IND: GUJARAT PAGUTHAN WIND ENERGY FINANCING FACILITY (Samana Phase-I Project)

Project Rationale and Linkage to Country/Regional Strategy

The loan is consistent with ADB s India Country Partnership Strategy (CPS), which emphasizes infrastructure development, private sector participation, and renewable energy development in the country. Specifically in the power sector, policy dialogue by the South Asia Regional Department has focused on: (i) supporting sector reform and restructuring; (ii) enhancing energy efficiency and clean energy development; and (iii) promoting balanced physical infrastructure development. The ADB loan is in line with these strategies and dovetails efforts including ongoing dialogues with the Government under public sector operations. The Project has been contributing in meeting the significant energy and power shortages in the state of Gujarat. The loan is consistent with ADB s energy sector policy. It also forms a part of ADB s clean energy and environment program, which was launched in response to the communique by the Group of 8 Gleneagles Summit in July 2005. ADB s energy policy states that ADB will promote the development of renewable energy sources in developing member countries, and that ADB will also assist in implementing such projects, preferably through private sector involvement to ensure their sustainable long term operations. The clean energy and environment program includes implementation of renewable energy investment opportunities. The Project may also benefit from assistance from ADB s Asia Pacific Carbon Fund for upfront financing of future revenues from certified emission reduction units (CERs).

Status of Development Objectives

The project is meeting the development objectives as stated above.

Safeguard Categories

Environment: B
Involuntary Resettlement: C
Indigenous Peoples: C

Summary of Environmental and Social Aspects

The implementation of the environmental management plan and monitoring arrangements have minimized and mitigated the impact of environmental disturbance during construction and operation. The construction of the wind farm involved only minor civil, mechanical, and electrical works, mainly for construction of the wind tower footing, which took place in several small sites, scattered over a wide area. During operations, wind turbine generators (WTGs) do not generate gas or dust emissions. The WTGs are located in uninhabited areas, not suitable for agriculture. The construction and operation of the project did not entail any displacement (physical or economic) nor has it affected any existing structures. The project construction also did not entail any impact on indigenous people.

Stakeholder Participation and Consultation

Separate public consultations have been carried out for the wind power project. A number of awareness camps have been conducted covering various settlements in the vicinity of the project areas to inform local communities about these projects. Local communities have demonstrated good understanding of the nature and scope of wind energy projects and have been assured that the wind farms would have no significant environmental and social impacts.

Project Sponsor

GUJARAT PAGUTHAN ENERGY CORPORATION PRIVATE LIMITED



Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.

Project Data Sheets (PDS)

Timetable

Concept Clearance
17 Dec 2007

Due Diligence Mission
07 Jan 2008 to 11 Jan 2008

Private Sector Credit Committee Meeting
12 Mar 2008

Board Approval
17 Apr 2008