| Date | : | 11 May 2009 |
| Loan No. | : | 2437-AZE: Power Transmission Enhancement Project |
| Contract No. and Title | : | AOJSC/ADB-01-2009: Engineering, Procurement, Construction, and Commissioning of 220 kV Mingechevir - Absheron Transmission Line Project on Turnkey Basis |
| Deadline for Submission for Applications | : | 13 July 2009 at 15:00 pm (Local time) |
1. The Government of Azerbaijan has received a loan from the Asian Development Bank (ADB) towards the cost of the Power Transmission Enhancement Project in the Azerbaijan Republic and it is intended that part of the proceeds of the loan will be utilized to eligible payment under the contract for which this Bidding Document has been issued. Bidding is open to bidders from eligible member countries of ADB.
2. Azerenergy (the executing agency) now invites sealed bids from eligible bidders for the turnkey project "220 kV Mingechevir - Absheron Power Transmission Line Project" including design, engineering, purchase, supply, erection and commissioning. The work mainly comprises of the following components:
3. International competitive bidding will be conducted in accordance with ADB's Single-Stage One-Envelope Bidding Procedure. The Bidder, either as a single entity or joint venture, shall meet all the qualification criteria set forth in the Bidding Documents. A pass-fail method shall be applied in the evaluation of bidder's qualifications.
4. To obtain further information and to inspect the Bidding Documents bidders should contact the following:
Contact Person: Mister Islam Rafibeyli
Academician Abdulkerim Alizade Str.
AZ 1005 Baku, Azerbaijan
Tel. No.: (+994 12) 493 10 89
Email: irafibeyli@mail.ru
5. A pre-bid meeting and site visit will be held at Azerenergy Office and substation ABSHERON on 8 June 2009 at 10:00 am.
6. To purchase the Bidding Documents in English, eligible bidders should:
OR
7. Bids must be delivered in English (original), and also in three copies translation into Azeri:
Bids will be opened immediately after the deadline in the presence of bidders' representatives who choose to attend.
8. Azerenergy will not be responsible for any costs or expenses incurred by the bidders in connection with the preparation or delivery of bids.