China, People's Republic of : Chemical Industry Energy Efficiency and Emission Reduction Project
The proposed first two subprojects include (i) demonstration of a new technology by Dezhou Shihua Chemical Co., Ltd. (DSC) to retrofit its polyvinyl chloride (PVC) production facility to reduce energy consumption by 40% and eliminate the use of mercury as a catalyst; and (ii) retrofitting the caustic soda production chain of Haohua Yuhang Chemical Co. Ltd. (HYC) with the current state-of-the-art technology that will consume 30% less energy.
Project Details
-
Project Officer
Seiler, Annika
East Asia Department
Request for information -
Country/Economy
China, People's Republic of -
Modality
-
Sector
- Energy
Related Projects
Project Name | Chemical Industry Energy Efficiency and Emission Reduction Project | ||||
Project Number | 47051-001 | ||||
Country / Economy | China, People's Republic of |
||||
Project Status | Closed | ||||
Project Type / Modality of Assistance | Technical Assistance |
||||
Source of Funding / Amount |
|
||||
Strategic Agendas | Environmentally sustainable growth Inclusive economic growth |
||||
Drivers of Change | Private sector development |
||||
Sector / Subsector | Energy / Energy efficiency and conservation |
||||
Gender | |||||
Description | The proposed first two subprojects include (i) demonstration of a new technology by Dezhou Shihua Chemical Co., Ltd. (DSC) to retrofit its polyvinyl chloride (PVC) production facility to reduce energy consumption by 40% and eliminate the use of mercury as a catalyst; and (ii) retrofitting the caustic soda production chain of Haohua Yuhang Chemical Co. Ltd. (HYC) with the current state-of-the-art technology that will consume 30% less energy. | ||||
Project Rationale and Linkage to Country/Regional Strategy | The proposed Chemical Industry Energy Efficiency and Emission Reduction Project will support demonstration of innovative technologies to improve energy efficiency and reduce emissions of pollutants from various plants belonging to the China National Chemical Corporation Group (ChemChina). Building up on the lessons learned from previous successful Asian Development Bank (ADB) loans in Anhui, Guangdong, Shandong, and Hebei provinces, this project proposes for the first time to directly cooperate with a large state-owned enterprise (SOE) to support industry-specific measures. It will also develop an innovative financing structure to leverage commercial cofinancing and mainstream energy service company (ESCO) participation from the beginning of project implementation. The innovative financing structure will be developed and firmed up during the early stage of the project preparatory technical assistance (PPTA) implementation. Energy efficiency investments are essential to curb demand growth and reduce carbon dioxide emissions. The International Energy Agency projects that energy efficiency improvements could account for 70% of the reduction in global energy demand in 2035. However, without demonstrating best available technologies, stronger policies and more innovative financing mechanisms, the agency warns that more than half of the economic potential may remain untapped. The People's Republic of China (PRC) is the world's largest energy consumer accounting for nearly 20% of global energy consumption. Its rapid energy consumption growth over the past 20 years was and continues to be mainly driven by industrial energy demand growth, which accounted for 71% of the total energy consumption in 2010. The chemical industry is among the PRC's (i) largest industrial energy users, and (ii) most energy-intensive industries. It alone consumed 361.2 million ton of coal equivalent (tce) in 2010, accounting for about 16% of industrial energy use. Compared to the PRC's average energy intensity of 1.034 tce per CNY10,000 of gross domestic product, ChemChina's energy intensity was 2.66 in 2010. During the Eleventh Five-Year-Plan, 20062010, the PRC successfully targeted energy-intensive industries to realize energy savings and emission reduction through (i) mandating energy savings target on 1,000 key energy consuming plants, (ii) subsidizing energy efficiency investments, (iii) strengthening capacity of banks and ESCOs by multiple multilateral and bilateral cooperation projects, and (iv) undertaking other complementary administrative measures. These policy measures were continued, further strengthened and expanded to 10,000 key industries in the Twelfth Five-Year Plan, 20112015. However, important market barriers still remain in energy-intensive industries such as chemical industry, which continues to slow down or prevent investment in large-scale, innovative technology energy efficiency and emission reduction retrofits through the market. These barriers include (i) limited market-based incentives to implement such projects; (ii) lack of knowledge by enterprises about the best available technologies, combined with their focus on capacity expansion; (iii) inadequate capacity in commercial banks in evaluating risks and benefits of such retrofit projects combined with the projects' insufficient collateral value; and (iv) the underdevelopment of the industry-specific ESCO that can plan and implement such projects. To address these barriers and to enhance the overall impact of the proposed project, it is essential to develop and test new and innovative solutions to financing such projects and strengthen the ESCO model. The project is directly relevant to achieve the objectives of the PRC's 12th plan for energy saving and emission reduction which targets to reduce (i) energy intensity by 16%, (ii) carbon intensity by 17%, and (iii) sulfur dioxide by 8% and nitrogen oxides by 10% from 2010 levels by 2015. It has a particular good fit with major tasks emphasized in the 12th plan of (i) strengthening industrial energy saving, and (ii) advancing emission reduction of major pollutants in key industries. The project is also consistent with the ADB's country partnership strategy, 20112015 for the PRC, which is closely aligned to the 12th plan priorities to support environmentally sustainable growth by demonstrating cutting-edge energy efficiency technologies. The proposed first two subprojects include (i) demonstration of a new technology by Dezhou Shihua Chemical Co., Ltd. (DSC) to retrofit its polyvinyl chloride (PVC) production facility to reduce energy consumption by 40% and eliminate the use of mercury as a catalyst; and (ii) retrofitting the caustic soda production chain of Haohua Yuhang Chemical Co. Ltd. (HYC) with the current state-of-the-art technology that will consume 30% less energy. As per the International Energy Agency, caustic soda and PVC production consumes about two-thirds of total primary energy in the chemical industry worldwide. By targeting these two energy-intensive production processes, the project aims for larger impact on energy efficiency and emission reductions in chemical industry in the PRC. Similarly, by mainstreaming ESCO in the project's structure, the project will address a key barrier that has so far prevented industry-specific ESCO participation in energy efficiency retrofits in energy-intensive industries in the PRC. If proven successful, it may unleash ESCO model across energy-intensive industries. |
||||
Impact |
Project Outcome | |
---|---|
Description of Outcome | |
Progress Toward Outcome | |
Implementation Progress | |
Description of Project Outputs | |
Status of Implementation Progress (Outputs, Activities, and Issues) | |
Geographical Location | Nation-wide |
Summary of Environmental and Social Aspects | |
---|---|
Environmental Aspects | |
Involuntary Resettlement | |
Indigenous Peoples | |
Stakeholder Communication, Participation, and Consultation | |
During Project Design | |
During Project Implementation | Consultant services have been completed and loan negotiations for the proposed loan project was completed on 7-8 September 2015. A legal expert will be recruited to assist in drafting the subloan and onlending agreements. |
Business Opportunities | |
---|---|
Consulting Services | The PPTA will be implemented in two parts. Part 1 will focus on the (i) development of an innovative ESCO financing mechanism, and (ii) energy audit and environmental impact assessment (EIA). A review of ChemChina and chemical industry energy efficiency and emission reduction market assessment and barrier analysis will also be undertaken during part 1. Since these activities are independent activities, four individual consultants (2 international for a total of 6.5 person-months and 2 national for a total of 7 person-months) will be recruited in accordance with ADB's Guidelines on the Use of Consultants (2010, as amended from time to time). The energy efficiency finance experts will work closely with ChemChina, NDRC, and ADB to develop the financing mechanism. The international environment expert will be supported by a national technical expert to prepare the energy audit and the EIA. Part 2 will be undertaken by a consulting firm, which will prepare the technical, economic, and financial due diligence of the subprojects to be undertaken. It will also provide capacity strengthening and project implementation support and capacity development measures to the project management office and other stakeholders, if needed. The detailed tasks to be undertaken by the consulting firm will be firmed up towards the end of the part 1. The consulting firm will be recruited in accordance with ADB's Guidelines on the Use of Consultants (2010, as amended from time to time) through quality- and cost-based selection method (with a quality-cost ratio of 80:20) following the simplified technical proposal. |
Responsible ADB Officer | Seiler, Annika |
Responsible ADB Department | East Asia Department |
Responsible ADB Division | Energy Division, EARD |
Executing Agencies |
China National Chemical Corporation Group |
Timetable | |
---|---|
Concept Clearance | - |
Fact Finding | - |
MRM | - |
Approval | 17 Jun 2013 |
Last Review Mission | - |
Last PDS Update | 23 Sep 2015 |
TA 8383-PRC
Milestones | |||||
---|---|---|---|---|---|
Approval | Signing Date | Effectivity Date | Closing | ||
Original | Revised | Actual | |||
17 Jun 2013 | 17 Jul 2013 | 17 Jul 2013 | 15 Sep 2014 | 31 Jan 2016 | 19 Jul 2016 |
Financing Plan/TA Utilization | Cumulative Disbursements | |||||||
---|---|---|---|---|---|---|---|---|
ADB | Cofinancing | Counterpart | Total | Date | Amount | |||
Gov | Beneficiaries | Project Sponsor | Others | |||||
700,000.00 | 0.00 | 150,000.00 | 0.00 | 0.00 | 0.00 | 850,000.00 | 17 Jun 2022 | 629,770.28 |
Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.
The Access to Information Policy (AIP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.
The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.
In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
Title | Document Type | Document Date |
---|---|---|
化工节能减排项目 : 项目数据表 | Translated PDS | Apr 2015 |
Chemical Industry Energy Efficiency and Emission Reduction Project: Project Preparatory Technical Assistance Report | Technical Assistance Reports | Jun 2013 |
Safeguard Documents See also: Safeguards
Safeguard documents provided at the time of project/facility approval may also be found in the list of linked documents provided with the Report and Recommendation of the President.
None currently available.
Evaluation Documents See also: Independent Evaluation
None currently available.
Related Publications
None currently available.
The Access to Information Policy (AIP) establishes the disclosure requirements for documents and information ADB produces or requires to be produced in its operations to facilitate stakeholder participation in ADB's decision-making. For more information, refer to the Safeguard Policy Statement, Operations Manual F1, and Operations Manual L3.
Requests for information may also be directed to the InfoUnit.
Tenders
Contracts Awarded
Procurement Plan
None currently available.