovolts or lower; (ii) district heating network pipes installed or upgraded; and (iii) urban gas supply network pipes installed or upgraded.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
30207: Power Sector Development Program
SDP 1929 10/31/2002 6/30/2006 Partly successful 190
30207: Power Sector Development Program
SDP 1930 10/31/2002 3/31/2010 Partly successful 190

* Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12-24 months after project completion, the figures may include information from projects completed earlier than 2010.

Transport

Use of roads built or upgraded between 2010-2013: 529,691 average daily vehicle-kilometers in the first full year of operation

Traffic benefiting from built or upgraded roads in the year after project completion. Vehicles are buses, trucks, minivans, cars, motorcycles, and other motorized means of conveyance, depending on the country and location. Daily vehicle-kilometers is to be calculated by adding all distances in kilometers traveled by all types of vehicles in a day on roads built or upgraded.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
37245-013: Conflict-Affected Area Rehabilitation Project
Project 2043 12/11/2003 12/13/2011 Successful 331,057
37245-013: Conflict-Affected Area Rehabilitation Project
Project 2044 12/11/2003 4/19/2011 Successful 198,634

* Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12-24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Roads built or upgraded between 2010-2013: 2,341 kilometers

Length of expressways and national highways (i.e., fully access-controlled roadways) and provincial, district, and rural road networks (i.e., roads without full access control) built or upgraded, expressed in kilometers.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
39144-013: Tsunami-Affected Areas Rebuilding Project
Project 2167 4/14/2005 1/31/2011 Successful 370
38111-023/36601-013: North East Community Restoration and Development Project
Project 2084/2168/2618 2004 2/9/2009 Successful 216
37245-013: Conflict-Affected Area Rehabilitation Project
Project 2043 12/11/2003 12/13/2011 Successful 91
37245-013: Conflict-Affected Area Rehabilitation Project
Project 2044 12/11/2003 4/19/2011 Successful 211
34023: Plantation Development Project
Project 1913 9/13/2002 2/22/2010 Successful 260
34023: Plantation Development Project
Project 1914 9/13/2002 11/26/2009 Successful 260
31282: Southern Province Rural Economic Advancement Project
Project 1849 10/26/2001 12/31/2009 Less successful 933

* Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12-24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Expressways and national highways built or updgraded between 2010-2013: 634 kilometers

Expressways and national highways built or updgraded (kilometers)

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
39144-013: Tsunami-Affected Areas Rebuilding Project
Project 2167 4/14/2005 1/31/2011 Successful 332
37245-013: Conflict-Affected Area Rehabilitation Project
Project 2043 12/11/2003 12/13/2011 Successful 91
37245-013: Conflict-Affected Area Rehabilitation Project
Project 2044 12/11/2003 4/19/2011 Successful 211

* Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12-24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Provincial, district, and rural roads built or upgraded between 2010-2013: 1,707 kilometers

Length of expressways and national highways (i.e., fully access-controlled roadways) and provincial, district, and rural road networks (i.e., roads without full access control) built or upgraded, expressed in kilometers.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
39144-013: Tsunami-Affected Areas Rebuilding Project
Project 2167 4/14/2005 1/31/2011 Successful 38
38111-023/36601-013: North East Community Restoration and Development Project
Project 2084/2168/2618 2004 2/9/2009 Successful 216
34023: Plantation Development Project
Project 1913 9/13/2002 2/22/2010 Successful 260
34023: Plantation Development Project
Project 1914 9/13/2002 11/26/2009 Successful 260
31282: Southern Province Rural Economic Advancement Project
Project 1849 10/26/2001 12/31/2009 Less successful 933

* Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12-24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Roads built or upgraded, Rural between 2010-2013: 2,341 kilometers

Length of expressways and national highways (i.e., fully access-controlled roadways) and provincial, district, and rural road networks (i.e., roads without full access control) built or upgraded, expressed in kilometers.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
39144-013: Tsunami-Affected Areas Rebuilding Project
Project 2167 4/14/2005 1/31/2011 Successful 370
38111-023/36601-013: North East Community Restoration and Development Project
Project 2084/2168/2618 2004 2/9/2009 Successful 216
37245-013: Conflict-Affected Area Rehabilitation Project
Project 2043 12/11/2003 12/13/2011 Successful 91
37245-013: Conflict-Affected Area Rehabilitation Project
Project 2044 12/11/2003 4/19/2011 Successful 211
34023: Plantation Development Project
Project 1913 9/13/2002 2/22/2010 Successful 260
34023: Plantation Development Project
Project 1914 9/13/2002 11/26/2009 Successful 260
31282: Southern Province Rural Economic Advancement Project
Project 1849 10/26/2001 12/31/2009 Less successful 933

* Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12-24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Water

Households with new or improved water supply between 2010-2013: 56,572

All additional households that benefit from projects offering piped or non-piped water supply systems that are of a higher order than the system that the households used before (non-piped supply may include standpipes), and households that are already connected to a piped system but are provided with improved service, e.g., longer hours of service and/or increased pressure.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
39144-013: Tsunami-Affected Areas Rebuilding Project
Project 2167 4/14/2005 1/31/2011 Successful 45,146
38111-023/36601-013: North East Community Restoration and Development Project
Project 2084/2168/2618 2004 2/9/2009 Successful 8,154
37245-013: Conflict-Affected Area Rehabilitation Project
Project 2043 12/11/2003 12/13/2011 Successful 3,272

* Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12-24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Households with new or improved water supply, Rural between 2010-2013: 56,572

All additional households that benefit from projects offering piped or non-piped water supply systems that are of a higher order than the system that the households used before (non-piped supply may include standpipes), and households that are already connected to a piped system but are provided with improved service, e.g., longer hours of service and/or increased pressure.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
39144-013: Tsunami-Affected Areas Rebuilding Project
Project 2167 4/14/2005 1/31/2011 Successful 45,146
38111-023/36601-013: North East Community Restoration and Development Project
Project 2084/2168/2618 2004 2/9/2009 Successful 8,154
37245-013: Conflict-Affected Area Rehabilitation Project
Project 2043 12/11/2003 12/13/2011 Successful 3,272

* Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12-24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Households with new or improved sanitation between 2010-2013: 5,018

All additional households that benefit from projects offering a variety of sanitation systems to households that either did not benefit from sanitation systems before or benefit from systems of lesser order, and households that are already benefiting from sanitation services but are provided with improved service, e.g., sewer connection, septic tank, pour-flush, simple pit latrine, or ventilated improved pit latrine.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
37245-013: Conflict-Affected Area Rehabilitation Project
Project 2043 12/11/2003 12/13/2011 Successful 3,272
34023: Plantation Development Project
Project 1913 9/13/2002 2/22/2010 Successful 873
34023: Plantation Development Project
Project 1914 9/13/2002 11/26/2009 Successful 873

* Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12-24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Land improved through irrigation, drainage and/or flood management between 2010-2013: 3,279 hectares

Rural land area improved through any new or improved: (i) irrigation, (ii) drainage services, and (iii) flood management works.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
37245-013: Conflict-Affected Area Rehabilitation Project
Project 2043 12/11/2003 12/13/2011 Successful 3,279

* Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12-24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Finance

Microfinance loan accounts opened / end borrowers reached between 2010-2013: 129,897

The number of end borrowers; or, if not available, the number or estimate of microfinance loan accounts opened (regardless of amount in currency) over the course of the project. All those reached by microfinance lending or saving group activities of the project are counted, including participants in self-help groups. The definition of microfinance follows country conventions.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
39144-013: Tsunami-Affected Areas Rebuilding Project
Project 2167 4/14/2005 1/31/2011 Successful 15,550
36357-01/03: Financial Markets Program for Private Sector Development (Program Loan)
Program 2138/2139 12/15/2004 10/28/2010 Successful 100,991
38111-023/36601-013: North East Community Restoration and Development Project
Project 2084/2168/2618 2004 2/9/2009 Successful 5,773
33249-013: North East Coastal Community Development Project
Project 2027 11/28/2003 1/24/2012 Successful 7,583

* Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12-24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Microfinance loan accounts opened / end borrowers reached between 2010-2013: 77,833 Female, number

The number of end borrowers; or, if not available, the number or estimate of microfinance loan accounts opened (regardless of amount in currency) over the course of the project. All those reached by microfinance lending or saving group activities of the project are counted, including participants in self-help groups. The definition of microfinance follows country conventions.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
39144-013: Tsunami-Affected Areas Rebuilding Project
Project 2167 4/14/2005 1/31/2011 Successful 12,450
36357-01/03: Financial Markets Program for Private Sector Development (Program Loan)
Program 2138/2139 12/15/2004 10/28/2010 Successful 53,525
38111-023/36601-013: North East Community Restoration and Development Project
Project 2084/2168/2618 2004 2/9/2009 Successful 5,273
33249-013: North East Coastal Community Development Project
Project 2027 11/28/2003 1/24/2012 Successful 6,585

* Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12-24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Microfinance loan accounts opened / end borrowers reached between 2010-2013: 52,064 Male, number

The number of end borrowers; or, if not available, the number or estimate of microfinance loan accounts opened (regardless of amount in currency) over the course of the project. All those reached by microfinance lending or saving group activities of the project are counted, including participants in self-help groups. The definition of microfinance follows country conventions.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
39144-013: Tsunami-Affected Areas Rebuilding Project
Project 2167 4/14/2005 1/31/2011 Successful 3,100
36357-01/03: Financial Markets Program for Private Sector Development (Program Loan)
Program 2138/2139 12/15/2004 10/28/2010 Successful 47,466
38111-023/36601-013: North East Community Restoration and Development Project
Project 2084/2168/2618 2004 2/9/2009 Successful 500
33249-013: North East Coastal Community Development Project
Project 2027 11/28/2003 1/24/2012 Successful 998

* Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12-24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Small and medium-sized enterprise loan accounts opened or end borrowers reached between 2010-2013: 9,441

Preferably number of end borrowers, but if not available, the number of small and medium-sized enterprise (SME) loan accounts opened (regardless of amount) over the course of the project. The calculation does not include equity operations for SMEs. The definition of SMEs follows the definition generally used in the country of the project.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
41932-014: People's Leasing Company Limited
Investment/Loan 7269/2369 11/23/2007 not available Successful 1,477
36117-013: Small and Medium Enterprise Regional Development Project
Project 2381 2007 8/15/2012 Successful 966
34023: Plantation Development Project
Project 1913 9/13/2002 2/22/2010 Successful 8
34023: Plantation Development Project
Project 1914 9/13/2002 11/26/2009 Successful 8
34318: Aquatic Resource Development and Quality Improvement Project
Project 1910 9/5/2002 not available Successful 121
33246: Small and Medium Enterprise Sector Development Program
Program 1894 12/20/2001 4/18/2005 Less successful 2,020
31282: Southern Province Rural Economic Advancement Project
Project 1849 10/26/2001 12/31/2009 Less successful 4,841

* Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12-24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Education

Students benefiting from new or improved educational facilities between 2010-2013: 2,830,141

Total number of students benefiting from new or upgraded physical educational facilities.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
35192-013: Secondary Education Modernization Project II
Project 2096 10/25/2004 12/14/2011 Successful 2,715,963
38111-023/36601-013: North East Community Restoration and Development Project
Project 2084/2168/2618 2004 2/9/2009 Successful 83,823
33251: Distance Education Modernization Project
Project 1999 6/11/2003 7/28/2010 Less successful 30,355

* Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12-24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Female students benefiting from new or improved educational facilities between 2010-2013: 1,442,628

Total number of female students benefiting from new or upgraded physical educational facilities.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
35192-013: Secondary Education Modernization Project II
Project 2096 10/25/2004 12/14/2011 Successful 1,379,709
38111-023/36601-013: North East Community Restoration and Development Project
Project 2084/2168/2618 2004 2/9/2009 Successful 45,151
33251: Distance Education Modernization Project
Project 1999 6/11/2003 7/28/2010 Less successful 17,768

* Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12-24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Male students benefiting from new or improved educational facilities between 2010-2013: 1,387,513

Total number of male students benefiting from new or upgraded physical educational facilities.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
35192-013: Secondary Education Modernization Project II
Project 2096 10/25/2004 12/14/2011 Successful 1,336,254
38111-023/36601-013: North East Community Restoration and Development Project
Project 2084/2168/2618 2004 2/9/2009 Successful 38,672
33251: Distance Education Modernization Project
Project 1999 6/11/2003 7/28/2010 Less successful 12,587

* Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12-24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Students educated and trained under improved quality assurance systems between 2010-2013: 143,473

Total number of students benefiting from improved quality assurance systems under the projects.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
35192-013: Secondary Education Modernization Project II
Project 2096 10/25/2004 12/14/2011 Successful 143,473

* Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12-24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Female students educated and trained under improved quality assurance systems between 2010-2013: 72,884

Total number of female students benefiting from improved quality assurance systems under the projects.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
35192-013: Secondary Education Modernization Project II
Project 2096 10/25/2004 12/14/2011 Successful 72,884

* Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12-24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Male students educated and trained under improved quality assurance systems between 2010-2013: 70,589

Total number of male students benefiting from improved quality assurance systems under the projects.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
35192-013: Secondary Education Modernization Project II
Project 2096 10/25/2004 12/14/2011 Successful 70,589

* Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12-24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Teacher trained with quality or competency standards between 2010-2013: 32,518

Number of teachers trained who are likely to improve teaching practices and support improvements in curriculum, textbooks, or pedagogy.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
35192-013: Secondary Education Modernization Project II
Project 2096 10/25/2004 12/14/2011 Successful 26,000
38111-023/36601-013: North East Community Restoration and Development Project
Project 2084/2168/2618 2004 2/9/2009 Successful 6,500
33251: Distance Education Modernization Project
Project 1999 6/11/2003 7/28/2010 Less successful 18

* Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12-24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Female teacher trained with quality or competency standards between 2010-2013: 20,805

Number of female teachers trained who are likely to improve teaching practices and support improvements in curriculum, textbooks, or pedagogy.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
35192-013: Secondary Education Modernization Project II
Project 2096 10/25/2004 12/14/2011 Successful 20,800
33251: Distance Education Modernization Project
Project 1999 6/11/2003 7/28/2010 Less successful 5

* Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12-24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

Male teacher trained with quality or competency standards between 2010-2013: 5,213

Number of male teachers trained who are likely to improve teaching practices and support improvements in curriculum, textbooks, or pedagogy.

Contributing ADB Projects

Type of Assistance Approval Number Approval Date Closing Date Success Rating* Output
35192-013: Secondary Education Modernization Project II
Project 2096 10/25/2004 12/14/2011 Successful 5,200
33251: Distance Education Modernization Project
Project 1999 6/11/2003 7/28/2010 Less successful 13

* Ratings are based on project completion reports (PCRs) issued in 2010-2013. These ratings are updated when project completion report validation and/or project/program performance evaluation reports become available. As the PCR for each project is usually prepared 12-24 months after project completion, the figures may include information from projects completed earlier than 2010.
NOTE: Links open in a new window.

The table includes projects completed during the period, and funded by ADB's ordinary capital resources and/or the Asian Development Fund, cofinanciers, and the government. The outputs presented are limited to ADB's core sectors, as defined under Strategy 2020 and tracked through indicators in the ADB Results Framework. ADB monitors progress on these outputs in the annual Development Effectiveness Review. The numbers represent the sum of outputs and beneficiaries of individual projects. Therefore, the beneficiary numbers reported under education—teachers trained, and students benefitting from school improvement programs or direct support—include those who benefited from more than one project.

Source: ADB project completion reports