- About ADB
- News & Events
- Data & Research
- Publications
-
Focus Areas
-
Sectors
- Agriculture
- Education
- Energy
- Finance
- Health
- Industry and Trade
- Information and Communication Technology
- Public Sector Management
- Social Protection
- Transport
- Water
-
- Projects
-
Countries
-
Subregional Programs
- Brunei Darussalam-Indonesia-Malaysia-Philippines East ASEAN Growth Area (BIMP-EAGA)
- Central Asia Regional Economic Cooperation (CAREC)
- Greater Mekong Subregion (GMS)
- Indonesia-Malaysia-Thailand Growth Triangle (IMT-GT)
- South Asia Subregional Economic Cooperation (SASEC)
-
Other Offices
- European Representative Office
- Japanese Representative Office
- North American Representative Office
- Pacific Liaison and Coordination Office
- Pacific Subregional Office
-
Countries with Operations
- Afghanistan
- Armenia
- Azerbaijan
- Bangladesh
- Bhutan
- Cambodia
- China, People's Republic of
- Cook Islands
- Fiji
- Georgia
- India
- Indonesia
- Kazakhstan
- Kiribati
-
33548-013: Urban Water Supply
Project Data Sheet (PDS): Overview
Description
The main objective of the Project is to improve the quality of life and health conditions in the provincial capital cities of Karshi, Djizzak, and Gulistan, where there are high proportions of poor people, through the improvement of basic water supply services. The Project consists of two components: water supply and capacity building. The water supply component will include rehabilitation and upgrading of the water supply systems. The aim is to secure supply, minimize losses, raise supply effic... Read More
| Country |
Uzbekistan |
|---|---|
| Project Number | 33548-013 |
| Project Type or Modality of Assistance |
Loan |
| Financing | Public sector (Sovereign) |
| Status | Closed |
| Approval Number |
Loan No. 1842 |
| Approval Date | 27 Sep 2001 |
| Closing Date | 16 Nov 2010 |
| ADB Financing ($ thousand) | 36,000 |
| Geographical Location | Gulistan, Djizzak and Karshi |
| Sector / Subsector Classification |
Water supply and other municipal infrastructure and services / Water Supply and Sanitation |
| Safeguard Categories |
Environment: B |
Results Delivered
| Water supply pipes installed or upgraded: length of network (kilometers) | 285 |
| New households served with water supply (number) | 107,800 |
The results data reported above are limited to ADB's core sectors, as defined under Strategy 2020 and tracked through indicators in the ADB Results Framework. For definitions of results indicators, please see the ADB Results Framework Indicators Definition.
Related Projects
Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.
The Public Communications Policy (PCP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.
The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.
In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
Responsible ADB Officer
Amy S.P. Leung
Email contact form
Responsible ADB Department
Central and West Asia Department
Responsible ADB Divisions
Urban Development and Water Division, CWRD
Executing Agencies
Uzbekistan Communal Services Agency
Mr. Jahangir Israilov
PDS Creation Date
11 Dec 2006
Last PDS Update
08 Apr 2010