Pakistan: Power Distribution Enhancement Investment Program - Tranche 3

Sovereign Project | 38456-034

Summary

ADB is helping Pakistan to improve its power distribution system. The project will alleviate the power distribution system bottlenecks and reduce outages and load shedding by upgrading the secondary transmission grid and transmission lines.

Latest Project Documents

Consulting Notices

See also: CMS

No notices are currently available for this project.

Procurement Notices

See also: Operational Procurement

Procurement Documents


Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.

The Public Communications Policy (PCP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.

The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.

In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Project Name Power Distribution Enhancement Investment Program - Tranche 3
Project Number 38456-034
Country Pakistan
Project Status Approved
Project Type / Modality of Assistance Loan
Source of Funding / Amount
Loan 2972-PAK: Power Distribution Enhancement Investment Program - Tranche 3
Ordinary capital resources US$ 245.00 million
Strategic Agendas Inclusive economic growth
Drivers of Change
Sector / Subsector

Energy - Electricity transmission and distribution

Gender Equity and Mainstreaming No gender elements
Description

The project proposed for financing under the requested PFR are:

1. Secondary Transmission Grid (STG)

a. Augmentation replacement of power transformers with higher capacity transformer;

b. Extension addition of power transformers;

c. Conversion of existing 66-kV substations to 132-kV substations with enhanced transformation and current carrying capacity; and

d. Addition of new 132-kV grid station.

2. STG transmission lines:

a. Conversion of existing 66-kV transmission lines to 132-kV transmission lines;

b. Replacement of existing transmission lines to increase load carrying capacity; and

c. Extension addition of transmission lines.

Project Rationale and Linkage to Country/Regional Strategy The project is urgently needed to further alleviate the power distribution system bottlenecks and to reduce prolonged outages and load shedding.
Impact Reliable and quality power supplied and service coverage expanded
Project Outcome
Description of Outcome Power distribution systems rehabilitated, augmented and expanded
Progress Toward Outcome --The bidding has already been started and most of the packages have been tendered. Implementation is ongoing.
Implementation Progress
Description of Project Outputs Subprojects commissioned
Status of Implementation Progress (Outputs, Activities, and Issues) --Bidding/contract award in progress. Implementation ongoing.
Geographical Location The Project will be in Faisalabad, Gujranwala, Hyderabad, Islamabad, Lahore, Multan, Peshawar, and Quetta
Safeguard Categories
Environment B
Involuntary Resettlement B
Indigenous Peoples C
Summary of Environmental and Social Aspects
Environmental Aspects The project is classified as "B" for environmental safeguards. The Government will cause each DISCO to ensure that (i) the subprojects are designed, constructed, operated, and maintained in accordance with all applicable laws and regulations of Pakistan and ADB's Environment Policy (ADB's Safeguard Policy Statement for subprojects initiated after June 2009); (ii) all subprojects will strictly follow the mitigation measures identified in the IEE, including the EMPs and the EARF; (iii) mitigation measures identified in the EMPs will be incorporated in bidding documents and civil work contracts and implemented under supervision of the DISCOs; and (iv) environmental monitoring reports will be submitted to ADB twice annually during the construction and operation period, including progress made on the mitigation measures, monitoring data, problems encountered, enforcement plan, complaints, violation, or modifications to mitigation measures to take account of unexpected environmental impacts and the acceptability of the residual impact.
Involuntary Resettlement The project is classified as "B" for resettlement. Land Acquisition and Resettlement. Medium/low voltage lines up to 11 kV causing LAR or income impacts will not be eligible for financing under the MFF. However, lines at voltages of 33 kV and above and substation subprojects causing LAR or income impacts will be fully eligible for financing under the MFF. In the case of these subprojects, the Government will cause each DISCO to ensure that (i) all land and rights-of-way required by the subprojects are made available in a timely manner; (ii) the provisions of the relevant LARP are implemented promptly and efficiently according to its terms, applicable laws and regulations of Pakistan, ADB's Policy on Involuntary Resettlement (ADB's Safeguard Policy Statement for subprojects initiated after June 2009); ADB's Operations Manual F2 on Involuntary Resettlement (2003), and the LARP; (iii) the relevant LARP is updated based on the detailed design, prepared in full consultation with the affected persons and disclosed to them prior to submitting the LARP to ADB; (iv) the contractors' activities are in compliance with requirements of the relevant LARP and the LARF, and (v) an independent monitor acceptable to ADB is engaged to carry out monitoring and evaluation and report to ADB in accordance with the requirements of the LARPs. The signing of civl work contracts or a similar milestone will be subject to ADB review and approval of implementation of the relevant LARPs, including the provision of full compensation to the affected people.
Indigenous Peoples The project is classified as "C" for indigenous people. The government will cause each DISCO to ensure that all subprojects affecting trial peoples are constructed and operated in accordance with the requirements of ADB's Policy on Indigenous Peoples (ADB's Safeguard Policy Statement for subprojects initiated after June 2009) as specified in the IPDPs agreed with ADB. Each DISCO will ensure that IPDPs are monitored and evaluated by an independent agency.
Stakeholder Communication, Participation, and Consultation
During Project Design At the design stage of MFF, stakeholder analysis has been undertaken. All stakeholders were involved in order to reduce the likelihood of grievances and to ensure that benefits are distributed fairly. Since there were no major changes in project design, no separate consultations were undertaken for Tranche 3. However, information on social safeguards and LARPs have been shared through public meetings.
During Project Implementation None.
Business Opportunities
Consulting Services The DISCOs and PEPCO will be supported by the facility management consultant, already hired under the MFF Support Component, in monitoring the project and providing guidance and technical support to the executing agency and implementing agencies.
Procurement

The procurement plan for the Tranche has been prepared for the first 18 months. There will be 23 ICB packages. Procurement experts working in the PMUs have reasonable expertise and have been provided with extensive training by ADB in the past three years. These staff have been actively involved in procurement of goods and turnkey contracts during the previous two tranches. Being familiar with ADB's standard bidding documents and to amplify project readiness, the DISCOs have prepared the first draft bidding documents for ICB contracts. It is expected that a few of the ICB packages will be advertised within Q4 of 2012, and the remaining during Q1 of 2013.

Advance contracting and retroactive financing of expenditures for the first and subsequent tranches (up to 20% of the proceeds from individual loans under the MFF) were approved by ADB, provided that those expenditures are incurred in accordance with agreed procedures and during the 12 months before the signing of the corresponding individual loan agreement and loan effectiveness under the MFF. Because of the urgent nature of the project, retroactive financing will cover eligible expenditures including works carried out under the categires of turnkey and equipment. Such financing will be subject to compliance with involuntary resettlement requirements stated in the LARPs. The government and the DISCOs were informed that approval of advanced contracting and retroactive financing does not commit ADB to finance any of the proposed subprojects. The DISCOs were also advised that they must comply with all ADB procurement procedures in order to qualify for retroactive financing.

Responsible ADB Officer Adnan Tareen
Responsible ADB Department Central and West Asia Department
Responsible ADB Division Energy Division, CWRD
Executing Agencies
Pakistan Electric Power Company (Pvt.) LimitedEDTPEPCO@HOTMAIL.COMRoom 726-WAPDA House
Shahra-i-Quaid-i-Azam
Lahore-54000, Pakistan
Timetable
Concept Clearance -
Fact Finding -
MRM 08 Nov 2012
Approval 14 Dec 2012
Last Review Mission -
Last PDS Update 25 Mar 2015

Loan 2972-PAK

Milestones
Approval Signing Date Effectivity Date Closing
Original Revised Actual
14 Dec 2012 09 Sep 2013 10 Dec 2013 31 Dec 2016 31 Jan 2018 -
Financing Plan Loan Utilization
Total (Amount in US$ million) Date ADB Others Net Percentage
Project Cost 272.00 Cumulative Contract Awards
ADB 245.00 14 Dec 2012 147.02 0.00 60%
Counterpart 27.00 Cumulative Disbursements
Cofinancing 0.00 14 Dec 2012 36.33 0.00 15%

Safeguard Documents

See also: Safeguards
Title Document Type Document Date
Power Distribution Enhancement Investment Program - Tranche 3: Biannual Environmental Monitoring Report, LESCO (January-June 2015) Environmental Monitoring Reports Jul 2015
Power Distribution Enhancement Investment Program - Tranche 3: Biannual Environmental Monitoring Report, FESCO (January-June 2015) Environmental Monitoring Reports Jul 2015
Power Distribution Enhancement Investment Program - Tranche 3: Biannual Environmental Monitoring Report, MEPCO (January-June 2015) Environmental Monitoring Reports Jul 2015
Power Distribution Enhancement Investment Program - Tranche 3: Biannual Environmental Monitoring Report, GEPCO (January-June 2015) Environmental Monitoring Reports Jul 2015
Power Distribution Enhancement Investment Program - Tranche 3: Biannual Environmental Monitoring Report, PESCO (January-June 2015) Environmental Monitoring Reports Jul 2015
Power Distribution Enhancement Investment Program - Tranche 3: Biannual Environmental Monitoring Report, HESCO (January-June 2015) Environmental Monitoring Reports Jul 2015
Power Distribution Enhancement Investment Program - Tranche 3: Biannual Environmental Monitoring Report, QESCO (January-June 2015) Environmental Monitoring Reports Jul 2015
Power Distribution Enhancement Investment Program - Tranche 3: Biannual Environmental Monitoring Report, IESCO (January-June 2015) Environmental Monitoring Reports Jul 2015
Power Distribution Enhancement Investment Program - Tranche 3: Biannual Social Monitoring Report, HESCO (July-December 2014) Social Monitoring Reports Apr 2015
Power Distribution Enhancement Investment Program - Tranche 3: Biannual Social Monitoring Report, IESCO (July-December 2014) Social Monitoring Reports Apr 2015
Power Distribution Enhancement Investment Program - Tranche 3: Biannual Social Monitoring Report, LESCO (July-December 2014) Social Monitoring Reports Apr 2015
Power Distribution Enhancement Investment Program - Tranche 3: 132 kV New Matli Grid Station Due Diligence Report Safeguards Due Diligence Reports Apr 2015
Power Distribution Enhancement Investment Program - Tranche 3: Biannual Environmental Monitoring Report, LESCO (July-December 2014) Environmental Monitoring Reports Jan 2015
Power Distribution Enhancement Investment Program - Tranche 3: Biannual Social Monitoring Report, QESCO (July-December 2014) Social Monitoring Reports Jan 2015
Power Distribution Enhancement Investment Program - Tranche 3: Biannual Environmental Monitoring Report, QESCO (July-December 2014) Environmental Monitoring Reports Jan 2015
Power Distribution Enhancement Investment Program - Tranche 3: Biannual Environmental Monitoring Report, MEPCO (July-December 2014) Environmental Monitoring Reports Jan 2015
Power Distribution Enhancement Investment Program - Tranche 3: Biannual Environmental Monitoring Report, FESCO (July-December 2014) Environmental Monitoring Reports Jan 2015
Power Distribution Enhancement Investment Program - Tranche 3: Biannual Environmental Monitoring Report, PESCO (July-December 2014) Environmental Monitoring Reports Jan 2015
Power Distribution Enhancement Investment Program - Tranche 3: Biannual Environmental Monitoring Report, GEPCO (June-December 2014) Environmental Monitoring Reports Jan 2015
Power Distribution Enhancement Investment Program - Tranche 3: Biannual Social Monitoring Report, GEPCO (July-December 2014) Social Monitoring Reports Jan 2015
Power Distribution Enhancement Investment Program - Tranche 3: Biannual Environmental Monitoring Report, IESCO (July-December 2014) Environmental Monitoring Reports Jan 2015
Power Distribution Enhancement Investment Program - Tranche 3: Biannual Social Monitoring Report, MEPCO (July-December 2014) Social Monitoring Reports Jan 2015
Power Distribution Enhancement Investment Program - Tranche 3: Digri - Tando Jan Muhammad, 132 kV Single Circuit Transmission Line Resettlement Plans Oct 2012
Power Distribution Enhancement Investment Program - Tranche 3: Hasilpur–Chunnawala 132 kV Single Circuit Transmission Line Resettlement Plans Oct 2012
Power Distribution Enhancement Investment Program - Tranche 3: M16: Shahdan Lund–Shah Sadar Din 132 kV Single Circuit Transmission Line Resettlement Plans Oct 2012
Power Distribution Enhancement Investment Program - Tranche 3: New Matli - Tando Ghulam Ali, 132 kV Double Circuit Transmission Line Resettlement Plans Oct 2012
Power Distribution Enhancement Investment Program - Tranche 3: Construction of Double Circuit 132 kV Transmission Line from Loralai to Quetta Resettlement Plans Oct 2012
Power Distribution Enhancement Investment Program - Tranche 3: Conversion of Head Marala Grid Station from 66Kv to 132Kv Initial Environmental Examination Oct 2012
Power Distribution Enhancement Investment Program - Tranche 3: Mianchanu–Chak 83 132 kV Single Circuit Transmission Line Resettlement Plans Oct 2012
Power Distribution Enhancement Investment Program - Tranche 3: Conversion of 66Kv to 132Kv Malikwal Grid Station Initial Environmental Examination Oct 2012
Power Distribution Enhancement Investment Program - Tranche 3: Tando Ghulam Ali - Digri,132 kV Double Circuit Transmission Line Resettlement Plans Oct 2012
Power Distribution Enhancement Investment Program - Tranche 3: Construction of Double Circuit 132 kV Transmission Line from Khuzdar to Quetta Resettlement Plans Oct 2012
Power Distribution Enhancement Investment Program - Tranche 3: Conversion of 66Kv to 132Kv Siranwali Grid Station Initial Environmental Examination Oct 2012
Power Distribution Enhancement Investment Program - Tranche 3: Faqirwali–Fort Abbas, 132 kV Single Circuit Transmission Line Resettlement Plans Oct 2012
Power Distribution Enhancement Investment Program - Tranche 3: Tando Jan Muhammad - Naukot, 132 kV Double Circuit Transmission Line Resettlement Plans Oct 2012
Power Distribution Enhancement Investment Program - Tranche 3: Mubarak Pur 132kV Grid Station and Double Circuit Transmission Line Resettlement Plans Oct 2012
Power Distribution Enhancement Investment Program - Tranche 3: Conversion of 66Kv to 132Kv of the Daska Grid Station Initial Environmental Examination Oct 2012
Power Distribution Enhancement Investment Program - Tranche 3: Hala Road GS - Hala, 132 kV Double Circuit Transmission Line Resettlement Plans Oct 2012
Power Distribution Enhancement Investment Program - Tranche 3: Chistian–Daharanawala, 132 kV Single Circuit Transmission Line Resettlement Plans Oct 2012
Power Distribution Enhancement Investment Program - Tranche 3: Tando Muhammad Khan - New Matli,132 kV Double Circuit Transmission Line Resettlement Plans Oct 2012
Power Distribution Enhancement Investment Program - Tranche 3: Haroonabad–Faqirwali, 132 kV Single Circuit Transmission Line Resettlement Plans Oct 2012
Power Distribution Enhancement Investment Program - Proposed Tranche 3: Construction of 132 KV SDT Transmission Line from 132 KV Tando Jan Muhammad to 132 KV Noukot Initial Environmental Examination Oct 2012
Power Distribution Enhancement Investment Program - Proposed Tranche 3: Tando Ghulam Ali Conversion from 66 KV to 132 KV and New Matli – 132 KV TG Ali SDT Transmission Line Initial Environmental Examination Oct 2012
Power Distribution Enhancement Investment Program - Proposed Tranche 3: Construction of 132 KV New Matli Grid Station and Tando Muhammad Khan – 132 KV New Matli Double Circuit Transmission Line Initial Environmental Examination Oct 2012
Power Distribution Enhancement Investment Program - Tranche 3: Tando Jan Muhammad Conversion from 66 KV to 132 KV and Tando Jan Muhammad -132 KV Digri SDT Transmission Line Initial Environmental Examination Oct 2012
Power Distribution Enhancement Investment Program - Tranche 3: Digri Conversion from 66 KV to 132 KV and Tando Ghulam Ali – 132 KV Digri SDT Transmission Line Initial Environmental Examination Oct 2012
Power Distribution Enhancement Investment Program Tranche 3 Resettlement Frameworks Oct 2012
Power Distribution Enhancement Investment Program - Tranche 3: Chakri Road Transmission Line Resettlement Plans Oct 2012
Power Distribution Enhancement Investment Program - Tranche 3: Khuzdar - Quetta Industrial 132KV Double Circuit Transmission line Subproject Initial Environmental Examination Oct 2012
Power Distribution Enhancement Investment Program - Proposed Tranche 3: 132 KV Sakhi Chashma New Substation Development Initial Environmental Examination Oct 2012
Power Distribution Enhancement Investment Program - Proposed Tranche 3: Conversion of 66 KV Faqirwali Grid Station to 132 KV Initial Environmental Examination Oct 2012
Power Distribution Enhancement Investment Program - Tranche 3: 30 Km Double Circuit 132 KV Transmission Line Subproject Resettlement Plans Oct 2012
Power Distribution Enhancement Investment Program - Tranche 3: Darban Grid Station Resettlement Plans Oct 2012
Power Distribution Enhancement Investment Program - Tranche 3: Conversion of Daska Grid Station from 66kV to 132kV and Double Circuit Transmission Line Resettlement Plans Oct 2012
Power Distribution Enhancement Investment Program - Tranche 3: New Rawat - Sowan Transmission Line Resettlement Plans Oct 2012
Power Distribution Enhancement Investment Program - Tranche 3: Loralai - Quetta Industrial 132KV Double Circuit Transmission Line Subproject Initial Environmental Examination Oct 2012
Power Distribution Enhancement Investment Program - Proposed Tranche 3: Conversion of 66KV Kulachi to 132KV Grid Station and 132 KV Double Circuit Transmission Line to feed Kulachi Initial Environmental Examination Oct 2012
Power Distribution Enhancement Investment Program – Tranche 3: Conversion of 66 KV Shah Sadar Din Grid Station to 132KV and 132KV SDT Transmission Line from Shahdan Lund to Shah Sadar Din Initial Environmental Examination Oct 2012
Power Distribution Enhancement Investment Program - Tranche 3: 45 Km 132 KV transmission line from 66 KV Grid Station 18-Hazari to 66 KV Grid Station Garh Maharaja Resettlement Plans Oct 2012
Power Distribution Enhancement Investment Program - Tranche 3: Kulachi Grid Station Resettlement Plans Oct 2012
Power Distribution Enhancement Investment Program - Tranche 3: Conversion of Malikwal Grid Station from 66kV to 132kV and Double Circuit 132kV Transmission Line Resettlement Plans Oct 2012
Power Distribution Enhancement Investment Program - Proposed Tranche 3: Conversion of 66KV to 132 KV Chak 83/12-L Grid Station Initial Environmental Examination Oct 2012
Power Distribution Enhancement Investment Program - Tranche 3: Sangjani - Zero Point 132kV Transmission Line Resettlement Plans Oct 2012
Power Distribution Enhancement Investment Program - Proposed Tranche 3: Conversion of 66KV Daraban to 132KV Grid Station and 132 KV SDT Transmission Line to feed Daraban Initial Environmental Examination Oct 2012
Power Distribution Enhancement Investment Program - Proposed Tranche 3: Conversion of 66 KV to 132 KV Fort Abbas Grid Station Initial Environmental Examination Oct 2012
Power Distribution Enhancement Investment Program - Tranche 3: Double Circuit Three Km 132 KV Transmission Line subproject from Piplan-Rakh Dagran Grid Station Resettlement Plans Oct 2012
Power Distribution Enhancement Investment Program - Tranche 3: Burhan-New Wah Cct 1 &2 132 kV Transmission Line Resettlement Plans Oct 2012
Power Distribution Enhancement Investment Program - Tranche 3: Conversion of Siranwali Grid Station from 66kV to 132kV and Double Circuit Transmission Line Resettlement Plans Oct 2012
Construction of 132 KV SDT Transmission Line from 220/132 KV Hala Road to Hala Initial Environmental Examination Oct 2012
Power Distribution Enhancement Investment Program - Tranche 3: In & Out Construction at Chakri Sub Station Transmission Line Subproject Resettlement Plans Oct 2012
Power Distribution Enhancement Investment Program - Proposed Tranche 3: Power Transformer's Extension Subprojects (Dalazak, Karak, Tank, Hussai and Timergara) Initial Environmental Examination Oct 2012
Power Distribution Enhancement Investment Program - Proposed Tranche 3: Construction of New 132 KV Mubarak Pur Grid Station Initial Environmental Examination Oct 2012
Power Distribution Enhancement Investment Program - Tranche 3: 132 KV Transmission Line from Jinah Hydropower - 220 KV Daud Khel to 66 KV Kalabagh Resettlement Plans Oct 2012
Power Distribution Enhancement Investment Program - Tranche 3: 132 kV New Sangjani Grid Station & Transmission Line Resettlement Plans Oct 2012
Power Distribution Enhancement Investment Program - Proposed Tranche 3: 132 KV Taru Jabba New Substation Development Initial Environmental Examination Oct 2012
Construction of 132KV Extension Bay at 220/132KV Hala Road DGS and 132KV Hala DGS Initial Environmental Examination Oct 2012
Power Distribution Enhancement Investment Program - Proposed Tranche 3: Conversion of 66 KV to 132 KV Dahranwala Grid Station Initial Environmental Examination Oct 2012
Power Distribution Enhancement Investment Program - Tranche 3: 132 KV 60 Km Double Circuit Toba Tek Singh-Havile Bahadar Shah Transmission Line Resettlement Plans Oct 2012
Power Distribution Enhancement Investment Program - Proposed Tranche 3: Augmentation of PESCO Subprojects (Rehman Baba, Swabi, Bannu, D.I.Khan, Kotal Town Kohat, Jalala, Jehangir and Batal) Initial Environmental Examination Oct 2012
Power Distribution Enhancement Investment Program – Tranche 3: Augmentation of MEPCO Sub-Projects Initial Environmental Examination Oct 2012
Power Distribution Enhancement Investment Program - Tranche 3: Conversion of Head Marala Grid Station from 66kV to 132kV and Double Circuit Transmission Line Resettlement Plans Oct 2012
Power Distribution Enhancement Investment Program - Proposed Tranche 3: New 132KV Chunawala Grid Station Initial Environmental Examination Oct 2012
Power Distribution Enhancement Investment Program - Proposed Tranche 3: Garh Maharaja Grid Station and Hazari to GM Raja Grid Station Initial Environmental Examination Sep 2012
Power Distribution Enhancement Investment Program - Proposed Tranche 3: Rakh Dagran Grid Station and Piplan Bhakkar In & Out Rakh Dagran Grid Station Initial Environmental Examination Sep 2012
Power Distribution Enhancement Investment Program (Proposed Tranche 3) Environmental Assessment and Review Framework Sep 2012
Construction of New 60km Double Circuit 132Kv Transmission Line from 220Kv Grid Station Toba Tek Singh to Havelli Bahadar Shah Grid Station Initial Environmental Examination Sep 2012
Power Distribution Enhancement Investment Program - Proposed Tranche 3: Kala Bagh Grid Station and Jinnah Hydropower - Daud Khel In & Out Kala Bagh Grid Station Initial Environmental Examination Sep 2012
Power Distribution Enhancement Investment Program - Proposed Tranche 3: Hazari Grid Station and Havelli Bahadar Shah to 18 - Hazari Grid Station Initial Environmental Examination Sep 2012
Power Distribution Enhancement Investment Program - Proposed Tranche 3: Construction of New 132Kv Grid Station at DHA Phase-VI Initial Environmental Examination Sep 2012
Power Distribution Enhancement Investment Program - Proposed Tranche 3: Construction of New 132Kv Grid Station at Fruit Mandi Initial Environmental Examination Sep 2012
Power Distribution Enhancement Investment Program - Proposed Tranche 3: Construction of New 132Kv Grid Station at Sadhoki Initial Environmental Examination Sep 2012
Power Distribution Enhancement Investment Program - Proposed Tranche 3: Construction of New 132Kv Grid Station at DHA Phase-VII Initial Environmental Examination Sep 2012
Power Distribution Enhancement Investment Program – Proposed Tranche 3 Environmental Assessment and Review Framework Sep 2012
Power Distribution Enhancement Investment Program - Tranche 3: 132KV Rewat - Sowan Double Circuit Transmission Line Initial Environmental Examination Aug 2012
Power Distribution Enhancement Investment Program - Tranche 3: Augmentation & Extension of Power Transformer Subprojects Initial Environmental Examination Aug 2012
Power Distribution Enhancement Investment Program - Tranche 3: Construction of 132Kv Grid Station at Shahbaz Khel District Mianwali Initial Environmental Examination Aug 2012
Power Distribution Enhancement Investment Program - Tranche 3: In and Out Construction at 132KV Chakri Grid Station Transmission Line Initial Environmental Examination Aug 2012
Power Distribution Enhancement Investment Program - Tranche 3: Construction of 132Kv Grid Station at Faisalabad City, near Railway Colony Faisalabad Initial Environmental Examination Aug 2012
Power Distribution Enhancement Investment Program - Tranche 3: 132 KV Koh-E-Noor Textile Mill – Chakri Road Double Circuit Transmission Line Initial Environmental Examination Aug 2012
Power Distribution Enhancement Investment Program - Tranche 3: 132 KV Sang Jani II Grid Station and New 132 KV Double Circuit Feeding Transmission Line Initial Environmental Examination Aug 2012
Power Distribution Enhancement Investment Program - Tranche 3: 132 KV Burhan–New Wah Double Circuit Transmission Line Initial Environmental Examination Aug 2012
Power Distribution Enhancement Investment Program - Tranche 3: 132 KV Sang Jani – Zero Point Double Circuit Transmission Line Initial Environmental Examination Aug 2012
Power Distribution Enhancement Investment Program - Proposed Tranche 3: Transformer’s Augmentation & Extension Sub-Projects Initial Environmental Examination Aug 2012
Power Distribution Enhancement Investment Program - Tranche 3: 132 KV Chakri Road Grid Station with New 132 KV Double Circuit Feeding Transmission Line Initial Environmental Examination Aug 2012

Evaluation Documents

See also: Independent Evaluation

No documents found.


The Public Communications Policy (PCP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.

Requests for information may also be directed to the InfoUnit.