Air Transport Connectivity Enhancement Project

Date: May 2012
Country:
Subject:
Document Type: Reports and Recommendations of the President
Project Number: 44239-013

Download Document



Description

Report and recommendation of the President describing terms and conditions proposed for the Air Transport Connectivity Enhancement Project in Bhutan, for the approval of the Board of Directors of ADB.

The project aims to strengthen safety and security, and enhance capacity, including priority needs for securing the airport perimeter; expanding terminal space, air craft parking apron, and taxiway; improving runways; and installing aeronautical communication and navigation aid equipment for the Bumthang, Gelephu, and Yonphula domestic airports.