The purpose of the TA is to (i) assist the EA in preparing the Project that will upgrade the Korle-Kuche section of the G314 Highway to a 4-lane expressway suitable for ADB financing; and (ii) review road issues and provide the basis for strengthening the ongoing policy dialogue with the Government. The TA will include three outputs: (i) a study on the impact of the G314 Highway improvement on regional economic cooperation; (ii) a feasibility study, including an EIA and summary EIA, resettlement plan, ethnic minority development plan for the Project in conformity with ADB's requirements; and (iii) the EA's strengthened capacity for project preparation, and increased familiarity with ADB's operational policies and procedures on procurement, consulting services, safeguard issues, economic and financial analyses for investment projects, and project monitoring and evaluation through training.

Latest Project Documents


Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.

The Public Communications Policy (PCP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.

The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.

In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Project Name Xinjiang Regional Road Improvement Project
Project Number 39655-012
Country China, People's Republic of
Project Status Closed
Project Type / Modality of Assistance Technical Assistance
Source of Funding / Amount
TA 4773-PRC: Xinjiang Regional Road Improvement Project
Technical Assistance Special Fund US$ 600,000.00
Strategic Agendas Inclusive economic growth
Drivers of Change
Sector / Subsector Transport - Road transport (non-urban)
Gender Equity and Mainstreaming No gender elements
Description The purpose of the TA is to (i) assist the EA in preparing the Project that will upgrade the Korle-Kuche section of the G314 Highway to a 4-lane expressway suitable for ADB financing; and (ii) review road issues and provide the basis for strengthening the ongoing policy dialogue with the Government. The TA will include three outputs: (i) a study on the impact of the G314 Highway improvement on regional economic cooperation; (ii) a feasibility study, including an EIA and summary EIA, resettlement plan, ethnic minority development plan for the Project in conformity with ADB's requirements; and (iii) the EA's strengthened capacity for project preparation, and increased familiarity with ADB's operational policies and procedures on procurement, consulting services, safeguard issues, economic and financial analyses for investment projects, and project monitoring and evaluation through training.
Project Rationale and Linkage to Country/Regional Strategy ADB's Country Strategy and Program in the road sector supports (i) construction of roads that connect major growth centers and link the hinterland economies; (ii) integration of the network so that the national trunk highway system is supported by a system of local roads, particularly those that provide access to poor areas; (iii) promotion of road safety and reduction of vehicle emissions; (iv) institutional strengthening to increase the commercial orientation and efficiency of expressway organizations; (v) improvement of highway planning and evaluation techniques; (vi) adoption of pricing policies to ensure optimum use of road transport capacity; and (vii) use of alternative methods of investment financing, including private sector participation. The Project is consistent with the PRC?s development priorities and ADB?s strategy.
Impact
Project Outcome
Description of Outcome
Progress Toward Outcome
Implementation Progress
Description of Project Outputs
Status of Implementation Progress (Outputs, Activities, and Issues)
Geographical Location Western Region including the Xinjiang Uygur Autonomous Region
Safeguard Categories
Environment A
Involuntary Resettlement A
Indigenous Peoples A
Summary of Environmental and Social Aspects
Environmental Aspects
Involuntary Resettlement
Indigenous Peoples
Stakeholder Communication, Participation, and Consultation
During Project Design
During Project Implementation
Business Opportunities
Consulting Services The TA will require 39 person-months of consultant inputs (13 international and 26 domestic). The international consultant's team will have expertise in the following fields: highway engineering, transport economics, road safety, financial analysis and expressway operations, social and poverty analysis, and environmental assessment. The international consultants will be supported by domestic consultants in highway engineering, transport economics, road safety, financial analysis and expressway operations, social and poverty analysis, resettlement, and environmental assessment.
Responsible ADB Officer Yang Xiaohong
Responsible ADB Department East Asia Department
Responsible ADB Division Transport and Communications Division, EARD
Executing Agencies
Xinjiang Communications DepartmentMr. Lijiati SulitangNo. 48, Huanghe Road Urumqi, Xinjiang 830000
Timetable
Concept Clearance 09 Dec 2005
Fact Finding 06 Jan 2006 to 12 Jan 2006
MRM -
Approval 21 Mar 2006
Last Review Mission -
PDS Creation Date 16 Mar 2006
Last PDS Update 21 Jan 2010

TA 4773-PRC

Milestones
Approval Signing Date Effectivity Date Closing
Original Revised Actual
21 Mar 2006 26 Apr 2006 26 Apr 2006 31 Mar 2007 31 Dec 2009 -
Financing Plan/TA Utilization Cumulative Disbursements
ADB Cofinancing Counterpart Total Date Amount
Gov Beneficiaries Project Sponsor Others
600,000.00 0.00 175,000.00 0.00 0.00 0.00 775,000.00 21 Mar 2006 556,082.20
Title Document Type Document Date
Xinjiang Regional Road Improvement Project Technical Assistance Reports Mar 2006

Safeguard Documents

See also: Safeguards
Title Document Type Document Date
Xinjiang Regional Road Improvement Project: Wuqia County Border Road (Draft) Indigenous Peoples Plans/Indigenous Peoples Development Plans Jul 2007
Xinjiang Regional Road Improvement Project Environmental Assessment and Measures Mar 2007

Evaluation Documents

See also: Independent Evaluation

No documents found.


The Public Communications Policy (PCP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.

Requests for information may also be directed to the InfoUnit.