- About ADB
- News & Events
- Data & Research
- Publications
-
Focus Areas
-
Sectors
- Agriculture
- Education
- Energy
- Finance
- Health
- Industry and Trade
- Information and Communication Technology
- Public Sector Management
- Social Protection
- Transport
- Water
-
- Projects
-
Countries
-
Subregional Programs
- Brunei Darussalam-Indonesia-Malaysia-Philippines East ASEAN Growth Area (BIMP-EAGA)
- Central Asia Regional Economic Cooperation (CAREC)
- Greater Mekong Subregion (GMS)
- Indonesia-Malaysia-Thailand Growth Triangle (IMT-GT)
- South Asia Subregional Economic Cooperation (SASEC)
-
Other Offices
- European Representative Office
- Japanese Representative Office
- North American Representative Office
- Pacific Liaison and Coordination Office
- Pacific Subregional Office
-
Countries with Operations
- Afghanistan
- Armenia
- Azerbaijan
- Bangladesh
- Bhutan
- Cambodia
- China, People's Republic of
- Cook Islands
- Fiji
- Georgia
- India
- Indonesia
- Kazakhstan
- Kiribati
-
- Countries and Regions
- Sri Lanka
- Sri Lanka: Results of ADB-supported Operations
Results of ADB-supported Operations: Sri Lanka
The partnership between Sri Lanka and ADB started in 1986. Since then, ADB has helped the country to improve its transport, education, power, and water supply and sanitation systems. Sustained and uninterrupted ADB engagement in these key sectors helped Sri Lanka to enhance service delivery to the country’s population.
In education, policy changes have been achieved and innovations introduced. The country’s road network has been upgraded and extended. In the water sector, two million people were provided access to safe water, institutional capacity was developed, and reforms were introduced. The country’s rural electrification grid and transmission and distribution systems have also been expanded. ADB’s post-conflict assistance has yielded tangible results.
This country brief summarizes how the partnership between the Government of Sri Lanka and ADB has contributed to the development of the country.
Results of ADB-Supported Operations in Sri Lanka, 2004-2011
As of 31 December 2011 Download Excel file
| Sector | Results Achieved |
|---|---|
| Education | |
| Classrooms built or upgraded (number) | 15,051 |
| Teachers trained (number) | 77,782 |
| Students benefiting from school improvement programs or direct support (number) | 1,886,540 |
| Energy | |
| Installed energy generation capacity (megawatt equivalent) | 163 |
| Transmission lines installed or upgraded (kilometers) | 7,847 |
| Distribution lines installed or upgraded (kilometers) | 9,888 |
| New households connected to electricity (number) | 274,934 |
| Greenhouse gas emission reduction (tons of carbon dioxide equivalent per year) | 121,063 |
| Finance | |
| Microfinance loan accounts opened / end borrowers reached (number) | 110,193 |
| Small and medium-sized enterprise loan accounts opened or end borrowers reached (number) | 12,795 |
| Transport | |
| National highways and provincial, district, and rural roads built or upgraded (kilometers) | 7,802 |
| Beneficiaries from road projects (number) | 14,816,000 |
| Water | |
| Water supply pipes installed or upgraded: length of network (kilometers) | 468 |
| New households served with water supply (number) | 311,359 |
| New households served with sanitation (number) | 84,239 |
| Land improved through irrigation services, drainage, and flood management (hectares) | 14,982 |
|
The table includes operations completed during the period, and funded by ADB's ordinary capital resources, special fund resources, which include the Asian Development Fund and other special funds, cofinanciers, and the government. The results presented are limited to ADB's core sectors, as defined under Strategy 2020 and tracked through indicators in the ADB Results Framework. ADB monitors results achievement in the annual Development Effectiveness Review. The numbers represent the sum of outputs and beneficiaries of individual projects. Therefore, the beneficiary numbers reported under education—teachers trained, and students benefitting from school improvement programs or direct support—include those who benefited from more than one project. Source: ADB project completion reports |
|
Classrooms built or upgraded between 2004-2011: 15,051
Classrooms cover (i) classrooms; (ii) laboratory rooms, including those for science, computers, and languages; (iii) lecture halls; (iv) libraries and workshop facilities; (v) auditoriums; and (vi) sports facilities, which may include gyms, and basketball and volleyball courts.
| Project Name | Type of Assistance | Approval Number | Approval Date | Closing Date | Success Rating at Completion* | Contribution to Output |
|---|---|---|---|---|---|---|
| 33251-013: Distance Education Modernization Project | 1999 | 11-Jun-03 | 28-Jul-10 | Partly successful | 55 | |
| 34023-013: Plantation Development Project | 1914 | 13-Sep-02 | 26-Nov-09 | Successful | 10 | |
| 34023-013: Plantation Development Project | 1913 | 13-Sep-02 | 22-Feb-10 | Successful | 10 | |
| 34442-013: North East Community Restoration and Development Project | 1846 | 16-Oct-01 | 09-Feb-09 | Successful | 1,486 | |
| 33245-013: Secondary Education Modernization Project | 1756 | 12-Sep-00 | 05-Oct-07 | Successful | 13,283 | |
| 31283-013: Skills Development Project | 1707 | 28-Oct-99 | 31-Jan-07 | Successful | 207 | |
|
*The above table reflects project ratings from project completion reports. These ratings are updated with those from the project completion report validation reports and/or project/program performance evaluation reports when these reports become available. NOTE: Links open in a new window. |
||||||
Teachers trained between 2004-2011: 77,782
The number of teachers or professors trained over the duration of the project as a result of the project, both pre-service in order to become teachers; and in-service, for teachers to acquire or improve their teaching capacity. Teachers refer to those employed in formal primary, secondary, and tertiary education.
| Project Name | Type of Assistance | Approval Number | Approval Date | Closing Date | Success Rating at Completion* | Contribution to Output |
|---|---|---|---|---|---|---|
| 33251-013: Distance Education Modernization Project | 1999 | 11-Jun-03 | 28-Jul-10 | Partly successful | 1,003 | |
| 33245-013: Secondary Education Modernization Project | 1756 | 12-Sep-00 | 05-Oct-07 | Successful | 64,472 | |
| 31283-013: Skills Development Project | 1707 | 28-Oct-99 | 31-Jan-07 | Successful | 12,307 | |
|
*The above table reflects project ratings from project completion reports. These ratings are updated with those from the project completion report validation reports and/or project/program performance evaluation reports when these reports become available. NOTE: Links open in a new window. |
||||||
Students benefiting from school improvement programs or direct support between 2004-2011: 1,886,540
Students benefiting from (i) school improvement programs (at the end of the project); or (ii) having received direct support through scholarships, feeding, or similar programs (total number over the duration of the project). School improvement programs include civil works and provision of equipment or furniture.
| Project Name | Type of Assistance | Approval Number | Approval Date | Closing Date | Success Rating at Completion* | Contribution to Output |
|---|---|---|---|---|---|---|
| 33251-013: Distance Education Modernization Project | 1999 | 11-Jun-03 | 28-Jul-10 | Partly successful | 11,878 | |
| 34442-013: North East Community Restoration and Development Project | 1846 | 16-Oct-01 | 09-Feb-09 | Successful | 179,000 | |
| 33245-013: Secondary Education Modernization Project | 1756 | 12-Sep-00 | 05-Oct-07 | Successful | 1,630,000 | |
| 31283-013: Skills Development Project | 1707 | 28-Oct-99 | 31-Jan-07 | Successful | 57,260 | |
| 27038: Science & Technology Personnel Development Project | 1535 | 11-Sep-97 | 22-Sep-05 | Highly successful / successful | 8,402 | |
|
*The above table reflects project ratings from project completion reports. These ratings are updated with those from the project completion report validation reports and/or project/program performance evaluation reports when these reports become available. NOTE: Links open in a new window. |
||||||
Installed energy generation capacity between 2004-2011: 163 megawatt equivalent
The indicator, given in megawatt (MW) equivalent is the total incremental generating capacity of a generation project. This may be power sourced from renewable technology or from conventional sources e.g., oil, coal, or large hydro. A project may involve construction of a new power plant or simply acquisition of an asset, e.g., the private sector acquiring a government-owned coal plant. This includes the MW-equivalent capacity of additional heating supply as well as hydrocarbon-based energy added through production or additional import capacity. Energy export is excluded from Level 2 measurement as it does not add to the energy resources of a country.
| Project Name | Type of Assistance | Approval Number | Approval Date | Closing Date | Success Rating at Completion* | Contribution to Output |
|---|---|---|---|---|---|---|
| 34912-014: AES Kelantissa Review Report | 7167/1815 | 01-Dec-00 | 15-Jun-01 | Partly successful | 163 | |
|
*The above table reflects project ratings from project completion reports. These ratings are updated with those from the project completion report validation reports and/or project/program performance evaluation reports when these reports become available. NOTE: Links open in a new window. |
||||||
Transmission lines installed or upgraded between 2004-2011: 7,847 kilometers
The indicator covers power, gas, and oil transmission lines. It is the measure of the ground distance, in kilometers, traversed by the transmission line. For power transmission lines, we are looking for the simple distance from tower A to tower B and not the circuit-kilometers.
| Project Name | Type of Assistance | Approval Number | Approval Date | Closing Date | Success Rating at Completion* | Contribution to Output |
|---|---|---|---|---|---|---|
| 30207: Power Sector Development Program | 1929/1930 | 31-Oct-02 | 12-May-10 | Partly successful | 7,830 | |
| 25388: Second Power System Expansion Sector Project | 1414 | 14-Dec-95 | 20-Aug-03 | Highly successful / successful | 17 | |
| *The above table reflects project ratings from project completion reports. These ratings are updated with those from the project completion report validation reports and/or project/program performance evaluation reports when these reports become available. | ||||||
Distribution lines installed or upgraded between 2004-2011: 9,888 kilometers
"Distribution lines installed or upgraded" is the aggregate of the following three sub-indicators: (i) km of power distribution lines installed or upgraded, generally at 110 kv or lower); (ii) km of district heating network pipes installed or upgraded; and (iii) km of urban gas supply network pipes installed or upgraded.
| Project Name | Type of Assistance | Approval Number | Approval Date | Closing Date | Success Rating at Completion* | Contribution to Output |
|---|---|---|---|---|---|---|
| 30207: Power Sector Development Program | 1929/1930 | 31-Oct-02 | 12-May-10 | Partly successful | 380 | |
| 25388: Second Power System Expansion Sector Project | 1414 | 14-Dec-95 | 20-Aug-03 | Highly successful / successful | 9,508 | |
| *The above table reflects project ratings from project completion reports. These ratings are updated with those from the project completion report validation reports and/or project/program performance evaluation reports when these reports become available. | ||||||
New households connected to electricity between 2004-2011: 274,934
The indicator is the number of new households connected to the grid. Only new household connections resulting from a project are counted; households already connected to the grid and receiving improved services through a project are not counted. The number of new household connections resulting from a project is counted in total and not proportional to the ADB funding component only. The guiding principle is that ADB assistance is integral to the completion of the entire project; without the ADB assistance, the total target household connections would not be attained.
| Project Name | Type of Assistance | Approval Number | Approval Date | Closing Date | Success Rating at Completion* | Contribution to Output |
|---|---|---|---|---|---|---|
| 30207: Power Sector Development Program | 1929/1930 | 31-Oct-02 | 12-May-10 | Partly successful | 144,934 | |
| 25388: Second Power System Expansion Sector Project | 1414 | 14-Dec-95 | 20-Aug-03 | Highly successful / successful | 130,000 | |
| *The above table reflects project ratings from project completion reports. These ratings are updated with those from the project completion report validation reports and/or project/program performance evaluation reports when these reports become available. | ||||||
Greenhouse gas emission reduction between 2004-2011: 121,063 tons of carbon dioxide equivalent per year
A proxy emission factor is to be used for developing Asia (countries where ADB may implement projects), which is 793.73 tons of carbon dioxide (CO2) per gigawatt-hour (GWh). This proxy factor is to be used to calculate emission reduction/ avoidance accruing from the projects, i.e., GWh generated using renewable energy, and GWh saved through efficiency improvement.
| Project Name | Type of Assistance | Approval Number | Approval Date | Closing Date | Success Rating at Completion* | Contribution to Output |
|---|---|---|---|---|---|---|
| 25388: Second Power System Expansion Sector Project | 1414 | 14-Dec-95 | 20-Aug-03 | Highly successful / successful | 121,063 | |
| *The above table reflects project ratings from project completion reports. These ratings are updated with those from the project completion report validation reports and/or project/program performance evaluation reports when these reports become available. | ||||||
Microfinance loan accounts opened / end borrowers reached between 2004-2011: 110,193
All those reached by microfinance lending or saving group activities of the project will be counted, including participants in self-help groups.
| Project Name | Type of Assistance | Approval Number | Approval Date | Closing Date | Success Rating at Completion* | Contribution to Output |
|---|---|---|---|---|---|---|
| 36357-013: Financial Markets Program for Private Sector Development (Program Loan) | 2138/2139 | 15-Dec-04 | 28-Oct-10 | Successful | 100,991 | |
| 21106: Southern Province Rural Development Project | 1128 | 26-Nov-91 | 09-Feb-01 | Partly successful | 9,202 | |
|
*The above table reflects project ratings from project completion reports. These ratings are updated with those from the project completion report validation reports and/or project/program performance evaluation reports when these reports become available. NOTE: Links open in a new window. |
||||||
Small and medium-sized enterprise loan accounts opened or end borrowers reached between 2004-2011: 12,795
The definition of SME follows the definition as generally used in the country of the project.
| Project Name | Type of Assistance | Approval Number | Approval Date | Closing Date | Success Rating at Completion* | Contribution to Output |
|---|---|---|---|---|---|---|
| 34023-013: Plantation Development Project | 1914 | 13-Sep-02 | 26-Nov-09 | Successful | 8 | |
| 34023-013: Plantation Development Project | 1913 | 13-Sep-02 | 22-Feb-10 | Successful | 8 | |
| 34318-013: Aquatic Resource Development and Quality Improvement Project | 1910 | 05-Sep-02 | Ongoing | Successful | 121 | |
| 33246-013: Small and Medium Enterprise Sector Development Program | 1894 | 20-Dec-01 | 18-Apr-05 | Partly successful | 2,020 | |
| 31282-013: Southern Province Rural Economic Advancement Project | 1849 | 26-Oct-01 | 31-Dec-09 | Successful | 4,841 | |
| 29601: 2nd Perennial Crops Development Project | 1552 | 25-Sep-97 | 10-Apr-07 | Successful | 4,586 | |
| 27186: North Central Province Rural Development Project | 1462 | 24-Sep-96 | 13-Dec-05 | Partly successful | 1,108 | |
| 21106: Southern Province Rural Development Project | 1128 | 26-Nov-91 | 09-Feb-01 | Partly successful | 103 | |
|
*The above table reflects project ratings from project completion reports. These ratings are updated with those from the project completion report validation reports and/or project/program performance evaluation reports when these reports become available. NOTE: Links open in a new window. |
||||||
National highways and provincial, district, and rural roads built or upgraded between 2004-2011: 7,802 kilometers
Length of open access road networks built or upgraded in km (without full access control). "Upgrading" includes all activity to restore a degraded road to originally intended design capacity (repair/rehabilitation) and to improve on its design capacity (e.g. by widening). Upgrading does not cover road signage (only).
| Project Name | Type of Assistance | Approval Number | Approval Date | Closing Date | Success Rating at Completion* | Contribution to Output |
|---|---|---|---|---|---|---|
| 31280-013: Road Sector Development Project | 1986 | 19-Dec-02 | 14-May-09 | Partly successful | 770 | |
| 34023-013: Plantation Development Project | 1914 | 13-Sep-02 | 26-Nov-09 | Successful | 260 | |
| 34023-013: Plantation Development Project | 1913 | 13-Sep-02 | 22-Feb-10 | Successful | 260 | |
| 31282-013: Southern Province Rural Economic Advancement Project | 1849 | 26-Oct-01 | 31-Dec-09 | Successful | 933 | |
| 34442-013: North East Community Restoration and Development Project | 1846 | 16-Oct-01 | 09-Feb-09 | Successful | 394 | |
| 28331-013: Road Network Improvement Project | 1649 | 08-Dec-98 | 31-Dec-08 | Successful | 759 | |
| 29600-013: Tea Development Project | 1639 | 10-Nov-98 | 10-Apr-07 | Partly successful | 652 | |
| 28163-013: Urban Development & Low Income Housing (Section) Project | 1632 | 24-Sep-98 | 26-Dec-07 | Partly successful | 137 | |
| 31056: Southern Provincial Roads Improvement Project | 1567 | 30-Nov-97 | 27-Oct-05 | Highly successful / successful | 611 | |
| 27186: North Central Province Rural Development Project | 1462 | 24-Sep-96 | 13-Dec-05 | Partly successful | 640 | |
| 26238: Plantation Reform Project (Part A - Credit Component) | 1402 | 11-Sep-95 | 22-Nov-04 | Highly successful / successful | 1,426 | |
| 20224: Third Road Improvement Project | 1312 | 15-Sep-94 | 03-Feb-05 | Highly successful / successful | 240 | |
| 21106: Southern Province Rural Development Project | 1128 | 26-Nov-91 | 09-Feb-01 | Partly successful | 720 | |
|
*The above table reflects project ratings from project completion reports. These ratings are updated with those from the project completion report validation reports and/or project/program performance evaluation reports when these reports become available. NOTE: Links open in a new window. |
||||||
Beneficiaries from road projects between 2004-2011: 14,816,000
Includes all beneficiaries defined by reports and recommendations of the President or project completion reports as beneficiaries of roads constructed or upgraded; generally those in the vicinity of the road or in the project area. Beneficiaries of railway projects are not included.
| Project Name | Type of Assistance | Approval Number | Approval Date | Closing Date | Success Rating at Completion* | Contribution to Output |
|---|---|---|---|---|---|---|
| 31280-013: Road Sector Development Project | 1986 | 19-Dec-02 | 14-May-09 | Partly successful | 845,000 | |
| 34023-013: Plantation Development Project | 1914 | 13-Sep-02 | 26-Nov-09 | Successful | 360,000 | |
| 34023-013: Plantation Development Project | 1913 | 13-Sep-02 | 22-Feb-10 | Successful | 360,000 | |
| 31282-013: Southern Province Rural Economic Advancement Project | 1849 | 26-Oct-01 | 31-Dec-09 | Successful | 2,400,000 | |
| 34442-013: North East Community Restoration and Development Project | 1846 | 16-Oct-01 | 09-Feb-09 | Successful | 285,000 | |
| 28331-013: Road Network Improvement Project | 1649 | 08-Dec-98 | 31-Dec-08 | Successful | 2,500,000 | |
| 29600-013: Tea Development Project | 1639 | 10-Nov-98 | 10-Apr-07 | Partly successful | 126,000 | |
| 28163-013: Urban Development & Low Income Housing (Section) Project | 1632 | 24-Sep-98 | 26-Dec-07 | Partly successful | 800,000 | |
| 31056: Southern Provincial Roads Improvement Project | 1567 | 30-Nov-97 | 27-Oct-05 | Highly successful / successful | 2,500,000 | |
| 27186: North Central Province Rural Development Project | 1462 | 24-Sep-96 | 13-Dec-05 | Partly successful | 200,000 | |
| 26238: Plantation Reform Project (Part A - Credit Component) | 1402 | 11-Sep-95 | 22-Nov-04 | Highly successful / successful | 110,000 | |
| 20224: Third Road Improvement Project | 1312 | 15-Sep-94 | 03-Feb-05 | Highly successful / successful | 4,000,000 | |
| 21106: Southern Province Rural Development Project | 1128 | 26-Nov-91 | 09-Feb-01 | Partly successful | 330,000 | |
|
*The above table reflects project ratings from project completion reports. These ratings are updated with those from the project completion report validation reports and/or project/program performance evaluation reports when these reports become available. NOTE: Links open in a new window. |
||||||
Water supply pipes installed or upgraded: length of network between 2004-2011: 468 kilometers
All sizes of pipes intended to transport water for urban water use for domestic and (non agricultural) business purposes, expressed in their aggregate length in the network, irrespective of pipe diameter, comprising mains as well as reticulation pipes. Both new and repaired/upgraded pipes are aggregated and they are not distinguished through subindicators.
| Project Name | Type of Assistance | Approval Number | Approval Date | Closing Date | Success Rating at Completion* | Contribution to Output |
|---|---|---|---|---|---|---|
| 28163-013: Urban Development & Low Income Housing (Section) Project | 1632 | 24-Sep-98 | 26-Dec-07 | Partly successful | 168 | |
| 28153-023: Third Water Supply and Sanitation Sector Project | 1575 | 06-Nov-97 | 19-Aug-08 | Successful | 300 | |
|
*The above table reflects project ratings from project completion reports. These ratings are updated with those from the project completion report validation reports and/or project/program performance evaluation reports when these reports become available. NOTE: Links open in a new window. |
||||||
New households served with water supply between 2004-2011: 311,359
This refers to all additional households that benefit from projects that offer piped or non-piped water supply systems, which is of a higher order than the system that the households used before. Non-piped supply may include standpipes.
| Project Name | Type of Assistance | Approval Number | Approval Date | Closing Date | Success Rating at Completion* | Contribution to Output |
|---|---|---|---|---|---|---|
| 34442-013: North East Community Restoration and Development Project | 1846 | 16-Oct-01 | 09-Feb-09 | Successful | 18,000 | |
| 28153-023: Third Water Supply and Sanitation Sector Project | 1575 | 06-Nov-97 | 19-Aug-08 | Successful | 293,359 | |
|
*The above table reflects project ratings from project completion reports. These ratings are updated with those from the project completion report validation reports and/or project/program performance evaluation reports when these reports become available. NOTE: Links open in a new window. |
||||||
New households served with sanitation between 2004-2011: 84,239
This refers to all additional households that benefit from projects offering a variety of sanitation systems to households that either did not benefit from sanitation systems before, or benefited from systems of lesser order. The situation at the end of the project is to be reflected.
| Project Name | Type of Assistance | Approval Number | Approval Date | Closing Date | Success Rating at Completion* | Contribution to Output |
|---|---|---|---|---|---|---|
| 34023-013: Plantation Development Project | 1914 | 13-Sep-02 | 26-Nov-09 | Successful | 873 | |
| 34023-013: Plantation Development Project | 1913 | 13-Sep-02 | 22-Feb-10 | Successful | 873 | |
| 34442-013: North East Community Restoration and Development Project | 1846 | 16-Oct-01 | 09-Feb-09 | Successful | 897 | |
| 28153-023: Third Water Supply and Sanitation Sector Project | 1575 | 06-Nov-97 | 19-Aug-08 | Successful | 81,596 | |
|
*The above table reflects project ratings from project completion reports. These ratings are updated with those from the project completion report validation reports and/or project/program performance evaluation reports when these reports become available. NOTE: Links open in a new window. |
||||||
Land improved through irrigation services, drainage, and flood management between 2004-2011: 14,982 hectares
The rural land area improved through new/improved irrigation (and drainage) services and/or flood management. This indicator is the aggregate of 2 sub-indicators: (i) land area improved through irrigation (and drainage) services in hectares, and (ii) land area improved through flood management in hectares.
| Project Name | Type of Assistance | Approval Number | Approval Date | Closing Date | Success Rating at Completion* | Contribution to Output |
|---|---|---|---|---|---|---|
| 27186: North Central Province Rural Development Project | 1462 | 24-Sep-96 | 13-Dec-05 | Partly successful | 7,776 | |
| 21106: Southern Province Rural Development Project | 1128 | 26-Nov-91 | 09-Feb-01 | Partly successful | 7,206 | |
| *The above table reflects project ratings from project completion reports. These ratings are updated with those from the project completion report validation reports and/or project/program performance evaluation reports when these reports become available. | ||||||
H.M. Sainambu applies for a household water connection
under the ADB-funded Secondary Towns and Rural Community Based Water Supply and Sanitation Project in Batticaloa