The Ministry of Commerce, Industry and Environment is responsible for the regulation of the utilities sector, but it does not operate within a clear regulatory framework. This limits its ability to effectively perform its regulatory oversight role. For many years, electricity was free in Nauru. Metering was introduced in 2009 but electricity charges do not cover all the costs of running the utility. The utilities authority, for example, received a fuel subsidy of approximately A$6 million in 2009-2010.

Latest Project Documents


Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.

The Public Communications Policy (PCP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.

The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.

In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Project Name Regulatory and Governance Reform for Improving Water and Electricity Supply in Nauru
Project Number 45048-001
Country Nauru
Project Status Closed
Project Type / Modality of Assistance Technical Assistance
Source of Funding / Amount
TA 7873-NAU: Regulatory and Governance Reform for Improving Water and Electricity Supply in Nauru
Technical Assistance Special Fund US$ 200,000.00
Strategic Agendas Inclusive economic growth
Drivers of Change Governance and capacity development
Sector / Subsector

Energy - Energy sector development and institutional reform

Water and other urban infrastructure and services - Urban water supply

Gender Equity and Mainstreaming No gender elements
Description

The Ministry of Commerce, Industry and Environment is responsible for the regulation of the utilities sector, but it does not operate within a clear regulatory framework. This limits its ability to effectively perform its regulatory oversight role. For many years, electricity was free in Nauru. Metering was introduced in 2009 but electricity charges do not cover all the costs of running the utility. The utilities authority, for example, received a fuel subsidy of approximately A$6 million in 2009-2010.

The NUA inherited the key infrastructure and physical assets from the Nauru Phosphate Company following its restructure in 2005. However, there is no record of a formal handover. Significant investments have also been made by the government and its development partners (i.e., Australian Agency for International Development and the European Union) on NUA operations to strengthen and improve its existing infrastructure and management capacity. Nevertheless, poor management of the NUA's assets over a number of years has led to frequent power outages. This restricted phosphate processing and exports in 2011, requiring RonPhos, the phosphate export company to purchase its own generating capacity.

The Utilities Working Group was established in early 2010 to advise the government on an appropriate legal and regulatory policy framework for the utilities sector. Two studies of the utilities sector were commissioned by the government with the support of ADB staff consultancy in early 2011--one examined the economic regulation of the sector, and the other examined safety regulation. The key recommendations of the economic regulation studies are: (i) the NUA should be corporatized immediately; (ii) the NUA should be gradually commercialized through the use of performance contracts; and (iii) a private management contractor should eventually be engaged to help improve the financial and operational performance of the NUA.

Cabinet has approved the key recommendations of this study, and an Act to establish the Nauru Utilities Corporation (NUC) was enacted in June 2011. The Act commenced on 1 August 2011. The government has requested further assistance from ADB to (i) ensure the newly established NUC operates effectively; and (ii) ensure effective regulatory oversight of the utilities sector.

Project Rationale and Linkage to Country/Regional Strategy One of the key components of Nauru's national development agenda concerns restructuring the utilities sector, particularly the provision of electricity, water and fuel, which were previously provided by the former Nauru Phosphate Company and are currently provided by the Nauru Utilities Authority (NUA), an unincorporated government entity. This reform is part of its effort to restore the economic security of the nation as guided by the Nauru National Sustainable Development Strategy (NSDS) 2005-2020. The NSDS identifies the corporatization of utilities as a key economic priority under the NSDS and the Government of Nauru has requested assistance from Asian Development Bank (ADB) for the corporatization and commercialization of the NUA. This small scale capacity development technical assistance (TA) is included in ADB's Nauru Country Operations Business Plan 2012-2014 and is consistent with ADB's Pacific Approach 2010-2014.
Impact

Reduced drain on the fiscal position of the government.

Better management of infrastructure assets.

Project Outcome
Description of Outcome Improved financial and governance performance of NUC.
Progress Toward Outcome
Implementation Progress
Description of Project Outputs

Separate NUC from the government physically and in terms of accounting.

Review NUC institutional capacity and develop its business/corporate strategy.

Develop performance management system for NUC.

Status of Implementation Progress (Outputs, Activities, and Issues)
Geographical Location
Summary of Environmental and Social Aspects
Environmental Aspects
Involuntary Resettlement
Indigenous Peoples
Stakeholder Communication, Participation, and Consultation
During Project Design
During Project Implementation
Business Opportunities
Consulting Services

The TA will finance the services of international consultants for a total period of 6 person-months for (i) physical and accounting separation of NUC from the government; (ii) review NUC's institutional capacity and develop its business/corporate strategy; and (iii) develop a performance management system for NUC. The consultants will provide expertise in regulation and restructuring of public enterprises, institutional capacity development and training, operational management, and financial analysis. The consultants will be selected and engaged on an individual basis in accordance with ADB's Guidelines on the Use of Consultants (2010, as amended from time to time). The proceeds of the TA will be disbursed in accordance with the Technical Assistance Disbursement Handbook (2010, as amended from time to time). The seminars and workshops will be administered by the consultants. The government will ensure that all required counterpart staff, other human resources and support facilities will be available to the consultants in a timely manner.

The consultants will prepare and submit to the government and ADB (i) an inception report 1 month after the TA starts, including an issues paper outlining the approach, emerging factors and constraints, and a detailed TA work plan; (ii) a midterm report; and (iii) a draft final report.

Procurement Procurement under the TA will follow ADB's Procurement Guidelines (2010, as amended from time to time).
Responsible ADB Officer Milovan Lucich
Responsible ADB Department Pacific Department
Responsible ADB Division Pacific Liaison and Coordination Office in Sydney, Australia
Executing Agencies
Ministry of FinanceGovernment Building
Nauru
Timetable
Concept Clearance -
Fact Finding 21 Mar 2011 to 23 Mar 2011
MRM -
Approval 29 Sep 2011
Last Review Mission -
Last PDS Update 07 Oct 2011

TA 7873-NAU

Milestones
Approval Signing Date Effectivity Date Closing
Original Revised Actual
29 Sep 2011 - 29 Sep 2011 30 Jun 2013 - -
Financing Plan/TA Utilization Cumulative Disbursements
ADB Cofinancing Counterpart Total Date Amount
Gov Beneficiaries Project Sponsor Others
200,000.00 0.00 0.00 0.00 0.00 0.00 200,000.00 29 Sep 2011 194,321.37

Safeguard Documents

See also: Safeguards

No documents found.

Evaluation Documents

See also: Independent Evaluation

No documents found.


The Public Communications Policy (PCP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.

Requests for information may also be directed to the InfoUnit.