Nauru: Electricity Supply Security and Sustainability

Sovereign Project | 46455-001

Summary

The impact of the Project will be improved livelihoods of households and businesses served by NUC. The outcome of the Project will be increased reliability and lower cost of electric power service in Nauru. The outputs of the project will be (i) new diesel-fired generation put into service to supply reliable base-load power for NUC, (ii) improvements to existing powerhouse structure, specifically repair/replacement of the existing roof and structural reinforcements (e.g. support columns) as identified.

Latest Project Documents

Title Document Date
Electricity Supply Security and Sustainability Mar 2014

Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.

The Public Communications Policy (PCP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.

The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.

In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Project Name Electricity Supply Security and Sustainability
Project Number 46455-001
Country Nauru
Project Status Closed
Project Type / Modality of Assistance Technical Assistance
Source of Funding / Amount
TA 8524-NAU: Electricity Supply Security and Sustainability
Technical Assistance Special Fund US$ 500,000.00
Strategic Agendas Inclusive economic growth
Drivers of Change Governance and capacity development
Private sector development
Sector / Subsector

Energy - Energy utility services

Gender Equity and Mainstreaming No gender elements
Description The impact of the Project will be improved livelihoods of households and businesses served by NUC. The outcome of the Project will be increased reliability and lower cost of electric power service in Nauru. The outputs of the project will be (i) new diesel-fired generation put into service to supply reliable base-load power for NUC, (ii) improvements to existing powerhouse structure, specifically repair/replacement of the existing roof and structural reinforcements (e.g. support columns) as identified.
Project Rationale and Linkage to Country/Regional Strategy

1. The proposed Electricity Supply Security and Stability grant project will improve the quality and reliability of electricity service of Nauru''s electric utility (Nauru Utilities Corporation, NUC) to its customers. This will be achieved through the delivery and installation of new diesel-fired generation to provide reliable base-load power for NUC, allowing NUC to retire older generation assets and perform scheduled refurbishment of existing units to extend their service lives. The project will also include improvements to the existing structure housing NUC''s generation units (the powerhouse).

2. NUC''s power sector operations have been the subject of considerable study and review by external development agencies over the past three years. The poor state of NUC's physical assets, and weaknesses of its management systems, are well documented. Nauru''s current diesel-fired generation fleet remains dilapidated, unreliable, and extremely inefficient. All of NUC''s installed generators are operating at far below their capacity, and are nearing the end of their useful lives. The powerhouse is likewise in poor condition, which represents a vulnerability to Nauru''s supply security. While Nauru is virtually 100% electrified, service reliability is extremely poor. Unscheduled and often prolonged interruptions are frequent. As in other parts of the Pacific where significant intermittent renewable generation sources are being introduced into legacy diesel-based systems, Nauru will remain reliant on diesel generation for its baseload and for system stability and reliability for the foreseeable future.

3. The Australian Government has provided millions of dollars of support to NUC over the past decade to cover recurring costs and the procurement of distribution and generation assets. Recently, the Australian Government has shifted its support to build NUC''s capacity by funding the appointment of expatriate management-level personnel to address long-term systemic shortcomings within NUC. The European Union has recently extended a $1.3 million grant for NUC to fund the procurement and installation of distribution transformers, conductors, poles, and essential maintenance and safety equipment for linemen to bolster network reliability and efficiency.

4. Urgent investment requirements have been identified as high priorities to improve service reliability and mitigate the risk of catastrophic failure of NUC''s power generation. Among NUC''s investment priorities are structural improvements to the powerhouse and the introduction of 2.8-3.0 MW (estimated) of new diesel-fired generation to replace existing generation, improve reliability, and reduce fuel costs. NUC estimates that this will result in a 20% improvement in generation efficiency from the current 3.4 kWh to 4.1 kWh generated per liter of diesel consumed. The introduction of reliable and more efficient diesel generation will also allow NUC to schedule retirement or rehabilitation of existing, ageing assets and provide for improved reliability.

5. In consideration of the above, and following extensive consultation with Nauru stakeholders, the focus of the proposed grant will be to address the reliability of Nauru''s diesel-fired generation, which is vital to the functioning of Nauru''s economy. Procurement of new, fuel efficient generation capacity will serve near-term system reliability needs, and is entirely consistent with Nauru''s policy orientation in favor of the introduction of significant renewable (solar) capacities, as Nauru''s power system will continue to rely on diesel for baseload generation.

6. The proposed project is included in the ADB Country Operations Business Plan for Nauru (2014-2016), which prioritizes investment in improving the energy-efficiency of Nauru''s economy, characterized as the least energy-efficient in the Pacific. The project is entirely consistent with the Government of Nauru''s policy priorities and draft Energy Road Map (expected to be formally adopted in Q4 2013). The proposed project aligns well with other donors' support to Nauru''s energy sector. Australian Government support to NUC''s management is expected to continue. The European Union''s program for distribution system upgrades and rehabilitation addresses corresponding investment requirements in network capacity, reliability, and loss reduction. Improvement in reliability and efficiency of Nauru''s base-load diesel generation fits with Nauru''s long-term sector objective of increasing generation from renewable sources.

Impact
Project Outcome
Description of Outcome
Progress Toward Outcome
Implementation Progress
Description of Project Outputs
Status of Implementation Progress (Outputs, Activities, and Issues)
Geographical Location
Summary of Environmental and Social Aspects
Environmental Aspects
Involuntary Resettlement
Indigenous Peoples
Stakeholder Communication, Participation, and Consultation
During Project Design
During Project Implementation Project was completed October 2014.
Business Opportunities
Consulting Services The PPTA will require five international consultants (ten months) and one national consultant (two months) to be hired through a consulting firm. Consultants will be engaged by ADB in accordance with the Guidelines on the Use of Consultants (2013, as amended from time to time). The consulting firm will be engaged through the quality- and cost-based selection method (quality-cost ratio of 90:10) using a simplified technical proposal. The procurement of equipment by consultants under the technical assistance will follow ADB's Procurement Guidelines (2013, as amended from time to time). The proceeds of the technical assistance will be disbursed in line with ADB's Technical Assistance Disbursement Handbook (2010, as amended from time to time). The equipment procured under the technical assistance will be turned over to NUC upon technical assistance completion.
Procurement The project will be implemented over a two-year period. The Ministry of Commerce, Industry and Environment (MCIE) will serve as the Executing Agency. NUC will serve as the Implementing Agency, and will host a Project Management Unit (PMU), to be supported by implementation consultants. A Project Steering Committee (PSC) will be established to oversee project implementation. The PSC will comprise NUC general manager for power operations, a representative of the European Union, and representatives of other contributing donor agencies (if any). Consultants will be recruited per ADB's Guidelines on the Use of Consultants (2013, as amended from time to time), through a consulting firm. Procurement of works, goods, equipment, and other services will be carried out in accordance with ADB's Procurement Guidelines (2013, as amended from time to time) and will likely be conducted through international competitive bidding (ICB), national competitive bidding (NCB) or shopping procedures (international), as appropriate. Universal procurement will apply. Project disbursements will be in accordance with ADB's Loan Disbursement Handbook (2012, as amended from time to time).
Responsible ADB Officer J. Michael Trainor
Responsible ADB Department Pacific Department
Responsible ADB Division Transport, Energy and Natural Resources Division, PARD
Executing Agencies
Ministry of Commerce, Industry and EnvironmentGovernment House
Yaren, Nauru
Timetable
Concept Clearance -
Fact Finding -
MRM -
Approval 28 Nov 2013
Last Review Mission -
Last PDS Update 28 Nov 2014

TA 8524-NAU

Milestones
Approval Signing Date Effectivity Date Closing
Original Revised Actual
28 Nov 2013 10 Jan 2014 10 Jan 2014 30 Jun 2014 31 Oct 2014 -
Financing Plan/TA Utilization Cumulative Disbursements
ADB Cofinancing Counterpart Total Date Amount
Gov Beneficiaries Project Sponsor Others
500,000.00 0.00 0.00 0.00 0.00 0.00 500,000.00 28 Nov 2013 364,285.00
Title Document Type Document Date
Electricity Supply Security and Sustainability Technical Assistance Reports Mar 2014

Safeguard Documents

See also: Safeguards

No documents found.

Evaluation Documents

See also: Independent Evaluation

No documents found.


The Public Communications Policy (PCP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.

Requests for information may also be directed to the InfoUnit.