40514-012: LAO: PREPARING THE CUMULATIVE IMPACT ASSESSMENT FOR THE NAM NGUM 3 HYDROPOWER PROJECT

Project Data Sheet (PDS): Overview


Description

The purpose of the TA is to undertake project preparatory work for the Nam Ngum 3 Hydropower Project (Project). Specifically, the TA will conduct a cumulative impact assessment (CIA) study for the Project consistent with the National Policy of Environmental and Social Sustainability of the Hydropower Sector in Lao People's Democratic Republic and the ADB policies and guidelines. The TA will assess the impacts of the Project and (i) identify potential sector impacts; (ii) predict major cumulative environmental impacts; (iii) indicate threshold levels of sustainable development; and (iv) set environmental parameter standards and targets. The results of the study will be used by the sponsors of the Project to develop a comprehensive environmental and social mitigation plan specific to the Project. The results of the study could also be used by the government in their discussion of mitigating measures with the other developers of major hydropower, mining and industrial projects in the Nam Ngum River Basin. The TA will also design and assist the Government implement a monitoring program. Finally, the TA will conduct a needs assessment and then design a capacity building program for the government agencies at the national and provincial levels that would not duplicate but rather complement training programs already available to the Government. Read More

Country Lao People's Democratic Republic
Borrower/Equity Investment Name
Project Number 40514-012
Project Type or Modality of Assistance TA
Financing Private sector (Nonsovereign)
Status Approved
Approval Number 4921
Approval Date 21 Feb 2007
Geographical Location Xiengkhouang Province, Lao PDR
Sector Energy
Subsector Large hydropower generation
Safeguard Categories Environment: A
Resettlement: A/B
Indigenous People: A

 

 

Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.

The Public Communications Policy (PCP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.

The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.

In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Project Data Sheets (PDS)

Responsible ADB Officer
Edvard M. Baardsen
Request for information

Responsible ADB Department
Private Sector Operations Department

Responsible ADB Divisions
Infrastructure Finance Division 2

Executing Agencies
Ministry of Energy and Mines

PDS Creation Date
04 Sep 2007

Last PDS Update
08 Nov 2010