- About ADB
- News & Events
- Data & Research
- Publications
-
Focus Areas
-
Sectors
- Agriculture
- Education
- Energy
- Finance
- Health
- Industry and Trade
- Information and Communication Technology
- Public Sector Management
- Social Protection
- Transport
- Water
-
- Projects
-
Countries
-
Subregional Programs
- Brunei Darussalam-Indonesia-Malaysia-Philippines East ASEAN Growth Area (BIMP-EAGA)
- Central Asia Regional Economic Cooperation (CAREC)
- Greater Mekong Subregion (GMS)
- Indonesia-Malaysia-Thailand Growth Triangle (IMT-GT)
- South Asia Subregional Economic Cooperation (SASEC)
-
Other Offices
- European Representative Office
- Japanese Representative Office
- North American Representative Office
- Pacific Liaison and Coordination Office
- Pacific Subregional Office
-
Countries with Operations
- Afghanistan
- Armenia
- Azerbaijan
- Bangladesh
- Bhutan
- Cambodia
- China, People's Republic of
- Cook Islands
- Fiji
- Georgia
- India
- Indonesia
- Kazakhstan
- Kiribati
-
29250-013: Surat Manor Tollway Project
Project Data Sheet (PDS): Overview
Description
The objective of the Project is to remove capacity constraints and improve road safety on National Highway No. 8 (NH8) between Surat and Manor. The Project will comprise (i) widening to four lanes (including strengthening of the existing two-lane pavements) about 180 km of NH8; and (ii) consulting services for construction supervision and for the development of private participation.... Read More
| Country |
India |
|---|---|
| Project Number | 29250-013 |
| Project Type or Modality of Assistance |
Loan |
| Financing | Public sector (Sovereign) |
| Status | |
| Approval Number |
Loan No. 1747 |
| Approval Date | 27 Jul 2000 |
| Closing Date | 13 Jan 2006 |
| Geographical Location | The project will improve about 180 km. of National Highway No. 8 in the states of Gujarat and Maharashtra, between Surat and Manor. |
| Sector / Subsector Classification |
Transport and ICT / Road Transport |
| Thematic Classification | Gender equity |
| Safeguard Categories |
Environment: B |
Results Delivered
| Expressway built or updgraded (kilometers) | 176 |
| Beneficiaries from road projects (number) | 14,000,000 |
The results data reported above are limited to ADB's core sectors, as defined under Strategy 2020 and tracked through indicators in the ADB Results Framework. For definitions of results indicators, please see the ADB Results Framework Indicators Definition.
Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.
The Public Communications Policy (PCP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.
The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.
In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.