BLCP Power Project: Annual Report (January-December 2011)

Date: July 2012
Country:
Subject:
Document Type: Social and Environmental Monitoring Reports / Environmental Monitoring Reports
Project Number: 37904-014

Description

The annual report on environmental quality monitoring and mitigation measures implementation for the operation period from January to December 2011 of BLCP Power Plant and Coal Unloading Facilities Project consists of monitoring measures following the plan. The report contents are complied with Guidelines for Environmental Monitoring of ONEPP. The report consists of introduction, mitigation measures implementation audit, monitoring results and appendixes.