32912-014: PRC: CHENGDU GENERALE DES EAUX-MARUBENI WATERWORKS COMPANY LIMITED

Project Data Sheet (PDS): Overview


Description

Chengdu Generale des Eaux-Marubeni Waterworks Company Limited (CGEM) is the PRC's first Build-Operate-Transfer (BOT) arrangement under competitive bidding in the water supply industry. The Project involved the design, construction, and operation of Factory B of Chengdu No. 6 Waterworks. The investment consisted of (i) two water intake facilities with a daily combined capacity of 800,000 cubic meters, including interconnected conduit and hidden diversion canals; (ii) a water purifying factory with a capacity of 400,000 cubic meters; (iii) a discharge pipeline of 1,030 meters; and (iv) a 27-kilometer transmission pipeline from the treatment plat to Chengdu's distribution network. An offtake agreement obligates Chengdu Municipal Waterworks General Company (CWGC) to take or pay for 400,000 cubic meters of treated water daily from CGEM. The Chengdu Municipal Government (CMG) guarantees the performance of CWGC's obligations under the offtake agreement. Read More

Country China, People's Republic of
Borrower/Equity Investment Name
Project Number 32912-014
Project Type or Modality of Assistance PS
Financing Private sector (Nonsovereign)
Status Approved
Approval Numbers 7152/1669
Approval Date 11 Feb 1999
Closing Date 10 Aug 2002
Geographical Location Chengdu City/Sichuan Province
Sector / Subsector Classification Water supply and other municipal infrastructure and services
/ Water Supply and Sanitation
Thematic Classification Economic growth
Private sector development
Safeguard Categories Environment: B

Results Delivered

Water supply pipes installed or upgraded: length of network (kilometers) 27

The results data reported above are limited to ADB's core sectors, as defined under Strategy 2020 and tracked through indicators in the ADB Results Framework. For definitions of results indicators, please see the ADB Results Framework Indicators Definition.

 

 

Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.

The Public Communications Policy (PCP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.

The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.

In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Project Data Sheets (PDS)

Responsible ADB Officer
Masayuki Kanda
Email contact

Responsible ADB Department
Private Sector Operations Department

Responsible ADB Divisions
Infrastructure Finance Division 2

PDS Creation Date
28 Aug 2006

Last PDS Update
19 Oct 2010

SEARCH/BROWSE PROJECTS