43281-012: Preparing Hydropower Development for Energy Crisis

Project Data Sheet (PDS): Overview


Description

A project preparatory TA (the PPTA) will be attached to the Detailed Engineering Study mainly to promote project structuring and safeguard requirements as the Study covers only technical aspects. To improve overall project preparedness for complex hydropower development, the PPTA will conduct thorough due diligence and concrete preparatory works mainly for financial structuring, institutional setup, safeguard planning and advance actions, and bid documentation... Read More

Country Nepal
Project Number 43281-012
Project Type or Modality of Assistance Technical Assistance
Financing Public sector (Sovereign)
Status Approved
Approval Number TA No. 7590
Approval Date 02 Sep 2010
Sector / Subsector Classification Energy
/ Large Hydropower
Thematic Classification Economic growth
Environmental sustainability
Private sector development
Social development
Gender Mainstreaming Categories Some gender benefits

Related Projects

 

 

Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.

The Public Communications Policy (PCP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.

The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.

In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Project Data Sheets (PDS)

Responsible ADB Officer
Kaoru Ogino
Email contact

Responsible ADB Department
South Asia Department

Responsible ADB Divisions
Energy Division, SARD

Executing Agencies
Nepal Electricity Authority

PDS Creation Date
18 Oct 2010

Last PDS Update
14 Apr 2014