29257-013: Stung Chinit Irrigation and Rural Infrastructure Project

Project Data Sheet (PDS): Overview


Description

The primary objectives of the Project are to increase agricultural productivity and farmer incomes, and stimulate the rural economy through the provision of irrigation and drainage for 7,000 ha, and the improvement of rural roads and markets in and around the Project area. Associated with these objectives is the formation and training of water user groups to operate and maintain the irrigation scheme, applying cost recovery measures for roads and irrigation works, strengthening Government staff ... Read More

Country Cambodia
Project Number 29257-013
Project Type or Modality of Assistance Loan
Financing Public sector (Sovereign)
Status Closed
Approval Number Loan No. 1753
Approval Date 05 Sep 2000
Closing Date 04 Dec 2008
ADB Financing ($ thousand) 16,000
Geographical Location Chinit River Basin in Kompong Thom Province
Sector / Subsector Classification Agriculture, natural resources and rural development
/ Agriculture and Natural Resources
Safeguard Categories Environment: B

Results Delivered

National highways and provincial, district, and rural roads built or upgraded (kilometers) 260
Land improved through irrigation services, drainage, and flood management (hectares) 2,960

The results data reported above are limited to ADB's core sectors, as defined under Strategy 2020 and tracked through indicators in the ADB Results Framework. For definitions of results indicators, please see the ADB Results Framework Indicators Definition.

Related Projects

 

 

Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.

The Public Communications Policy (PCP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.

The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.

In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Project Data Sheets (PDS)

Responsible ADB Officer
Piseth Long
Request for information

Responsible ADB Department
Southeast Asia Department

Responsible ADB Divisions
Environment, Natural Resources & Agriculture Division, SERD

Executing Agencies
Ministry of Water Resources and Meteorology

Ministry of Rural Development
*Veng Sakhon

PDS Creation Date
28 Feb 2007

Last PDS Update
29 Apr 2009