A project preparatory technical assistance (PPTA) for the proposed project will (i) conduct due diligence (i.e., technical, economic, social and poverty and environmental assessments), cost estimation and development of a procurement plan of civil works for navigational aids (navaids) improvement; (ii) conduct technical assessments, cost estimation and development of a procurement plan of goods, equipment and survey related to safety information infrastructure, including automatic identification system and meteorological sensors and hydrographic charts; (iii) analyze the National Maritime Safety Authority (NMSA) and other stakeholders including communities and ship operators to identify required actions to strengthen their operation and technical capacity and thus safety and environmental protection in Papua New Guinea (PNG).

Latest Project Documents


Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.

The Public Communications Policy (PCP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.

The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.

In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Project Name Maritime and Waterways Safety Project
Project Number 44375-012
Country Papua New Guinea
Project Status Closed
Project Type / Modality of Assistance Technical Assistance
Source of Funding / Amount
TA 7869-PNG: Maritime and Waterways Safety Project
Japan Fund for Poverty Reduction US$ 600,000.00
Strategic Agendas Inclusive economic growth
Drivers of Change Governance and capacity development
Sector / Subsector Transport - Transport policies and institutional development - Water transport (non-urban)
Gender Equity and Mainstreaming Effective gender mainstreaming
Description A project preparatory technical assistance (PPTA) for the proposed project will (i) conduct due diligence (i.e., technical, economic, social and poverty and environmental assessments), cost estimation and development of a procurement plan of civil works for navigational aids (navaids) improvement; (ii) conduct technical assessments, cost estimation and development of a procurement plan of goods, equipment and survey related to safety information infrastructure, including automatic identification system and meteorological sensors and hydrographic charts; (iii) analyze the National Maritime Safety Authority (NMSA) and other stakeholders including communities and ship operators to identify required actions to strengthen their operation and technical capacity and thus safety and environmental protection in Papua New Guinea (PNG).
Project Rationale and Linkage to Country/Regional Strategy NMSA has identified navaids mainly along coastlines including 137 light structures and 162 small day-markers and light beacons, to be improved and installed to scale up the safe and efficient environment for maritime and waterways transport. NMSA also requires an improved transport control, monitoring and surveillance system (i.e., automatic identification system), meteorological sensors and wide coverage of hydrographic charts to reduce the risk of accidents, loss of lives and negative environmental impacts, and the costs of shipping services as traffic volume increased. To operate the new systems and expand the charts, it is necessary for NMSA to upgrade technical and management skills, while NMSA is in the process of establishing systems for more rigorous and quantitative monitoring. The proposed project to respond to those requirements is expected to produce benefits for remote rural population, as well as for national and international populations, by improving the environment for safe and efficient shipping services, including those of the franchise shipping scheme under the ongoing and upcoming community water transport projects. Transport sector development, including the improvement of existing maritime and waterways transport infrastructure, is a national priority in the PNG government's Development Strategic Plan 2010-2030, and Medium-Term Development Plan 2011-2015. Transport is also a strategic priority in ADB's PNG Country Partnership Strategy 2011-2015.
Impact tbd
Project Outcome
Description of Outcome tbd
Progress Toward Outcome
Implementation Progress
Description of Project Outputs tbd
Status of Implementation Progress (Outputs, Activities, and Issues)
Geographical Location
Summary of Environmental and Social Aspects
Environmental Aspects
Involuntary Resettlement
Indigenous Peoples
Stakeholder Communication, Participation, and Consultation
During Project Design Government agencies and NMSA were consulted to develop a project concept. During PPTA, development partners and communities will be consulted to further improve the project design.
During Project Implementation TBD
Business Opportunities
Consulting Services

The PPTA will finance the services of eight international consultants for a total period of 17 person-months for the activities described in para. 2. About 5 months of counterpart staff services will be provided by the executing agency (EA), i.e., NMSA. Consultant selection will be via quality- and cost-based selection procedures with 80:20 weighting for quality and cost, respectively. ADB will engage consulting services for the PPTA in accordance with ADB's Guidelines on the Use of Consultants (2010, as amended from time to time) for the selection and engagement of international consultants.

The EA will be the NMSA. The consultants will work together with NMSA staff. The EA will provide in-kind resources through the provision of full time counterpart staff, office space and administrative support, logistics and local transport. Regular tripartite (NMSA, ADB and consultants) meetings will be held to ensure coordination.

Responsible ADB Officer Daisuke Mizusawa
Responsible ADB Department Pacific Department
Responsible ADB Division Transport, Energy and Natural Resources Division, PARD
Executing Agencies
National Maritime Safety Authority (NMSA)P.O. Box 668, Port Moresby, National
District, Papua New Guinea
Timetable
Concept Clearance -
Fact Finding -
MRM -
Approval 20 Sep 2011
Last Review Mission -
Last PDS Update 04 Oct 2011

TA 7869-PNG

Milestones
Approval Signing Date Effectivity Date Closing
Original Revised Actual
20 Sep 2011 21 Oct 2011 21 Oct 2011 20 Jun 2012 31 Dec 2012 -
Financing Plan/TA Utilization Cumulative Disbursements
ADB Cofinancing Counterpart Total Date Amount
Gov Beneficiaries Project Sponsor Others
0.00 600,000.00 200,000.00 0.00 0.00 0.00 800,000.00 20 Sep 2011 537,251.85

Safeguard Documents

See also: Safeguards

No documents found.

Evaluation Documents

See also: Independent Evaluation

No documents found.


The Public Communications Policy (PCP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.

Requests for information may also be directed to the InfoUnit.