Cambodia: Small Scale Technical Assistance for Economic Analysis

Sovereign Project | 30240-022

Latest Project Documents

No documents of this type are currently available for this project.


Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.

The Public Communications Policy (PCP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.

The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.

In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Project Name Small Scale Technical Assistance for Economic Analysis
Project Number 30240-022
Country Cambodia
Project Status Closed
Project Type / Modality of Assistance Technical Assistance
Source of Funding / Amount
TA 3852-CAM: Small Scale Technical Assistance for Economic Analysis
Technical Assistance Special Fund US$ 150,000.00
Strategic Agendas Inclusive economic growth
Drivers of Change
Sector / Subsector Transport - Road transport (non-urban)
Gender Equity and Mainstreaming No gender elements
Description The proposed SSTA will (i) review design criteria set out in earlier studies, (ii) prepare an economically optimal rehabilitation strategy, and (iii) confirm the economic feasibility of the proposed Project. This TA was formally part of PPTA Road Network Improvement II.
Project Rationale and Linkage to Country/Regional Strategy
Impact
Project Outcome
Description of Outcome
Progress Toward Outcome
Implementation Progress
Description of Project Outputs
Status of Implementation Progress (Outputs, Activities, and Issues)
Geographical Location
Summary of Environmental and Social Aspects
Environmental Aspects
Involuntary Resettlement
Indigenous Peoples
Stakeholder Communication, Participation, and Consultation
During Project Design
During Project Implementation
Business Opportunities
Consulting Services The SSTA will be undertaken by individually selected international consultants. A total of 5 person-months of specialists' inputs will be required. The expertise required will include highway engineering and pavement design, bridge engineering and transport economics. The consultants will be engaged by ADB in accordance with ADBs Guidelines on the Use of Consultants.
Procurement Not required.
Responsible ADB Officer Peter Broch
Responsible ADB Department Southeast Asia Department
Responsible ADB Division Infrastructure Division, SERD
Executing Agencies
Ministry of Public Works and TransportMr. Khy Tainglim, Minister1st Floor West Building, Corner Norodom Boulevard Street 106 Phnom Penh, Cambodia
Timetable
Concept Clearance 10 Mar 2002
Fact Finding 28 Jan 2002 to 05 Feb 2002
MRM -
Approval 04 Apr 2002
Last Review Mission -
Last PDS Update 06 Dec 2006

TA 3852-CAM

Milestones
Approval Signing Date Effectivity Date Closing
Original Revised Actual
04 Apr 2002 - 04 Apr 2002 30 Jun 2002 31 Mar 2004 -
Financing Plan/TA Utilization Cumulative Disbursements
ADB Cofinancing Counterpart Total Date Amount
Gov Beneficiaries Project Sponsor Others
150,000.00 0.00 0.00 0.00 0.00 0.00 150,000.00 04 Apr 2002 137,268.28

No documents found.

Safeguard Documents

See also: Safeguards

No documents found.

Evaluation Documents

See also: Independent Evaluation

No documents found.


The Public Communications Policy (PCP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.

Requests for information may also be directed to the InfoUnit.