Uzbekistan: Advanced Electricity Metering Phase 4 Project

Sovereign Project | 41340-015 Status: Approved

Summary

The project will install an advanced electricity metering (AEM) system that uses modern, accurate, and tamper-proof revenue meters for the power grid system and end-users in five regions (Andijan, Fergana, Kashkadarya, Namangan, and Surkhandarya) to complete the nationwide rollout of AEM. The project will promote energy efficiency in power distribution by reducing commercial losses and improving the efficiency of electricity revenue collection. The installation of 3.1 million meters, integrated meter-to-cash solutions, and a capacity development component will help Uzbekenergo and its customers effectively adopt and utilize the new technology.

Latest Project Documents

Consulting Notices

See also: CMS

No notices are currently available for this project.

Procurement Notices

See also: Operational Procurement

No notices are currently available for this project.

Procurement Documents


Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.

The Public Communications Policy (PCP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.

The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.

In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

 
Project Name Advanced Electricity Metering Phase 4 Project
Project Number 41340-015
Country Uzbekistan
Project Status Approved
Project Type / Modality of Assistance Loan
Source of Funding / Amount
Loan 3286-UZB: Advanced Electricity Metering Phase 4 Project
Ordinary capital resources US$ 300.00 million
Loan: Advanced Electricity Metering Phase 4 Project
Uzbekistan Fund for Reconstruction and Development US$ 70.00 million
Strategic Agendas Inclusive economic growth
Drivers of Change Governance and capacity development
Knowledge solutions
Partnerships
Sector / Subsector

Energy - Electricity transmission and distribution

Gender Equity and Mainstreaming Effective gender mainstreaming
Description

The project will install an advanced electricity metering (AEM) system that uses modern, accurate, and tamper-proof revenue meters for the power grid system and end-users in five regions (Andijan, Fergana, Kashkadarya, Namangan, and Surkhandarya) to complete the nationwide rollout of AEM. The project will promote energy efficiency in power distribution by reducing commercial losses and improving the efficiency of electricity revenue collection. The installation of 3.1 million meters, integrated meter-to-cash solutions, and a capacity development component will help Uzbekenergo and its customers effectively adopt and utilize the new technology.

The impact will be improved financial viability in the power sector. The project will help ensure (i) accurate accounting and billing of energy, (ii) commercial loss reduction, and (iii) improved energy efficiency. The outcome will be the improved electricity revenue collection in the targeted regions. The project will cover Andijan, Fergana, Kashkadarya, Namangan, and Surkhandarya regions. The project will improve metering accuracy, billing efficiency, and tariff collection rates; and provide anti-tampering and fault-detection capability to Uzbekenergo.

Project Rationale and Linkage to Country/Regional Strategy

The economy has sustained high growth, averaging 8% in 2010-2014. Growth in 2015 and beyond is expected to remain above 7%. The Government of Uzbekistan prioritizes modernizing industry and developing infrastructure and the private sector. Reliable and affordable electricity supply is vital to achieving these goals. One of the key challenges is the high level of losses in the power sector. The State Joint Stock Company Uzbekenergo, a vertically integrated state-owned utility, reported system losses of over 18% in 2014, with transmission losses at 4% and distribution losses 14%. Revenue collection rate was also low, at 80% or less. These reported losses may be understated because of Uzbekenergo's inability under its current system to accurately collect information about the amount of electricity supplied and to monitor the revenue collection.

The economy has sustained high growth, averaging 8% in 2010 2014. Growth in 2015 and beyond is expected to remain above 7%. The Government of Uzbekistan prioritizes modernizing industry and developing infrastructure and the private sector. Reliable and affordable electricity supply is vital to achieving these goals. One of the key challenges is the high level of losses in the power sector. The Joint Stock Company Uzbekenergo, a vertically integrated state-owned utility, reported system losses of over 18% in 2014, with transmission losses at 4% and distribution losses at 14%. Revenue collection rate was also low, at 80% or less. These reported losses may not be accurate because of Uzbekenergo's inability under its current system to accurately collect information about the amount of electricity supplied and to monitor the revenue collection.

The high level of electricity losses comes from the lack of investment in modern distribution assets and outdated manual operations, which results in inaccurate, unreliable, and inefficient revenue collection. Electricity meters are generally old and are in service beyond their designed economic life without proper recalibration. They are inaccurate and susceptible to tampering. Without proper grid metering, Uzbekenergo faces difficulty in accounting for electricity supplied and used. Manual billing systems leave room for potential collusion between customers and tariff collection officers. Incentive mechanisms to reduce losses are not sufficiently institutionalized.

To overcome these challenges, Uzbekenergo has requested international financial institutions to finance a nationwide AEM program. AEM or smart metering allows two-way communication between the utility and customer meters. AEM enables the utility to remotely disconnect and reconnect supply without having to send utility officers to the site. This function removes the human factor in meter reading and reporting, thus enhancing disincentives for meter tampering and customers who do not make full payment on time. AEM provides more accurate power usage information, which helps customers manage their electricity consumption and improve energy efficiency, and empowers the utility in identifying losses in the distribution system. The remote monitoring capability also enables the utility to prevent overloading of the distribution system and, as a result, technical losses may be reduced.

The introduction of AEM is one of many efforts being undertaken by Uzbekenergo to improve the sector's efficiency and performance, and it is a priority project under the government's long-term investment and structural reform program (2015 2019). Uzbekistan has 13,500 megawatts of installed capacity, of which 85% is thermal power. Concurrently, old inefficient power plants are being replaced by energy-efficient combined-cycle gas turbines. The electricity tariff has been steadily rising to support financial sustainability and cost recovery. Financial transparency has improved, with ADB assistance, since Uzbekenergo adopted external audits based on the International Standards on Auditing from FY2011.

Uzbekenergo aims to cover 6.3 million customers with AEM. It initiated its first large-scale AEM project financed by ADB for 1 million customers. Implementation of the first project has been satisfactory, although procurement has taken longer than expected because AEM systems are complex and new to the country. To complete the nationwide rollout of AEM, Uzbekistan has requested ADB to finance the project to cover five regions.

The project is in line with ADB's country partnership strategy for Uzbekistan, which includes a focus on energy efficiency and reliable power supply. The project is included in ADB's draft country operations business plan for Uzbekistan, 2016 2018.

Impact Power sector financial viability improved (National Investment Program: 2015-2019).
Project Outcome
Description of Outcome Electricity revenue collection in the targeted regions improved.
Progress Toward Outcome
Implementation Progress
Description of Project Outputs

1. AEM infrastructure installed and functional.

2. Operations manual adopted and loss reduction operations strengthened.

3. Customer service for end-users improved.

Status of Implementation Progress (Outputs, Activities, and Issues)
Geographical Location Andijan, Ferghana, Namangan, Kashkadarya, and Surkhandarya
Safeguard Categories
Environment C
Involuntary Resettlement C
Indigenous Peoples C
Summary of Environmental and Social Aspects
Environmental Aspects No major environmental safeguards issues are envisaged under the project.
Involuntary Resettlement No major issues on involuntary resettlement are envisaged under the project.
Indigenous Peoples No major issues on indigenous peoples are envisaged under the project.
Stakeholder Communication, Participation, and Consultation
During Project Design Stakeholders' consultations through community meetings, discussions, and interviews was conducted during the PPTA. Poor women's participation as individual consumers or as representative of interested groups was encouraged.
During Project Implementation Community meetings, discussions, and interviews. Women leaders in government and business will be involved to participate in the consumer education campaign. The project executing agency will coordinate with Makhalla (community organization) women's committee for public information program on advanced electricity metering and energy efficiency.
Business Opportunities
Consulting Services Uzbekenergo will engage a (i) Project management and supervision consultant (consulting firm) using quality-cost based selection (90:10) for 310 person-months; and (ii) External auditor using consultants' qualification selection for 30 person-months.
Procurement Uzbekenergo will employ turnkey contractors (two lots) for the AEM system for Andijan, Ferghana, Kashkadarya, Namangan, and Surkhandarya regions, using ADB's single-stage, two-envelope bidding procedure. The contractor will provide related services to Uzbekenergo such as training, trouble-shooting, and the customization and installation of the system. The installation of meters will be undertaken by the Uzbekenergo personnel, under the supervision of the contractors and the project supervision consultant.
Responsible ADB Officer Keiju Mitsuhashi
Responsible ADB Department Central and West Asia Department
Responsible ADB Division Energy Division, CWRD
Executing Agencies
UzbekEnergo
6 Istiklol Street,
Tashkent,100000, Uzbekistan
Timetable
Concept Clearance 05 Jun 2013
Fact Finding 18 Feb 2015 to 27 Feb 2015
MRM 22 Jun 2015
Approval 18 Sep 2015
Last Review Mission -
Last PDS Update 22 Sep 2015

Loan 3286-UZB

Milestones
Approval Signing Date Effectivity Date Closing
Original Revised Actual
18 Sep 2015 12 Nov 2015 - 30 Jun 2021 - -
Financing Plan Loan Utilization
Total (Amount in US$ million) Date ADB Others Net Percentage
Project Cost 544.00 Cumulative Contract Awards
ADB 300.00 18 Sep 2015 0.00 0.00 0%
Counterpart 174.00 Cumulative Disbursements
Cofinancing 70.00 18 Sep 2015 0.00 0.00 0%

Safeguard Documents

See also: Safeguards

Safeguard documents provided at the time of project/facility approval may also be found in the list of linked documents provided with the Report and Recommendation of the President.

None currently available.

Evaluation Documents

See also: Independent Evaluation

None currently available.

Related Publications

None currently available.


The Public Communications Policy (PCP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.

Requests for information may also be directed to the InfoUnit.