- About ADB
- News & Events
- Data & Research
- Publications
-
Focus Areas
-
Sectors
- Agriculture
- Education
- Energy
- Finance
- Health
- Industry and Trade
- Information and Communication Technology
- Public Sector Management
- Social Protection
- Transport
- Water
-
- Projects
-
Countries
-
Subregional Programs
- Brunei Darussalam-Indonesia-Malaysia-Philippines East ASEAN Growth Area (BIMP-EAGA)
- Central Asia Regional Economic Cooperation (CAREC)
- Greater Mekong Subregion (GMS)
- Indonesia-Malaysia-Thailand Growth Triangle (IMT-GT)
- South Asia Subregional Economic Cooperation (SASEC)
-
Other Offices
- European Representative Office
- Japanese Representative Office
- North American Representative Office
- Pacific Liaison and Coordination Office
- Pacific Subregional Office
-
Countries with Operations
- Afghanistan
- Armenia
- Azerbaijan
- Bangladesh
- Bhutan
- Cambodia
- China, People's Republic of
- Cook Islands
- Fiji
- Georgia
- India
- Indonesia
- Kazakhstan
- Kiribati
-
43281-012: Preparing Hydropower Development for Energy Crisis
Project Data Sheet (PDS): Overview
Description
A project preparatory TA (the PPTA) will be attached to the Detailed Engineering Study mainly to promote project structuring and safeguard requirements as the Study covers only technical aspects. To improve overall project preparedness for complex hydropower development, the PPTA will conduct thorough due diligence and concrete preparatory works mainly for financial structuring, institutional setup, safeguard planning and advance actions, and bid documentation... Read More
| Country |
Nepal |
|---|---|
| Project Number | 43281-012 |
| Project Type or Modality of Assistance |
Technical Assistance |
| Financing | Public sector (Sovereign) |
| Status | Approved |
| Approval Number |
TA No. 7590 |
| Approval Date | 02 Sep 2010 |
| Sector / Subsector Classification |
Energy / Large Hydropower |
| Thematic Classification | Economic growth Environmental sustainability Private sector development Social development |
| Gender Mainstreaming Categories | Some gender benefits |
Related Projects
Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.
The Public Communications Policy (PCP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.
The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.
In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
Responsible ADB Officer
Kaoru Ogino
Email contact form
Responsible ADB Department
South Asia Department
Responsible ADB Divisions
Energy Division, SARD
Executing Agencies
Nepal Electricity Authority
PDS Creation Date
18 Oct 2010
Last PDS Update
05 Mar 2013