Uzbekistan: Samarkand Solar Power Project

Sovereign Project | 45120-004

Summary

The proposed Samarkand Solar Power Project (the Project) aims to increase renewable energy generation and reduce greenhouse gas emissions (GHG) in Uzbekistan. The Project has three main components: (i) construction of a 100 megawatt (MW) grid-connected crystalline photovoltaic (PV) power plant with single axis tracking system; (ii) institutional capacity building on solar energy, and (iii) project management and supervision support.

Latest Project Documents

Title Document Date
Samarkand Solar Power Project Sep 2013
Samarkand Solar Power Project Sep 2013

Consulting Notices

See also: CMS

No notices are currently available for this project.

Procurement Notices

See also: Operational Procurement

No notices are currently available for this project.

Procurement Documents

No documents of this type are currently available for this project.


Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.

The Public Communications Policy (PCP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.

The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.

In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Project Name Samarkand Solar Power Project
Project Number 45120-004
Country Uzbekistan
Project Status Approved
Project Type / Modality of Assistance Technical Assistance
Source of Funding / Amount
TA 8372-UZB: Samarkand Solar Power Project
Clean Energy Fund - Multi-Donor US$ 750,000.00
Strategic Agendas Environmentally sustainable growth
Inclusive economic growth
Drivers of Change Governance and capacity development
Sector / Subsector Energy - Renewable energy generation - solar
Gender Equity and Mainstreaming No gender elements
Description

The proposed Samarkand Solar Power Project (the Project) aims to increase renewable energy generation and reduce greenhouse gas emissions (GHG) in Uzbekistan. The Project has three main components: (i) construction of a 100 megawatt (MW) grid-connected crystalline photovoltaic (PV) power plant with single axis tracking system; (ii) institutional capacity building on solar energy, and (iii) project management and supervision support.

Uzbekistan has among the highest energy and carbon intensities in the world, both over 6 times the world average. Despite the huge potential, renewable energy supplies only 11% of the country''s power demand, and only from hydro resources. Over 89% of Uzbekistan''s 12.3 gigawatts (GW) of installed capacity are conventional thermal power plants (TPPs) fueled by natural gas (76%), fuel oil (7%), and coal (6%). Half of this fossil-based energy is generated in power plants built before 1982, with only 10% generated in power plants built after 1997. The inefficient power generation is exacerbated by grid losses of 20%, due in part to long distance transmission and distribution. While Uzbekistan is almost 100% electrified, the demand-supply gap (16% unmet demand in 2008) leaves many provinces with intermittent power and has resulted in increased use of and dependence on diesel generators. Some areas in Samarkand have grid electricity for only 1-2 hours in winter, and 16-18 hours in summer, affecting access to education and potable water. With Uzbekistan's demand increasing rapidly, the country's fossil-fuel reserves (reserve to production ratio of 10-12 years for oil, 28-30 years for natural gas, and 40-50 years for coal) will deplete faster. More importantly, the domestic consumption of subsidized gas equals lost export revenues, estimated at $916 million for 2012 alone.

The Project's impact is improved energy security in Uzbekistan, and the outcome is increased renewable energy generation in Uzbekistan.

Project Rationale and Linkage to Country/Regional Strategy

The first of its kind in Central Asia, the project will bring Uzbekistan closer to its vision of becoming the region's solar technology and knowledge hub. Targeting 20% renewable by 2030, Uzbekistan has an ambitious plan to install up to 2 GW of solar capacity.

An ADB policy and advisory TA (PATA) conducted feasibility studies for six solar power projects, the ensuing Project being the first. Onsite measurements of solar and weather data were done in six sites. Energy yield models based on 11-year historical satellite data and validated by ground data were used for the feasibility studies. The PATA also formulated a solar energy development roadmap and proposed enabling policy and regulatory frameworks such as feed-in-tariffs, renewable portfolio standards, and private sector participation, in the medium-term to enable Uzbekistan to reach its targets. Current tariffs are not cost-reflective with 97% of Uzbekistan's energy sector owned by a 100% state-owned utility, SJSC Uzbekenergo.

The Project is aligned with ADB's Strategy 2020 and with a key pillar of the Energy Policy 2009. The Project directly supports Uzbekistan clean energy and energy security targets as prioritized under the ADB Uzbekistan Country Partnership Strategy for 2012-2016 and is identified in the ADB Uzbekistan Country Operations Business Plan 2012-2014.

Impact
Project Outcome
Description of Outcome
Progress Toward Outcome
Implementation Progress
Description of Project Outputs
Status of Implementation Progress (Outputs, Activities, and Issues)
Geographical Location Samarkand
Summary of Environmental and Social Aspects
Environmental Aspects
Involuntary Resettlement
Indigenous Peoples
Stakeholder Communication, Participation, and Consultation
During Project Design TBD
During Project Implementation TBD
Business Opportunities
Consulting Services The PPTA engaged (i) a consulting firm using the quality- and cost-based selection method (quality: cost weighting of 80:20) biodata technical proposals modality; and (ii) individual consultants, following ADB's Guidelines on the Use of Consultants (2010, as amended from time to time).
Responsible ADB Officer Cinderella Tiangco
Responsible ADB Department Central and West Asia Department
Responsible ADB Division Energy Division, CWRD
Executing Agencies
UzbekEnergoMr. Iskandar Basidov, Chairman, Uzbekenergo6 Istiklol Street Tashkent, 100000, Uzbekistan
Timetable
Concept Clearance -
Fact Finding -
MRM -
Approval 29 May 2013
Last Review Mission -
Last PDS Update 30 Mar 2015

TA 8372-UZB

Milestones
Approval Signing Date Effectivity Date Closing
Original Revised Actual
29 May 2013 20 Jun 2013 20 Jun 2013 31 Jan 2014 31 Dec 2015 -
Financing Plan/TA Utilization Cumulative Disbursements
ADB Cofinancing Counterpart Total Date Amount
Gov Beneficiaries Project Sponsor Others
0.00 750,000.00 0.00 0.00 0.00 0.00 750,000.00 29 May 2013 507,947.37
Title Document Type Document Date
Samarkand Solar Power Project Initial Poverty and Social Analysis Sep 2013
Samarkand Solar Power Project Technical Assistance Reports Sep 2013

Safeguard Documents

See also: Safeguards

No documents found.

Evaluation Documents

See also: Independent Evaluation

No documents found.


The Public Communications Policy (PCP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.

Requests for information may also be directed to the InfoUnit.