Viet Nam : Power Transmission Investment Program - Tranche 3

Sovereign Project | 42039-036

The investment program will contribute to meeting electricity demand growth of industrial, commercial, and residential consumers in an economically and environmentally sustainable manner. The outcome of the investment program is enhanced capacity of the transmission network to balance power load. The investment program also supports partial implementation of National Power Sector Development Master Plan VII to meet growing electricity demand of industrial, commercial and residential consumers throughout Viet Nam, and improve the operational effectiveness and efficiency of the National Power Transmission Corporation (NPT)-the entity responsible for financing, managing and operating the transmission network to ensure reliable electricity supply.

Tranche 3 will finance part of each of the two outputs:

Output 1: Expanded Transmission Network (Physical investment)

Output 3: Project Implementation Support (Non-physical investment)

Project Name Power Transmission Investment Program - Tranche 3
Project Number 42039-036
Country / Economy Viet Nam
Project Status Closed
Project Type / Modality of Assistance Loan
Source of Funding / Amount
Loan 3374-VIE: Power Transmission Investment Program - Tranche 3
Ordinary capital resources US$ 231.31 million
Loan: Power Transmission Investment Program - Tranche 3
KfW Bankengruppe US$ 71.01 million
Strategic Agendas Inclusive economic growth
Drivers of Change Private sector development
Sector / Subsector

Energy / Electricity transmission and distribution

Gender No gender elements
Description

The investment program will contribute to meeting electricity demand growth of industrial, commercial, and residential consumers in an economically and environmentally sustainable manner. The outcome of the investment program is enhanced capacity of the transmission network to balance power load. The investment program also supports partial implementation of National Power Sector Development Master Plan VII to meet growing electricity demand of industrial, commercial and residential consumers throughout Viet Nam, and improve the operational effectiveness and efficiency of the National Power Transmission Corporation (NPT)-the entity responsible for financing, managing and operating the transmission network to ensure reliable electricity supply.

Tranche 3 will finance part of each of the two outputs:

Output 1: Expanded Transmission Network (Physical investment)

Output 3: Project Implementation Support (Non-physical investment)

Project Rationale and Linkage to Country/Regional Strategy

Recognizing the need to overcome current constraints in the power sector to ensure that rapidly growing electricity demand can be met in an economically and environmentally sustainable manner to sustain economic growth, the government of Viet Nam approved in 2011 the PDMP VII . With PDMP VII, the government approved multiple power generation and transmission projects to be implemented during 2011-2020 and laid out a detailed road map and reform framework for (i) strengthening financial capacity, (ii) improving the operational performance of power sector entities, (iii) enhancing human resource capacity and development, (iv) improving the technological optimization and modernization of power sector infrastructure, and (v) enhancing energy efficiency in generation and consumption to sustainably develop and modernize Viet Nam''s power sector.

Impact

meeting electricity demand growth of industrial, commercial and residential consumers throughout Viet Nam by 2025.

Project Outcome
Description of Outcome

enhanced capacity of transmission network to balance power load.

Progress Toward Outcome 220 kV and 500 kV substation and transmission line either have been or are being constructed in accordance with international standards and code of conduct. Environmental and social safeguard reports are submitted in accordance with ADB requirements but with some delays.
Implementation Progress
Description of Project Outputs

Expanded Transmission Network

Project Implementation Support

Status of Implementation Progress (Outputs, Activities, and Issues)

Construction of 67.7 km of 500kV transmission lines under three subprojects is ongoing and to be completed in Q2-Q4/202072.6 km of 220kV transmission lines has been expanded by June 2019. 63 km will be expanded by Q4/2020.900 MVA of 500kV substation capacity expanded by May 2019. Additional 1,800 MVA will be expanded by Q2-Q4/2020.875 MVA of 220kV substation capacity expanded during 2017-June 2019. Additional 250 MVA will be expanded by Q2/2020. All contracts of 9 sub-projects were awarded. 6 sub-projects were completed.

Environmental and social safeguard reports are submitted in accordance with ADB requirements but with some delays.

The transmission lines and substations were designed and constructed in accordance with international and national standards.It should be also noted that there are some contracts with completion date of 30 June 2020 and one contract of 31 December 2020. To accommodate these contracts by loan proceeds, the loan closing date is consider to be extended by 31 December 2020.

Geographical Location Nation-wide
Safeguard Categories
Environment B
Involuntary Resettlement A
Indigenous Peoples B
Summary of Environmental and Social Aspects
Environmental Aspects
Involuntary Resettlement
Indigenous Peoples
Stakeholder Communication, Participation, and Consultation
During Project Design A total of 1495 people (1,014 males and 481 females) directly affected by this Project were consulted in public meetings in district and commune centers in each the nine Subproject areas, including representatives of 17 out of 19 affected ethnic minority households. The opinions and suggestions of participants in the consultations, such as those pertaining to the restricted use of land within the right-of-way of transmission lines, were reflected in the RPs.
During Project Implementation
Business Opportunities
Consulting Services A total of 48 person-months through individual consultant selection will be engaged under Tranche 3. These project implementation support (safeguards) will be financed under ADB loan following ADB's Guidelines on the Use of Consultants (2013, as amended from time to time). The project implementation support who will handle construction management will be financed entirely by NPT.
Procurement

The documents that will govern all procurement actions of goods, works and services will include (i) the Financing Framework Agreement; (ii) the Loan and Project Agreement; (iii) ADB's Procurement Guidelines (2015, as amended from time to time) and ADB's Guidelines on the Use of Consultants (2013, as amended from time to time); and (iv) ADB's Standard Bidding Documents.

International Competitive Bidding procedures (ICB) will be used for civil works and goods contracts (except those to be procured through Direct Contracting). The estimated values of nearly all contracts exceed the ICB thresholds of $10.0 million (for civil works) and $2.0 million (for supply contracts). While the estimated values of several contracts fall slightly below these thresholds, ICB will be used for these contracts due to the Implementing Agencies' preference to use standardized Bidding Documents in the project. Therefore, National Competitive Bidding procedures (NCB) are not expected to be used. Qualification and eligibility requirements will be specified in the procurement plan and bidding documents.

In the event that any procurement is conducted through National Competitive Bidding, , before the start of the procurement, ADB and the Government will review the public procurement laws to ensure consistency with ADB's Procurement Guidelines. National Competitive Bidding procedures applicable to Viet Nam are attached with the Procurement Plan.

International shopping will be authorized for procurement of goods and works with a contract price equivalent of $100,000 or less.

Secondary equipment for expansion of existing 500 kV and 220 kV substations under operation using computerized control system (ST-G03 and ST-G04), may be procured on the basis of direct contracting or through shopping, as appropriate.

Where the equipment is procured directly, prior to such procurement, a list of individual items to be procured, an estimate of their costs, an indication of potential sources of supply and any related documents shall be submitted to ADB for approval. Unit rates for the equipment procured through direct contracting will be established on a valid, reasonable and verifiable basis. After award, three copies of each contract for such items shall be furnished to ADB.

Responsible ADB Officer Au, Tuan Minh
Responsible ADB Department Southeast Asia Department
Responsible ADB Division Viet Nam Resident Mission (VRM)
Executing Agencies
National Power Transmission Corporation
Timetable
Concept Clearance -
Fact Finding -
MRM 15 Sep 2015
Approval 18 Dec 2015
Last Review Mission -
Last PDS Update 07 Feb 2020

Loan 3374-VIE

Milestones
Approval Signing Date Effectivity Date Closing
Original Revised Actual
18 Dec 2015 06 Oct 2016 29 Dec 2016 30 Jun 2020 - 06 Sep 2021
Financing Plan Loan Utilization
Total (Amount in US$ million) Date ADB Others Net Percentage
Project Cost 307.69 Cumulative Contract Awards
ADB 231.31 17 Jun 2022 103.58 0.00 100%
Counterpart 76.38 Cumulative Disbursements
Cofinancing 0.00 17 Jun 2022 103.58 0.00 100%
Status of Covenants
Category Sector Safeguards Social Financial Economic Others
Rating Unsatisfactory Unsatisfactory - Unsatisfactory - Unsatisfactory

Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.

The Access to Information Policy (AIP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.

The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.

In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.


Safeguard Documents See also: Safeguards
Safeguard documents provided at the time of project/facility approval may also be found in the list of linked documents provided with the Report and Recommendation of the President.

Title Document Type Document Date
Power Transmission Investment Program - Tranche 3: 500 kV Chon Thanh Substation and 200 kV Binh Long-Tay Ninh Transmission Line Post-Resettlement Evaluation Report Social Monitoring Reports May 2022
Power Transmission Investment Program - Tranche 3: 500kV Chon Thanh Substation and 220kV Binh Long-Tay Ninh Transmission Line Completion on Social and Land Acquisition Implementation Social Monitoring Reports Apr 2022
Power Transmission Investment Program - Tranche 3: 500 kV My Tho-Duc Hoa Transmission Line, 500 kV Duc Hoa Substation, and 220 kV Vung Tau Substation Subprojects Social Monitoring Report (October-December 2020) Social Monitoring Reports Dec 2020
Power Transmission Investment Program - Tranche 3: 500kV Duc Hoa Substation and 500kV My Tho-Duc Hoa Transmission Line Social and Resettlement Monitoring Report (July-December 2020) Social Monitoring Reports Dec 2020
Power Transmission Investment Program - Tranche 3: SPMB Social Monitoring Report (July-September 2020) Social Monitoring Reports Nov 2020
Power Transmission Investment Program - Tranche 3: 500 kV Chon Thanh Substation and 200 kV Binh Long-Tay Ninh Transmission Line Social Monitoring Report (July-September 2020) Social Monitoring Reports Nov 2020
Power Transmission Investment Program - Tranche 3: 500 kV Chon Thanh Substation and 200 kV Binh Long-Tay Ninh Transmission Line Social Monitoring Report (January-June 2020) Social Monitoring Reports Nov 2020
Power Transmission Investment Program - Tranche 3: SPMB Social Monitoring Report (April-June 2020) Social Monitoring Reports Oct 2020
Power Transmission Investment Program - Tranche 3: Environmental Monitoring Report (July-September 2020) Environmental Monitoring Reports Oct 2020
Power Transmission Investment Program - Tranche 3: 500kV Chon Thanh Substation and 220kV Binh Long-Tay Ninh Transmission Line Social Monitoring Report (July-December 2018) Social Monitoring Reports Sep 2020
Power Transmission Investment Program - Tranche 3: CPPMB Social Monitoring Report (July-December 2019) Social Monitoring Reports Aug 2020
Power Transmission Investment Program - Tranche 3: CPPMB Social Monitoring Report (October-December 2019) Social Monitoring Reports Aug 2020
Power Transmission Investment Program - Tranche 3: 500 kV Duc Hoa Substation Connection Lines (Long An Province Segment-Duc Hoa District) Resettlement Plan Resettlement Plans Jul 2020
Power Transmission Investment Program - Tranche 3: 500 kV My Tho–Duc Hoa Transmission Line (Long An Province Segment-Duc Hue District) Resettlement Plan Addendum Resettlement Plans Jul 2020
Power Transmission Investment Program - Tranche 3: 500kV Chon Thanh Substation and 220kV Binh Long-Tay Ninh Transmission Line Social Monitoring Report (January-June 2020) Social Monitoring Reports Jul 2020
Power Transmission Investment Program - Tranche 3: SPMB Social Monitoring Report (July-December 2019) Social Monitoring Reports Jul 2020
Power Transmission Investment Program - Tranche 3: Environmental Monitoring Report (April-June 2020) Environmental Monitoring Reports Jul 2020
Power Transmission Investment Program - Tranche 3: SPMB Social Monitoring Report (January-March 2020) Social Monitoring Reports Jul 2020
Power Transmission Investment Program - Tranche 3: 500 kV Chon Thanh Substation and 200 kV Binh Long-Tay Ninh Transmission Line Social Monitoring Report (April-June 2020) Social Monitoring Reports Jul 2020
Power Transmission Investment Program - Tranche 3: SPMB Social Monitoring Report (October-December 2019) Social Monitoring Reports Jul 2020
Power Transmission Investment Program - Tranche 3: Southern Power Project Management Board Social Monitoring Report (January-June 2020) Social Monitoring Reports Jul 2020
Power Transmission Investment Program - Tranche 3: Environmental Monitoring Report (January-March 2020) Environmental Monitoring Reports Jul 2020
Power Transmission Investment Program - Tranche 3: 500kV Chon Thanh Substation and 220kV Binh Long-Tay Ninh Transmission Line Social Monitoring Report (July-December 2019) Social Monitoring Reports Jun 2020
Power Transmission Investment Program - Tranche 3: 500 kV My Tho–Duc Hoa Transmission Line (Tien Giang Province Segment-Tan Phuoc District) Resettlement Plan Resettlement Plans Jun 2020
Power Transmission Investment Program - Tranche 3: My Tho-Duc Hoa Transmission Line (Tien Giang Province Segment) Updated Resettlement Plan Resettlement Plans May 2020
Power Transmission Investment Program – Tranche 3: 500 kV Duc Hoa Substation 220kV Connection Line Resettlement Plan Resettlement Plans May 2020
Power Transmission Investment Program - Tranche 3: CPPMB Social Monitoring Report (July-September 2019) Social Monitoring Reports Apr 2020
Power Transmission Investment Program - Tranche 3: 500 kV Chon Thanh Substation and 220 kV Binh Long-Tay Ninh Transmission Line Social Monitoring Report (January-March 2020) Social Monitoring Reports Apr 2020
Power Transmission Investment Program - Tranche 3: CPPMB Social Monitoring Report (April-June 2019) Social Monitoring Reports Apr 2020
Power Transmission Investment Program - Tranche 3: Environmental Monitoring Report (October - December 2019) Environmental Monitoring Reports Feb 2020
Power Transmission Investment Program - Tranche 3: Environmental Monitoring Report (July-September 2019) Environmental Monitoring Reports Dec 2019
Power Transmission Investment Program - Tranche 3: CPPMB Social Monitoring Report (January-March 2019) Social Monitoring Reports Dec 2019
Power Transmission Investment Program - Tranche 3: CPPMB Social Monitoring Report (October-December 2018) Social Monitoring Reports Dec 2019
Power Transmission Investment Program - Tranche 3: SPPMB Social Monitoring Report (July-September 2019) Social Monitoring Reports Nov 2019
Power Transmission Investment Program – Tranche 3: Resettlement Monitoring Report (January-June 2019) Social Monitoring Reports Oct 2019
Power Transmission Investment Program – Tranche 3: SPPMB Social Monitoring Report (January-June 2019) Social Monitoring Reports Oct 2019
Power Transmission Investment Program - Tranche 3: Environmental Monitoring Report (April-June 2019) Environmental Monitoring Reports Sep 2019
Power Transmission Investment Program – Tranche 3: 500 kV Chon Thanh Substation Resettlement Plan Resettlement Plans Aug 2019
Power Transmission Investment Program - Tranche 3: CPPMB Social Monitoring Report (January-June 2018) Social Monitoring Reports Aug 2019
Power Transmission Investment Program - Tranche 3: CPPMB Social Monitoring Report (January-June 2019) Social Monitoring Reports Jul 2019
Power Transmission Investment Program – Tranche 3: Environmental Monitoring Report (January-March 2019) Environmental Monitoring Reports Jul 2019
Power Transmission Investment Program – Tranche 3: Social Monitoring Report (January-March 2019) Social Monitoring Reports May 2019
Power Transmission Investment Program - Tranche 3: Social Monitoring Report (January-March 2019) Social Monitoring Reports May 2019
Power Transmission Investment Program - Tranche 3: 220kV Duc Hoa Substation Resettlement Due Diligence Report and Corrective Action Plan Safeguards Due Diligence Reports Apr 2019
Power Transmission Investment Program - Tranche 3: Social Monitoring Report (July-December 2018) Social Monitoring Reports Apr 2019
Power Transmission Investment Program - Tranche 3: Social Monitoring Report (January-June 2018) Social Monitoring Reports Apr 2019
Power Transmission Investment Program – Tranche 3: 500 kV My Tho–Duc Hoa Transmission Line (Long An Province Segment-Ben Luc District) Resettlement Plan Resettlement Plans Mar 2019
Power Transmission Investment Program – Tranche 3: Environmental Monitoring Report (October-December 2018) Environmental Monitoring Reports Mar 2019
Power Transmission Investment Program – Tranche 3: Social Monitoring Report (July-December 2018) Social Monitoring Reports Mar 2019
Power Transmission Investment Program – Tranche 3: Social Monitoring Report (July-September 2018) Social Monitoring Reports Mar 2019
Power Transmission Investment Program – Tranche 3: Social Monitoring Report (October-December 2018) Social Monitoring Reports Mar 2019
Power Transmission Investment Program – Tranche 3: Social Monitoring Report (January-June 2018) Social Monitoring Reports Mar 2019
Power Transmission Investment Program – Tranche 3: Social Monitoring Report (October-December 2017) Social Monitoring Reports Mar 2019
Power Transmission Investment Program – Tranche 3: Social Monitoring Report (July-December 2017) Social Monitoring Reports Mar 2019
Power Transmission Investment Program – Tranche 3: 500 kV My Tho–Duc Hoa Transmission Line (Long An Province Segment) Updated Resettlement Plan Resettlement Plans Feb 2019
Power Transmission Investment Program - Tranche 3: Environmental Monitoring Report (July-September 2018) Environmental Monitoring Reports Feb 2019
Power Transmission Investment Program - Tranche 3: Environmental Monitoring Report (April-June 2018) Environmental Monitoring Reports Jan 2019
Power Transmission Investment Program - Tranche 3: Social Monitoring Report (July-September 2017) Social Monitoring Reports Jan 2019
Power Transmission Investment Program – Tranche 3: 500 kV My Tho–Duc Hoa Transmission Line (Long An Province Segment) Updated Resettlement Plan Resettlement Plans Dec 2018
Power Transmission Investment Program - Tranche 3: 500kV Chon Thanh Substation and 220kV Binh Long-Tay Ninh Transmission Line Social Monitoring Report (July-December 2018) Social Monitoring Reports Dec 2018
Power Transmission Investment Program – Tranche 3: Social Monitoring Report (July-December 2017) Social Monitoring Reports Dec 2018
Power Transmission Investment Program - Tranche 3: 220 kV Binh Long-Tay Ninh Transmission Line Additional Initial Environmental Examination Initial Environmental Examination Dec 2018
Power Transmission Investment Program – Tranche 3: My Tho- Duc Hoa Transmission Line Updated Resettlement Plan Resettlement Plans Nov 2018
Power Transmission Investment Program - Tranche 3: 220 kV Binh Long-Tay Ninh Transmission Line Binh Phuoc Province Segment Resettlement and Ethnic Minority Development Plan Combined Resettlement Plan and Indigenous Peoples Plans Oct 2018
Power Transmission Investment Program - Tranche 3: 220 kV Binh Long-Tay Ninh Transmission Line Tay Ninh Province Segment Resettlement and Ethnic Minority Development Plan Combined Resettlement Plan and Indigenous Peoples Plans Oct 2018
Power Transmission Investment Program - Tranche 3: 500kV Chon Thanh Substation and 220kV Binh Long-Tay Ninh Transmission Line Social Monitoring Report (July-September 2018) Social Monitoring Reports Sep 2018
Power Transmission Investment Program – Tranche 3: Social Monitoring Report (January-June 2018) Social Monitoring Reports Jul 2018
Power Transmission Investment Program – Tranche 3: Social Monitoring Report (April-June 2018) Social Monitoring Reports Jul 2018
Power Transmission Investment Program – Tranche 3: Environmental Monitoring Report (January-March 2018) Environmental Monitoring Reports Jul 2018
Power Transmission Investment Program - Tranche 3: 500kV Chon Thanh Substation and 220kV Binh Long-Tay Ninh Transmission Line Social Monitoring Report (March-June 2018) Social Monitoring Reports Jun 2018
Power Transmission Investment Program - Tranche 3: 500kV Chon Thanh Substation and 200kV Binh Long-Tay Ninh Transmission Line Subprojects Social Monitoring Report (January-June 2018) Social Monitoring Reports Jun 2018
Power Transmission Investment Program - Tranche 3: Environmental Monitoring Report (July–December 2017) Environmental Monitoring Reports Jun 2018
Power Transmission Investment Program – Tranche 3: Social Monitoring Report (January-March 2018) Social Monitoring Reports Apr 2018
Power Transmission Investment Program - Tranche 3: Resettlement Monitoring Report (January-June 2017) Social Monitoring Reports Jul 2017
Power Transmission Investment Program - Tranche 3: Environmental Monitoring Report (April-June 2017) Environmental Monitoring Reports Jul 2017
Power Transmission Investment Program - Tranche 3: Corrective Action Plan Performance Monitoring Report (March-June 2017) Social Monitoring Reports Jun 2017
Power Transmission Investment Program - Tranche 3: My Tho-Duc Hoa Transmission Line Resettlement Monitoring Report (March-June 2017) Social Monitoring Reports Jun 2017
Power Transmission Investment Program - Tranche 3: Vung Tau Substation Resettlement Monitoring Report (March-June 2017) Social Monitoring Reports Jun 2017
Power Transmission Investment Program - Tranche 3: Duc Hoa Substation and Connections Resettlement Monitoring Report (March-June 2017) Social Monitoring Reports Jun 2017
Power Transmission Investment Program - Tranche 3: Environmental Monitoring Report (January-March 2017) Environmental Monitoring Reports Mar 2017
Power Transmission Investment Program Tranche 3: 220kV Duc Hoa Substation Initial Environmental Examination Initial Environmental Examination Dec 2015
Power Transmission Investment Program Tranche 3: 500kV Duc Hoa Substation and Connections Initial Environmental Examination Initial Environmental Examination Dec 2015
Power Transmission Investment Program Tranche 3: Second Transformer Bank for 220 kV Tra Vinh Substation Initial Environmental Examination Initial Environmental Examination Dec 2015
Power Transmission Investment Program Tranche 3: Second Transformer Bank for 500kV Cau Bong Substation Initial Environmental Examination Initial Environmental Examination Dec 2015
Power Transmission Investment Program Tranche 3: 500kV Chon Thanh Substation and 220 kV and 500 kV Connections Initial Environmental Examination Initial Environmental Examination Dec 2015
Power Transmission Investment Program Tranche 3: 220kV Binh Long–Tay Ninh Transmission Line Initial Environmental Examination Initial Environmental Examination Dec 2015
Power Transmission Investment Program Tranche 3: Second Transformer Bank for 220 kV Uyen Hung Substation Initial Environmental Examination Initial Environmental Examination Dec 2015
Power Transmission Investment Program Tranche 3: Second Transformer Bank for 220 kV Vung Tau Substation Initial Environmental Examination Initial Environmental Examination Dec 2015
Power Transmission Investment Program Tranche 3: 500kV My Tho–Duc Hoa Transmission Line Initial Environmental Examination Initial Environmental Examination Nov 2015
Power Transmission Investment Program - Tranche 3: Cau Bong Substation Draft Initial Environmental Examination Initial Environmental Examination Jun 2015
Power Transmission Investment Program - Tranche 3: My Tho-Duc Hoa Transmission Line Draft Initial Environmental Examination Initial Environmental Examination Jun 2015
Power Transmission Investment Program - Tranche 3: Duc Hoa 500kV Substation Draft Resettlement Plan Resettlement Plans Jun 2015
Power Transmission Investment Program - Tranche 3: Tay Ninh Substation Draft Resettlement Due Diligence Report and Corrective Action Plan Safeguards Due Diligence Reports Jun 2015
Power Transmission Investment Program - Tranche 3: Chon Thanh Substation Draft Initial Environmental Examination Initial Environmental Examination Jun 2015
Power Transmission Investment Program - Tranche 3: Duc Hoa 220kV Substation Draft Initial Environmental Examination Initial Environmental Examination Jun 2015
Power Transmission Investment Program - Tranche 3: My Tho-Duc Hoa Transmission Line (Tien Giang Segment) Draft Resettlement Plan Resettlement Plans Jun 2015
Power Transmission Investment Program - Tranche 3: Binh Long-Tay Ninh Transmission Line Draft Initial Environmental Examination Initial Environmental Examination Jun 2015
Power Transmission Investment Program - Tranche 3: Vung Tau Substation Draft Resettlement Plan Resettlement Plans Jun 2015
Power Transmission Investment Program - Tranche 3: Binh Long-Tay Ninh Transmission Line (Tay Ninh Segment) Draft Combined Resettlement and Ethnic Minority Development Plan Combined Resettlement Plan and Indigenous Peoples Plans Jun 2015
Power Transmission Investment Program - Tranche 3: Tra Vinh Substation Draft Initial Environmental Examination Initial Environmental Examination Jun 2015
Power Transmission Investment Program - Tranche 3: Duc Hoa 500kV Substation Draft Initial Environmental Examination Initial Environmental Examination Jun 2015
Power Transmission Investment Program - Tranche 3: Chon Thanh Substation Draft Resettlement Plan Resettlement Plans Jun 2015
Power Transmission Investment Program - Tranche 3: My Tho Substation Draft Resettlement Due Diligence Report and Corrective Action Plan Safeguards Due Diligence Reports Jun 2015
Power Transmission Investment Program - Tranche 3: 220kV Uyen Hung Substation Draft Initial Environmental Examination Initial Environmental Examination Jun 2015
Power Transmission Investment Program - Tranche 3: Vung Tau Substation Draft Initial Environmental Examination Initial Environmental Examination Jun 2015
Power Transmission Investment Program - Tranche 3: My Tho-Duc Hoa Transmission Line (Long An Segment) Draft Resettlement Plan Resettlement Plans Jun 2015
Power Transmission Investment Program - Tranche 3: Binh Long-Tay Ninh Transmission Line (Binh Phuoc Segment) Draft Combined Resettlement and Ethnic Minority Development Plan Combined Resettlement Plan and Indigenous Peoples Plans Jun 2015
Power Transmission Investment Program - Tranche 3: Ba Ria-Vung Tau Transmission Line Draft Resettlement Due Diligence Report and Corrective Action Plan Safeguards Due Diligence Reports May 2015
Power Transmission Investment Program - Tranche 3: Tra Vinh Substation Draft Resettlement Due Diligence Report and Corrective Action Plan Safeguards Due Diligence Reports Mar 2015
Power Transmission Investment Program - Tranche 3: Cau Bong Substation Draft Resettlement Due Diligence Report and Corrective Action Plan Safeguards Due Diligence Reports Mar 2015
Power Transmission Investment Program - Tranche 3: 220kV Duc Hoa Substation Draft Resettlement Due Diligence Report and Corrective Action Plan Safeguards Due Diligence Reports Mar 2015
Power Transmission Investment Program - Tranche 3: Uyen Hung Substation Draft Resettlement Due Diligence Report and Corrective Action Plan Safeguards Due Diligence Reports Mar 2015


Related Publications

None currently available.


The Access to Information Policy (AIP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.

Requests for information may also be directed to the InfoUnit.

Tenders

Tender Title Type Status Posting Date Deadline
3374-VIE: Power Transmission Investment Program, Tranche 3 [CT-G02] Invitation for Bids Closed
3374-VIE: Power Transmission Investment Program, Tranche 3 [CT-G01] Invitation for Bids Closed
3374-VIE: Power Transmission Investment Program, Tranche 3 [CT-W01] Invitation for Bids Closed
National Safeguard Specialist for Resettlement (new) Individual - Consulting Closed
L3374-VIE: MFF Power Transmission Investment Program, Tranche 3 [ADB-SPMB/DH-G12&SHDH-G17/IFB] Invitation for Bids Closed
L3374-VIE: MFF Power Transmission Investment Program Tranche 3 [DH-G14] Invitation for Bids Closed
3374-VIE: Power Transmission Investment Program, Tranche 3 [BLTN-G02] Invitation for Bids Closed
L3374-VIE: MFF Power Transmission Investment Program, Tranche 3 [BLTN-G01] Invitation for Bids Closed
L3374-VIE: MFF Power Transmission Investment Program, Tranche 3 [DH-W16] Invitation for Bids Closed
L3374-VIE: MFF Power Transmission Investment Program, Tranche 3 [DH-W17] Invitation for Bids Closed
L3374-VIE: MFF Power Transmission Investment Program, Tranche 3 [DH-W18] Invitation for Bids Closed
L3374-VIE: Power Transmission Investment Program, Tranche 3 [BLTN-W01] Invitation for Bids Closed
L3374-VIE: MFF Power Transmission Investment Program, Tranche 3 [MTDH-G07] Invitation for Bids Closed
L3374-VIE: Power Transmission Investment Program - Tranche 3[ADB-SPMB/DH-G11/IFB: Supply of Power transformer for Project: 500kV Duc Hoa substation and Connections.] Invitation for Bids Closed
L3374-VIE: Power Transmission Investment Program - Tranche 3[ST-G01 (CB): Supply of 500kV Auto-transformer for 500kV Cau Bong Substation.] Invitation for Bids Closed
3374-VIE: Power Transmission Investment Program - Tranche 3[DH-G13: Supply of steel towers for transmission line of 500kV Duc Hoa substation and connections.] Invitation for Bids Closed
42039-036 -Power Transmission Investment Program, Tranche 3 Advance Notice Archived

Contracts Awarded

Contract Title Approval Number Contract Date Contractor | Address Executing Agency Total Contract Amount (US$) Contract Amount Financed by ADB (US$)
CT-G01: SUPPLY AND TRANSPORTATION OF 500KV AND 220 KV TRANSFORMERS Loan 3374 25 Mar 2019 TOSHIBA TRANSMISSION & DISTRIBUTION SYSTEMS | THANG LONG INDUSTRIAL PARK, VONG LA COMM DONG ANH, HANOI, VIETNAM VIET NAM,SOC REP OF National Power Transmission Corporation 6,200,726.66 6,107,557.73
CT-G02:SUPPLY OF EQUIPMENT AND MATERIALS FOR SUBSTATION AND CONNECTIONS (LOT1) Loan 3374 03 May 2019 YOTEK-GE CONSORTIUM. | VIETNAM VIET NAM,SOC REP OF VIET NAM,SOC REP OF National Power Transmission Corporation 8,369,116.44 8,159,289.40
CT G02: SUPPLY OF EQUIPMENT AND MATERIALS FOR SUBSTATION AND CONNECTIONS Loan 3374 10 May 2019 APPLIED TECHNICAL SYSTEMS JSC | HANOI, VIETNAM VIET NAM,SOC REP OF National Power Transmission Corporation 2,207,727.27 2,038,176.76
CT-W01: CONSTRUCTION AND INSTALLATION SUBSTATION F O THE 500KV CHON THANH SUBSTATION AND CONNECTIONS SUBPROJECT - LOT 1.1 Loan 3374 16 Nov 2018 POWER CONSTRUCTION JSC NO. 1 | 18 LY VAN PHUC STREET, DONG DA DISTRICT, HANOI VIET NAM,SOC REP OF National Power Transmission Corporation 9,522,992.00 8,652,065.00
CT-W01: CONSTRUCTION AND INSTALLATION OF TRANSMISS ION LINE (INCLUDING SUPPLY OF STEEL TOWERS)-LOT1.2 Loan 3374 16 Nov 2018 SONG DA 11 THANG LONG ONE MEMBER CO. LTD. | BT3, VT24, XA LA RESIDENTIAL AREA, PHUC LA WARD, HA DONG DISTRICT, HANOI VIET NAM,SOC REP OF National Power Transmission Corporation 4,138,938.00 3,760,410.00
BLTN-G02: SUPPLY AND TRANSPORTATION OF PRIMARY EQU IPMENT, CONDUCTORS, EARTH-WIRES, INSULATORS, OPGW AND FITTINGS. Loan 3374 27 Mar 2018 VARIOUS | VARIOUS VIET NAM,SOC REP OF National Power Transmission Corporation 4,462,361.00 4,443,653.00
DH-G12&SHDH-G17: SUPPLY PRIMARY EQUIPMENT; SUPPLY AND INSTALLATION CONTROL SYSTEM, PROTECTION SYSTEM , AND MEASUREMENT SYSTEM, COMMUNICATION SYSTEM Loan 3374 29 Mar 2018 CONSORTIUM SIEMENS - EDH | VIET NAM VIET NAM,SOC REP OF National Power Transmission Corporation 7,382,917.00 7,087,121.00
MTDH-G07: SUPPLY OF CONDUCTORS, EARTHWIRES, INSULA TORS, OPGW, FITTINGS FOR 220KV AND 500KV CONNECTIO NS AND PRIMARY EQUIPMENT Loan 3374 21 Feb 2018 CONSORTIUM COMIN ASIA PTE., LTD. / COMIN VN | SINGAPORE SINGAPORE National Power Transmission Corporation 6,878,764.00 6,841,236.00
DH W17: CONSTRUCTION OF 220KV TRANSMISSION LINE NO 1 FOR 500KV DUC HOA SUBSTATION AND CONNECTIONS SU BPROJECT Loan 3374 27 Dec 2017 JV: IEC - INCO - RECO JOINT VENTURE | VIETNAM VIET NAM,SOC REP OF VIET NAM,SOC REP OF National Power Transmission Corporation 6,318,287.00 5,744,404.00
DH-G14: SUPPLY OF CONDUCTORS, EARTHWIRES, INSULATO RS, OPGW AND ACCESSORIES FOR 220KV - 500KV TRANSMI SSION LINES Loan 3374 22 Dec 2017 THIPHA - CADIVI CONSORTIUM | VIETNAM VIET NAM,SOC REP OF National Power Transmission Corporation 5,494,399.00 5,140,502.00
DH-W16: CONSTRUCTION OF 500KV TRANSMISSION LINE FO R 500KV DUC HOA SUBSTATION AND CONNECTIONS SUBPROJ ECT Loan 3374 27 Dec 2017 JV: PACIFIC-LICOGI 16 | VIETNAM VIET NAM,SOC REP OF National Power Transmission Corporation 5,478,249.00 4,980,665.00
DH-W18: CONSTRUCTION OF 220KV TRANSMISSION LINE NO 2 FOR 500KV DUC HOA SUBSTATION AND CONNECTIONS SU BPROJECT- LOT 1 Loan 3374 27 Dec 2017 VNECO | VIETNAM VIET NAM,SOC REP OF National Power Transmission Corporation 4,939,013.00 4,490,408.00
DH-W18: CONSTRUCTION OF 220KV TRANSMISSION LINE NO 2 FOR 500KV DUC HOA SUBSTATION AND CONNECTIONS SU BPROJECT- LOT 2 Loan 3374 27 Dec 2017 SONG DA 11 | VIETNAM VIET NAM,SOC REP OF National Power Transmission Corporation 5,356,649.00 4,870,110.00
BLTN-G01: SUPPLY AND TRANSPORATION OF STEEL TOWERS FOR 220KV BINH LONG - TAY NINH TRANSMISSION LINE Loan 3374 14 Dec 2017 THANH LONG GROUP JOINT STOCK COMPANY | VIETNAM VIET NAM,SOC REP OF National Power Transmission Corporation 4,966,759.00 4,516,428.00
BLTN-W01 PACKAGE: CONSTRUCTION OF 220KV BINH LONG- TAY NINH TRANSMISSION LINE AND BAY EXTENSION Loan 3374 27 Dec 2017 POWER CONSTRUCTION JOINT STOCK COMPANY 1 | VIETNAM VIET NAM,SOC REP OF National Power Transmission Corporation 9,331,147.00 8,483,608.00
ST-G01: SUPPLY OF 5000KV AUTO-TRANSFORMERS FOR 500 KV CAU BONG SUBSTATIONS Loan 3374 31 Oct 2017 HYUNDAI ELECTRIC & ENERGY SYSTEM CO., LTD AND | KOREA KOREA, REPUBLIC OF National Power Transmission Corporation 3,852,680.00 3,852,680.00
DH-G11: SUPPLY OF STEEL TOWERS FOR 500KV DUC HOA S UBSTATION AND CONNECTIONS SUB-PROJECT Loan 3374 31 Oct 2017 CONSORTIUM OF HYUNDAI ELECTRIC & ENERGY SYSTE | KOREA KOREA, REPUBLIC OF National Power Transmission Corporation 4,069,728.00 4,069,728.00
ST-G03: INSTALLATION OF 2ND TRANSFORMERS 500KV CAU BONG SUBSTATION, 220KV DUC HOA SUBSTATION, AND 220KV VUNG TAU SUBSTATION Loan 3374 25 Aug 2017 APPLIED TECHNICAL SYSTEMS CO., LTD. (ATS) | TRAN HUNG DAO, HA NOI, VIE VIET NAM,SOC REP OF VIET NAM,SOC REP OF National Power Transmission Corporation 1,285,909.00 1,194,646.00
DH-G13: SUPPLY OF STEEL TOWERS FOR TRANSMISSION LINE 500KV DUC HOA SUBSTATION AND CONNECTIONS LOT 3 Loan 3374 28 Aug 2017 STEEL STRUCTURE MANUFACTURE JSC VNECO.SSM | DA NANG, VIETNAM VIET NAM,SOC REP OF National Power Transmission Corporation 3,185,994.00 2,897,123.00
DH-G13: Supply of Steel Towers for Transmission Line 500kV Duc Hoa Substation and Connections Lot 1 and 2 Loan 3374 25 Aug 2017 Soc Son Mechanical and Steel JSC | sOC sON District, ha noi, vietnam VIET NAM,SOC REP OF National Power Transmission Corporation 5,385,296.00 4,894,215.00
ST-G02: Supply of Primary Equipment for 5 Substations: Extension of 500Kv Cau Bong, 220Kv Vung Tau, 220Kv Tra Vinh, 220Kv Duc Hoa and 220Kv Uyen Hung Loan 3374 21 Jun 2017 Comin Asia Pte Ltd and Comin Vietnam Ltd | Singapore and Viet Nam, Soc Rep of National Power Transmission Corporation 2,066,808.00 2,012,825.00
MTDH-G06: Supply of Steel Towers for 500Kv My Tho - Duc Hoa Transmission Line Sub-Project Loan 3374 21 Jun 2017 Steel Structure Manufacture JSC Vneco.ssm | Da Nang, Viet Nam, Soc Rep of National Power Transmission Corporation 5,127,117.00 4,174,538.00
DH-W15: Construction of 500Kv Duc Hoa Substation (Including Firefighting System, Primary and Secondary Testing and Commissioning) Loan 3374 17 May 2017 Vietnam Electricity Construction JSC | Da Nang, Viet Nam, Soc Rep of National Power Transmission Corporation 9,502,995.00 8,627,674.00
4 ICS Contracts: National Safeguard Specialist (Environment), National Safeguard Specialists (Resettlement), Independent Monitoring Experts (Resettlement) Loan 3374 21 Jun 2017 Various | Various, Viet Nam, Soc Rep of National Power Transmission Corporation 243,413.00 243,006.00
ST-W02: Construction for Extension of Vung Tau, Tra Vinh, Duc Hoa, Uyen Hung 220KV Substation Loan 3374 24 Feb 2017 Joint Venture Pcc1-Vneco-Thai Binh Duong | Vietnam Viet Nam National Power Transmission Corporation 7,623,034.33 6,864,653.56
MDTH-W08 Lot 1: Construction of Transmission Line from 500KV My Tho Substation to Position 56 (Including Extension Bays at 500KV My Tho Substation Loan 3374 31 Mar 2017 JV: Pcc1-Alp | Hanoi, Viet Nam Viet Nam National Power Transmission Corporation 736,637.87 672,477.09
CW-01/Construction of Greenfield 6-Lane Extradosed Cable Bridge Over River Ganga Near Kachchi Dargah, Patna on NH30 to Near Bidupur, Vaishali, NH103 Loan 3374 31 Mar 2017 JV Song Da No 11 JSC-Iec JSC-Inco JSC | Ha Noi, Vietnam Viet Nam National Power Transmission Corporation 6,506,200.60 5,942,905.61
ST-W02: Construction for Extension of Vung Tau, Tra Vinh, Duc Hoa, Uyen Hung 220KV Substations Loan 3374 24 Feb 2017 Toshiba Transmission and Distribution Systems ( | Vn Viet Nam National Power Transmission Corporation 790,238.49 711,621.28
MTDH-W08 Lot 2: Construction of Transmission Line 500KV My Tho - Duc Hoa Transmission Line Loan 3374 24 Feb 2017 E.Licogi16-Licogi16 | Hanoi, Vietnam Viet Nam National Power Transmission Corporation 1,265,323.99 1,152,818.22

Procurement Plan

Title Document Type Document Date
Power Transmission Investment Program - Tranche 3: Procurement Plan Procurement Plans Aug 2017