Viet Nam: Strengthening Water Management and Irrigation Systems Rehabilitation Project

Sovereign Project | 42080-013 Status: Active

Summary

ADB is helping rehabilitate one of Viet Nam's oldest and largest irrigation and drainage systems located in the heart of the Red-Thai Binh river basin. The project will improve the Bac Hung Hai irrigation and drainage system. It will also help build a campus for Water Resources University, the only university in Viet Nam with a full program of subjects necessary to educate water engineers.

Latest Project Documents

Consulting Notices See also: CMS

No notices are currently available for this project.

Procurement Notices See also: Operational Procurement

No notices are currently available for this project.

Procurement Documents


Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.

The Public Communications Policy (PCP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.

The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.

In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

 
Project Name Strengthening Water Management and Irrigation Systems Rehabilitation Project
Project Number 42080-013
Country Viet Nam
Project Status Active
Project Type / Modality of Assistance Loan
Source of Funding / Amount
Loan 2636-VIE: Strengthening Water Management and Irrigation Systems Rehabilitation Project
Asian Development Fund US$ 100.00 million
Loan: Strengthening Water Management and Irrigation Systems Rehabilitation Project
Agence Francaise de Developpement US$ 28.00 million
Strategic Agendas Inclusive economic growth
Drivers of Change Governance and capacity development
Partnerships
Sector / Subsector

Agriculture, natural resources and rural development - Irrigation - Rural water policy, institutional and capacity development

Education - Tertiary

Gender Equity and Mainstreaming
Description

The project is designed to address two binding constraints that contribute to the core sector problem of poor quality and delivery of water-related services. These constraints are insufficient human resource capacity and inadequate public infrastructure. The project will address these constraints by funding education facilities to train engineers in water-related fields that are needed to meet the heightened demands of a rapidly growing economy. The project will also address the requirements of dilapidated irrigation and drainage infrastructure with funding to upgrade and modernize the management of irrigation canal systems. It will help the government increase the number of qualified agriculturerelated

water management engineers, improve the governance and management of irrigation systems, increase agricultural production, and improve the productivity of project areas to

increase poor farmers' incomes and reduce poverty.

Project Rationale and Linkage to Country/Regional Strategy Irrigated agriculture is by far the largest user of water in Viet Nam. Paddy rice is the dominant crop, accounting for more than 80% of the total irrigated area. However, the area of paddy land has decreased in recent years with diversification to aquaculture and other crops and economic growth sectors other than agriculture. This has increased the demands placed on water resources and caused reallocation. To meet growing demand for rice and maintain food security, it is essential to increase crop productivity and the efficiency of production inputs, especially water.
Impact

Project Outcome

Description of Outcome Quality of MARD's water-related services strengthened
Progress Toward Outcome It is too early to assess the project impact and outcome.
Implementation Progress
Description of Project Outputs

Increased human resource capacity for sustainable water management

Increased capacity of irrigation and drainage infrastrucure in the BHH irrigation and drainage system

Strengthened institutional capacity of water-related service providers in the BHH irrigation and drainage system

Project management is operational

Status of Implementation Progress (Outputs, Activities, and Issues)

Output 1: Construction of WRU component commenced on 15 Mar 2014. Up to now, 50% of the work have been completed.

Output 2: 10 civil works subprojects commenced as of Q3/2014. All the civil works are going to complete by June 2016.

Output 3: A list of 88 among 155 proposed irrigation schemes in 14 communes as well as the procurement plan have been approved by MARD in September and October 2015.

Output 4: Ongoing.

Geographical Location Red River Delta in northern Viet Nam, including part or all of the provinces of Bach Ninh, Hung Yen and Hai Duong east and southeast of Ha Noi.

Safeguard Categories

Environment B
Involuntary Resettlement A
Indigenous Peoples C

Summary of Environmental and Social Aspects

Environmental Aspects Semiannual monitoring reports of BHH and WRU components were submitted and reviewed by ADB. According to the annual monitoring report and through environment review during site visits, the mission found that the project has achieved close cooperation among PPMUs, Construction Supervision Consultants (CSCs), local authorities and communities in monitoring and supervision of environment impacts and safety of construction and transport. However there are some common environment pending issues including improper management of excavated soil, inadequate water spraying for reducing dust caused by project transport, especially at the construction works near the National Road No. 38 and provincial road No. 61, and inadequate protective equipment provided for workers.
Involuntary Resettlement

The project includes 12 civil works subprojects, of which 10 cause acquisition of land from 1,672 affected households (AH) with 691 severely affected households losing more than 10% of agricultural land and 9 relocated households. Total compensation costs of the project are estimated at about $10.9 million and are paid by the Government.

The project is satisfactory in complying with the resettlement safeguards covenants. For the WRU subproject, all the identified remaining affected graves have been compensated and relocated. Compensation payments following the provisions in the approved RPs have been completed.

Indigenous Peoples The project area does not include any indigenous populations
Stakeholder Communication, Participation, and Consultation
During Project Design
During Project Implementation

Business Opportunities

Consulting Services All consultants to be financed under the ADB loan will be recruited in accordance with ADB's Guidelines on the Use of Consultants (2007, as amended from time to time). The Project will require 236 person-months of national and 56 person-months of international consultants. An international firm of consultants will be recruited to strengthen national capacity and provide assistance with project implementation. National consultants will also be recruited for preparation of detailed designs and resettlement plans, and for independent external monitoring of the implementation of resettlement plans and environment management plans. Various selection methods will be applied for the recruitment of consultant firms including the quality- and cost-based selection (QCBS) method with a standard quality:cost ratio of 80:20, consultant quality selection (CQS) method, and fixed budget selection (FBS) method. Individual consultants will be engaged following ADB procedures for selection of individual consultants as described in the Guidelines on the Use of Consultants. Where 3 or more experts are required, recruitment of a firm will be the applied approach, rather than recruitment of individual consultants. All consulting packages will be advertised by MARD at the ADB website through the Consulting Services Recruitment Notice.
Procurement All procurement under the ADB loan will be undertaken in accordance with ADB's Procurement Guidelines (2007, as amended from time to time). Procurement under the AFD loan will follow AFD's procurement guidelines. International competitive bidding (ICB) procedures will be applied for the construction of the WRU facilities and major BHH construction packages. For the BHH infrastructure component, separate packages will be bid out for the construction or rehabilitation of different pump stations in the three provinces, each of which will be managed either by the CPO or the respective provincial PMU depending on the size, complexity and regional importance. The Co Ngua pump station will be procured through a turnkey contract to be managed by CPO under which the detailed design, civil works, and supply and installation of equipment are provided through a single contract. Turnkey and civil works contracts estimated to cost more than $2 million equivalent will be procured through ICB. Civil works contracts estimated to cost $2 million or less will be procured through national competitive bidding (NCB) procedures. Supply of goods will be procured through ICB where the cost is more than $1 million; NCB where the cost is $100,000 to $1 million per package; and shopping where the cost is less than $100,000. For the procurement of items below $10,000, the EA may purchase the items directly from the supplier.

Responsible Staff

Responsible ADB Officer Huong Khuc
Responsible ADB Department Southeast Asia Department
Responsible ADB Division Viet Nam Resident Mission
Executing Agencies
Ministry of Agriculture and Rural Development
Mr. Pham Dinh Van
VAN_CPO@YAHOO.COM.VN
Central Project Office_(CPO)
23 Hang Tre St.
Hanoi, Viet Nam

Timetable

Concept Clearance 26 Jan 2011
Fact Finding 02 Nov 2009 to 13 Nov 2009
MRM 09 Dec 2009
Approval -
Last Review Mission -
PDS Creation Date 06 Oct 2008
Last PDS Update 29 Mar 2016

Loan 2636-VIE

Milestones
Approval Signing Date Effectivity Date Closing
Original Revised Actual
20 Apr 2010 07 Sep 2010 19 Jan 2011 31 Dec 2016 - -
Financing Plan Loan Utilization
Total (Amount in US$ million) Date ADB Others Net Percentage
Project Cost 153.23 Cumulative Contract Awards
ADB 100.00 20 Apr 2010 81.82 0.00 87%
Counterpart 25.23 Cumulative Disbursements
Cofinancing 28.00 20 Apr 2010 60.82 0.00 65%
Status of Covenants
Category Sector Safeguards Social Financial Economic Others
Rating - - - - - Satisfactory

Safeguard Documents See also: Safeguards

Safeguard documents provided at the time of project/facility approval may also be found in the list of linked documents provided with the Report and Recommendation of the President.

Title Document Type Document Date
Strengthening Water Management and Irrigation Systems Rehabilitation Project - Doan Thuong Pumping Station Additional Works: Resettlement Plan Resettlement Plans Jun 2016
Strengthening Water Management and Irrigation Systems Rehabilitation Project - Nhat Trai Pumping Station Additional Works: Resettlement Plan Resettlement Plans Jun 2016
Strengthening Water Management and Irrigation Systems Rehabilitation Project: Nghi Xuyen Subproject Updated Resettlement Plan Resettlement Plans Apr 2016
SWMISRP Component 1: Construction of New Education Facilities for Water Resources University Environmental Monitoring Report Environmental Monitoring Reports Oct 2015
SWMISRP Component 2: Construction and Rehabilitation of Bac Hung Hai Irrigation and Drainage Infrastructure Environmental Monitoring Report Environmental Monitoring Reports Oct 2015
Strengthening Water Management and Irrigation Systems Rehabilitation Project-Component 1: Construction of New Education Facilities for Water Resources University Environmental Monitoring Report Environmental Monitoring Reports Mar 2015
Strengthening Water Management and Irrigation Systems Rehabilitation Project-Component 2: Construction and Rehabilitation of Bac Hung Hai Irrigation and Drainage Infrastructure Environmental Monitoring Report Environmental Monitoring Reports Mar 2015
Strengthening Water Management and Irrigation Systems Rehabilitation Project: External Resettlement Monitoring Report Social Monitoring Reports Dec 2014
Strengthening Water Management and Irrigation Systems Rehabilitation Project-Component 1: Construction of New Education Facilities for Water Resources University Environmental Monitoring Report Environmental Monitoring Reports Aug 2014
Strengthening Water Management and Irrigation Systems Rehabilitation Project-Component 2: Construction and Rehabilitation of Bac Hung Hai Irrigation and Drainage Infrastructure Environmental Monitoring Report Environmental Monitoring Reports Aug 2014
Strengthening Water Management and Irrigation Systems Rehabilitation Project - Co Ngua Pumping Station in Hai Duong Province: Resettlement Monitoring Report Social Monitoring Reports Jul 2014
Strengthening Water Management and Irrigation Systems Rehabilitation Project: External Resettlement Monitoring Report (June 2014) Social Monitoring Reports Jun 2014
Strengthening Water Management and Irrigation Systems Rehabilitation Project - Component 1: Construction of New Education Facilities for Water Resources University (March-May 2014) Environmental Monitoring Reports May 2014
Strengthening Water Management and Irrigation Systems Rehabilitation Project - Component 2: Construction and Rehabilitation of Bac Hung Hai Irrigation and Drainage Infrastructure (March-May 2014) Environmental Monitoring Reports May 2014
Strengthening Water Management and Irrigation Systems Rehabilitation Project - Component 1: Construction of New Education Facilities for Water Resources University (October 2013 - March 2014) Environmental Monitoring Reports Mar 2014
Strengthening Water Management and Irrigation Systems Rehabilitation Project - Component 2: Construction and Rehabilitation of Bac Hung Hai Irrigation and Drainage Infrastructure (October 2013 - March 2014) Environmental Monitoring Reports Mar 2014
Strengthening Water Management and Irrigation Systems Rehabilitation Project - Component 1: Construction of New Education Facilities for Water Resources University (May-October 2013) Environmental Monitoring Reports Oct 2013
Strengthening Water Management and Irrigation Systems Rehabilitation Project - Component 2: Construction and Rehabilitation of Bac Hung Hai Irrigation and Drainage Infrastructure (May-October 2013) Environmental Monitoring Reports Oct 2013
Strengthening Water Management and Irrigation Systems Rehabilitation Project: Nghi Xuyen Pumping Station Resettlement Monitoring Report No. 3 Social Monitoring Reports Oct 2013
Strengthening Water Management and Irrigation Systems Rehabilitation Project: Water Resources University Resettlement Monitoring Report No. 3 Social Monitoring Reports Oct 2013
Strengthening Water Management and Irrigation Systems Rehabilitation Project: Phu My Pumping Station Resettlement Monitoring Report No. 3 Social Monitoring Reports Oct 2013
Strengthening Water Management and Irrigation Systems Rehabilitation Project: Doan Thuong Pumping Station Resettlement Monitoring Report No. 3 Social Monitoring Reports Oct 2013
Strengthening Water Management and Irrigation Systems Rehabilitation Project: Cau Dua Pumping Station Resettlement Monitoring Report No. 3 Social Monitoring Reports Oct 2013
Strengthening Water Management and Irrigation Systems Rehabilitation Project: Nhat Trai Pumping Station Resettlement Monitoring Report No. 3 Social Monitoring Reports Oct 2013
Strengthening Water Management and Irrigation Systems Rehabilitation Project: Chua Tong Pumping Station Resettlement Monitoring Report No. 3 Social Monitoring Reports Oct 2013
Strengthening Water Management and Irrigation Systems Rehabilitation Project: Lien Nghia Pumping Station Resettlement Monitoring Report No. 3 Social Monitoring Reports Oct 2013
Strengthening Water Management and Irrigation Systems Rehabilitation Project: Lien Nghia Pumping Station in Hung Yen Province Resettlement Monitoring Report No. 2 Social Monitoring Reports May 2013
Strengthening Water Management and Irrigation Systems Rehabilitation Project: Water Resources University in Hung Yen Province Resettlement Monitoring Report No. 2 Social Monitoring Reports May 2013
Strengthening Water Management and Irrigation Systems Rehabilitation Project: Nhat Trai Pumping Station in Bac Ninh Province Resettlement Monitoring Report No. 2 Social Monitoring Reports May 2013
Strengthening Water Management and Irrigation Systems Rehabilitation Project: Chua Tong Pumping Station in Hung Yen Province Resettlement Monitoring Report No. 2 Social Monitoring Reports May 2013
Strengthening Water Management and Irrigation Systems Rehabilitation Project: Phu My Pumping Station in Bac Ninh Province Resettlement Monitoring Report No. 2 Social Monitoring Reports May 2013
Strengthening Water Management and Irrigation Systems Rehabilitation Project: Cau Dua Pumping Station in Hai Duong Province Resettlement Monitoring Report No. 2 Social Monitoring Reports May 2013
Strengthening Water Management and Irrigation Systems Rehabilitation Project: Doan Thuong Pumping Station in Hai Duong Province Resettlement Monitoring Report No. 2 Social Monitoring Reports May 2013
Strengthening Water Management and Irrigation Systems Rehabilitation Project Environmental Monitoring Reports Mar 2013
Strengthening Water Management and Irrigation Systems Rehabilitation Project: Lien Nghia Pumping Station in Hung Yen Province Resettlement Monitoring Report No. 1 Social Monitoring Reports Dec 2012
Strengthening Water Management and Irrigation Systems Rehabilitation Project: The Water Resources University Subproject - Hung Yen Province Resettlement Monitoring Report No. 1 Social Monitoring Reports Dec 2012
Strengthening Water Management and Irrigation Systems Rehabilitation Project: Phu My Pumping Station in Bac Ninh Province Resettlement Monitoring Report No. 1 Social Monitoring Reports Dec 2012
Strengthening Water Management and Irrigation Systems Rehabilitation Project: Nghi Xuyen Pumping Station in Hung Yen Province Resettlement Monitoring Report No. 1 Social Monitoring Reports Dec 2012
Strengthening Water Management and Irrigation Systems Rehabilitation Project: Nhat Trai Pumping Station in Bac Ninh Province Resettlement Monitoring Report No. 1 Social Monitoring Reports Dec 2012
Strengthening Water Management and Irrigation Systems Rehabilitation Project: Cau Dua Pumping Station in Hai Duong Province Resettlement Monitoring Report No. 1 Social Monitoring Reports Dec 2012
Strengthening Water Management and Irrigation Systems Rehabilitation Project: Chua Tong Pumping Station in Hung Yen Province Resettlement Monitoring Report No. 1 Social Monitoring Reports Dec 2012
Strengthening Water Management and Irrigation Systems Rehabilitation Project: Doan Thuong Pumping Station in Hai Duong Province Resettlement Monitoring Report No. 1 Social Monitoring Reports Dec 2012
Strengthening Water Management and Irrigation Systems Rehabilitation Project: Resettlement Plan for New Construction of Water Resources University in Hung Yen Province Resettlement Plans Nov 2012
Strengthening Water Management and Irrigation Systems Rehabilitation Project: Updated Resettlement Plan for New Construction of Water Resources University in Hung Yen Province Resettlement Plans Nov 2012
Strengthening Water Management and Irrigation Systems Rehabilitation Project: Resettlement Plan for Nhat Trai Pumping Station Subproject Resettlement Plans Nov 2012
Strengthening Water Management and Irrigation Systems Rehabilitation Project: Updated Resettlement Plan for Nghi Xuyen Pumping Station Resettlement Plans Oct 2012
Strengthening Water Management and Irrigation Systems Rehabilitation Project Resettlement Plans Oct 2012
Strengthening Water Management and Irrigation Systems Rehabilitation Project: Resettlement Plan for the Lien Nghia Pumping Station Subproject Resettlement Plans Sep 2012
Strengthening Water Management and Irrigation Systems Rehabilitation Project: Phu My Pumping Station, Bac Ninh Province Resettlement Plans Aug 2012
Strengthening Water Management and Irrigation Systems Rehabilitation Project: Updated Resettlement Plan for Chua Tong Pumping Station, Hung Yen province Resettlement Plans Aug 2012
Strengthening Water Management and Irrigation Systems Rehabilitation Project: Cau Dua and Doan Thuong Pumping Station, Hai Duong Province Resettlement Plans Jul 2012
Strengthening Water Management and Irrigation Systems Rehabilitation Project: 6th Resettlement Monitoring Report Social Monitoring Reports Jul 2012
Strengthening Water Management and Irrigation Systems Rehabilitation Project: Cau Dua and Doan Thuong Pumping Station, Hai Duong province (Updated) Resettlement Plans Jul 2012
Strengthening Water Management and Irrigation Systems Rehabilitation Project: 5th Resettlement Monitoring Report Social Monitoring Reports Apr 2012
Strengthening Water Management and Irrigation Systems Rehabilitation Project Environmental Assessment and Measures Dec 2009

Evaluation Documents See also: Independent Evaluation

None currently available.

Related Publications

None currently available.


The Public Communications Policy (PCP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.

Requests for information may also be directed to the InfoUnit.