47928-014: Dahej Liquefied Natural Gas Terminal Expansion Phase III

Project Data Sheet (PDS): Overview


Description

The project will expand the capacity of the existing Dahej Terminal from 10 million metric tonnes per annum (mmtpa)to 15 mmtpa and involves the construction and operation, on a build-operate-transfer basis, of 2 storage tanks, regasification facilities and installation of associated utilities and facilities. The project design is based on a take-or-pay toll, with Petronet LNG acting as a tolling agent. The construction period is scheduled to be 42 months. The project is expected to begin commercial operations in 2017. The majority of the LNG is destined for north and west India where the gas will be fed into the national grid as a cleaner fuel for electricity generation. Read More

Country India
Borrower/Equity Investment Name PETRONET LNG LTD
Project Number 47928-014
Project Type or Modality of Assistance PS
Financing Private sector (Nonsovereign)
Status Approved
Approval Number 7396
Approval Date 05 Dec 2013
Geographical Location Dahej, Bharuch District, Gujarat
Sector / Subsector Classification Not yet classified
/ For Classification
Thematic Classification Not yet classified
Safeguard Categories Environment: A
Resettlement: C
Indigenous People: C

Related News

 

 

Project Data Sheets (PDS) contain summary information on the project or program. Because the PDS is a work in progress, some information may not be included in its initial version but will be added as it becomes available. Information about proposed projects is tentative and indicative.

The Public Communications Policy (PCP) recognizes that transparency and accountability are essential to development effectiveness. It establishes the disclosure requirements for documents and information ADB produces or requires to be produced.

The Accountability Mechanism provides a forum where people adversely affected by ADB-assisted projects can voice and seek solutions to their problems and report alleged noncompliance of ADB's operational policies and procedures.

In preparing any country program or strategy, financing any project, or by making any designation of, or reference to, a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Project Data Sheets (PDS)

Responsible ADB Officer
Siddhartha Shah
Email contact

Responsible ADB Department
Private Sector Operations Department

Responsible ADB Divisions
Infrastructure Finance Division 1

PDS Creation Date
19 Nov 2013

Last PDS Update
22 Nov 2013